The Research on the Management of Project Group for Flexibility Based on Fuzzy Comprehensive Evaluation

2011 ◽  
Vol 121-126 ◽  
pp. 4842-4846
Author(s):  
Yun Ning Zhang ◽  
You Hong Cai

Project group is characteristic of dynamic uncertainty and higher complexity ,which decides its management methods need to have enough flexibility. Based on the analysis of the flexible influence factors of the project group of management, the paper constructs the project group management flexibility evaluation index system, introduces fuzzy comprehensive evaluation method to the evaluation, and in order to increase its objectivity and feasibility ures the gray correlation analysis method to determine the weights during the process of solving. Finally provides an application example to show that the method is effective and practical.

2013 ◽  
Vol 859 ◽  
pp. 511-514 ◽  
Author(s):  
Jing Jing Wan ◽  
Ying Hua Song

This paper has put forward a comprehensive assessment model of the emergency management capability of the coal mine accidents which is based on AHP and fuzzy comprehensive evaluation, and has made an empirical analysis. Firstly, the meaning and the key contents of the emergency management capability of coal mine accidents was elaborated. Secondly, the comprehensive evaluation index system of coal mine accidents emergency management capability was established. And then, the first class index weights were determined by AHP. Finally, this paper made a comprehensive evaluation of a certain regions emergency management capability of coal mine accidents by means of the fuzzy comprehensive evaluation.


2013 ◽  
Vol 357-360 ◽  
pp. 2754-2758
Author(s):  
Chang An Zhou ◽  
Can Chen ◽  
Hong Ren

According to constraint elements more and more appearing in the comprehensive forms, and at present it only considers that single constraint element of city underground space development and utilization has been unable to reflect the actual situation. On the basis of the main characteristics of city underground space development and utilization, this paper aims to analyze various factors which may cause the consequence and the frequency of appearance, and to construct evaluation index system of city underground space development and utilization which is composed of 5 one-level indexes, 20 two-level indexes of evaluation index system of multiple constraint factors of city underground space development and utilization, and to use the analytic hierarchy process and fuzzy comprehensive evaluation method to analyze and evaluate the influence on city underground space development and utilization. Analysis of the example application shows that, it only considers single constraint element of city underground space development and utilization is not comprehensive, and not science, and it needs to consider the correlation between various constraint elements.


2012 ◽  
Vol 524-527 ◽  
pp. 3750-3753 ◽  
Author(s):  
Zhan Feng Zhou

Implementation of reverse logistics is the foundation of developing circular economy and realizing sustainable development. According to the characters of green logistics, multi level evaluation index system of green degree of reverse logistics system is built in this paper, the weight of each index is determined by using the analytic hierarchy process, the system green degree is evaluated by applying the fuzzy comprehensive evaluation method and the result is analyzed. The result shows that the method is simple, accurate and has a good application.


2014 ◽  
Vol 1073-1076 ◽  
pp. 2852-2856
Author(s):  
Zhi Jin Xu ◽  
Yan Kui Song

The implemented performance of enterprise’s patent strategy is an important component to measure its comprehensive benefits. It is of strategic significance for an enterprise to evaluate objectively its implemented performance of patent strategy. From the perspective of sustainable development, according to the 4 aspects of creation, application, protection and management of patent, the essay constitutes preliminarily a comprehensive evaluation index system of the implemented performance of enterprise’s patent strategy which is composed of a set of 21 indexes on the basis of an amount of domestic and foreign literature survey, case study and expert consultation, and analyzes the evaluation model and method of implemented performance of enterprise’s patent strategy with the fuzzy comprehensive evaluation and through a real case. The essay thinks the constitution of evaluation index system should obey a series of basic principles of objectivity, systematization, science and conciseness and the evaluation in essence is multi-object, multi-factor and multi-layer. Therefore, it is effective and feasible to select the Fuzzy Comprehensive Evaluation method.


