Applications of Building Information Modeling in Cost Estimation of Infrastructure Bridges

2012 ◽  
Vol 1 (2) ◽  
pp. 17-29 ◽  
Author(s):  
Mohamed Marzouk ◽  
Mohamed Hisham

Bridge Information Modeling (BrIM) is considered an innovation in bridge engineering and construction industry. This paper presents a methodology for using BrIM as an assisting tool in performing detailed cost estimates. The methodology depends on integrating visualization feature of BrIM with specific attributes of the BrIM model intelligent components. A program developed using C# language is used to extract the visualization conclusions and other components’ attributes to MS Excel spreadsheet. This sheet assists in performing detailed cost estimate, and reviewing the estimate. The paper also presents a methodology for generating cash flow and required payments. This methodology depends on integrating the developed program with 4D feature of BrIM.

Author(s):  
Aryani Ahmad Latiffi ◽  
Suzila Mohd ◽  
Juliana Brahim

Building Information Modeling (BIM) represents a new paradigm in the Malaysian architecture, engineering, and construction (AEC) industry. BIM technology provides virtual models (including 3-D models) to generate a building’s entire lifecycle. The model can also be used for analyzing design clashes, project scheduling, cost estimation, and facility management. The use of BIM in construction projects can reduce time to develop a project, reduce construction cost, and increase project quality. This paper aims to explore roles of BIM in the Malaysian construction industry. Semi-structured interviews were conducted with project consultants and BIM consultants involved in two government projects. The projects were the National Cancer Institute (NCI) Malaysia and Sultan Ibrahim Hall (formerly known as the Multipurpose Hall of Universiti Tun Hussein Onn Malaysia, or UTHM). The interviews revealed effects of BIM in both projects and potential improvement in implementing BIM in construction projects in Malaysia. A literature review and the interviews revealed that BIM is increasingly used and accepted by construction players in Malaysia, and is expected to grow in future.


2020 ◽  
Vol 6 (10) ◽  
pp. 1974-1982
Author(s):  
Musab Abuaddous ◽  
Ja’far A. Aldiabat Al-Btoosh ◽  
Mohammed A. KA. Al-Btoush ◽  
Abdulrazzaq Jawish Alkherret

Most governmental projects in Jordan have cost overrun, it rises during the on-going stage to increase the cost and prolong the time of the project. Unfortunately, until this moment, there is no particular management system in Jordan construction industry to minimize cost overrun and variation order adopted by the government. In contrast, global construction industry has witnessed a huge transformation in terms of the use of digital technologies, particularly Building Information Modeling (BIM) which is a revolutionary digital technology and operation that is reshaping the Architecture, Engineering and Construction (AEC) industry. approach and objectives causes before of this paper are firstly to review the factors contributing to variation orders in governmental road projects in Jordan, secondly, to propose a BIM design applications strategy to minimize variation orders, to achieve the objectives a quantitative approach was followed by distributing a questionnaire, then the data was analyzed statistically using relative importance index, the results were as follow. Our findings suggests that the most important factors causing change orders were as follow: Inaccurate quantity take-off (0.66); Labours or material not meeting the specifications (0.63); Logistic delays (0.60); Internal politics (0.566); and the equipment and tools are not available (0.55). The results also indicate that Contract Parties, Consultant, Contractor and Other Variations had significant positive effects on V. O, whereas the effects of BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection, (BIM Quantity Take-off and Cost Estimation) had a passive impact on V.O. Lastly, BIM has obtained a great reputability by enhancing the productivity in construction society, minimizing the total cost of the projects, and many other benefits.


2014 ◽  
Vol 501-504 ◽  
pp. 2700-2705 ◽  
Author(s):  
Li Shen ◽  
Ya Xing Lin

The application of Building Information Modeling has become a trend in construction industry, it is our duty to accelerate BIM application in recent years. Firstly, the paper generally introduced the concepts and characteristics of BIM, and pointed out the problems that existed in Chinas Project Management of Construction Enterprises, and theoretically, technically discussed the solutions to these issues with BIM technology in a qualitative way. At last, the paper proposed some suggestions and outlooks for the development and promotion of BIM technology in China.


Author(s):  
Sagar V. Mundhokar

Abstract: Construction industry is believed to be one of the most criticized industries worldwide. During the last two decades, this criticism has denoted a lot of problems. Without disregarding any of the industry problems, it seems that the most criticized problems are low delivery performance, lack of innovation, lack of collaboration and fragmented nature of the industry. To overcome these problems, a collaborative work environment is needed. During the last few years, the use of advanced information technologies in construction hasincreased to support the industry requirement of collaboration environment. Keywords: Building Information Modeling BIM, BIMimplementation, BIM Barriers


2018 ◽  
Vol 147 ◽  
pp. 06002
Author(s):  
Fauzan Alfi Agirachman ◽  
Ilham Fajar Putra ◽  
Adam Angkawijaya

This paper presents our initial study on Building Information Modeling (BIM) adoption urgency for architecture, engineering and construction (AEC) industry in Indonesia. Currently, BIM is being adopted by many countries around the world because of its’ efficiency and other benefits. Meanwhile, most of AEC industries in Indonesia still using the conventional method and there are no regulations from Indonesian AEC authority for adopting BIM. With that situation, a study of BIM adoption in Indonesian AEC industries is important. This study uses a qualitative approach with explorative type. Input from the survey is evaluated qualitatively using content analysis, distribution analysis and correspondence analysis method. Based on analysis result, it shows that BIM as a mean to encourage a more sustainable approach in AEC industry is still in its development phase but it shows great potentials and it gives stakeholders a better way to achieve sustainable built environment. Current lack of awareness and understanding of BIM in Indonesia, particularly in the education sector, is a key factor that impedes BIM adoption and one that can be addressed by integrating BIM into AEC curriculum. Government and practitioners alike need to develop a strategic roadmap to pave way for successful BIM implementation.


Sign in / Sign up

Export Citation Format

Share Document