2012 ◽  
Vol 253-255 ◽  
pp. 1593-1597 ◽  
Author(s):  
Jian Long Yan ◽  
Yong Cheng ◽  
An Hu Zhang ◽  
Yun Gang Zhao

Highway collapse hazard is the combined result of many factors. Based on the formation mechanism of the road collapse hazard and main the factors, they are selected from three aspects of risk assessments master factor: the regional geological structure, slope characteristics, and regional environmental characteristics, also ultimately select the spacing of the joints, slope lithology, slope structure, slope height, slope gradient, rainfall (rainfall in 24 hours to ≥ 25mm of days), the vegetation coverage degree and earthquake strong eight main control factors, above all these factors, they established a road collapse hazard evaluation index system. Based on the fuzzy comprehensive evaluation method, it establishes a road collapse hazard evaluation model. Analytic Hierarchy Process is used to determine the evaluation index system of layers in index weight values. Risk index is based on the evaluation criteria. Finally, an empirical study of two highway projects instances.


2021 ◽  
Vol 248 ◽  
pp. 03056
Author(s):  
He Xiaoyu

This paper analyzes the application value of BIM technology in industrial building projects and the improvement of building industrialization level. Firstly, an evaluation index system of building industrialization level based on BIM technology is established, which consists of 4 first-level indicators and 16 second-level indicators; then, the Analytic Hierarchy Process is used to determine the corresponding weight value of each index; finally, the BIM platform function is used to collect data, and the fuzzy comprehensive evaluation method is used to calculate the evaluation results of the evaluated objects, so as to realize the effective evaluation of the building industrialization level.


2013 ◽  
Vol 805-806 ◽  
pp. 725-729
Author(s):  
Zi Xue Guo ◽  
Nan Nan Liu ◽  
Xin Lu

The thermal power units operational reliability is the fundamental guarantee of smooth operation of electricity system. According to the problem of thermal power units operational reliability evaluation, a comprehensive evaluation method is put forward based on grey fuzzy theory. Firstly, this paper establishes an evaluation index system by the analysis of factors affecting the reliability of thermal power units. And then a reliability evaluation model of thermal power units operation is built based on grey fuzzy comprehensive evaluation which combined with the grey cluster theory and the fuzzy algorithm. At last, the numerical example is shown to verify the feasibility of the grey fuzzy comprehensive evaluation method.


2020 ◽  
Vol 12 (15) ◽  
pp. 6239 ◽  
Author(s):  
Hao Gu ◽  
Xiao Fu ◽  
Yantao Zhu ◽  
Yijun Chen ◽  
Lixian Huang

A large proportion of the dams in China are earth-rock dams. Regarding the well-studied loss of life and economic consequences due to dam breaks, this paper introduces the causes and modes of earth-rock dam breaks and the corresponding dam-break losses in terms of the social and environmental aspects. This study formulates the evaluation index system and criteria of earth-rock dam breaks’ impact on society and the environment based on a fuzzy comprehensive evaluation method. The results show that the evaluation grade of the social and environmental impact of the dam break of the Liujiatai Reservoir was “serious”. Therefore, similar dams in China should take corresponding measures in advance to reduce the social and environmental impact of earth-rock dam breaks.


2013 ◽  
Vol 791-793 ◽  
pp. 2192-2195
Author(s):  
Xiao Ji Chen ◽  
Jing Zhong Liu ◽  
Xia Peng

With the rapid development of Japan-oriented software outsourcing, the demand for talent of computer science is increasing, reasonably making evaluation of talents comprehensive skills on Japan-oriented software outsourcing is important. This paper use fuzzy comprehensive evaluation method to research. First, show the evaluation index system and the weight of references; Then, the establish mathematical models of fuzzy evaluation, including single indicators of fuzzy evaluation and fuzzy comprehensive evaluation; The results of this research have the following characteristics, comprehensive consider various factors, objectively reflect the actual situation, simply use, evaluate accurately and reasonably, and in actual application, people should use evaluation method flexibly.


2011 ◽  
Vol 328-330 ◽  
pp. 2362-2366
Author(s):  
Ya Wen Dong ◽  
Bao Feng Zhang ◽  
Wen Hui Liu

Probing into the industry characteristics of construction operations and the necessity to make ergonomic improvement for construction operations, this paper analyzed the current research situation of the literature both at home and abroad which apply ergonomic principles to make improvement in construction operations. This study shows that the existing research on ergonomic improvement of construction operations mainly focus on construction safety and specific operations improvement, at the same time, the system research on the ergonomic improvement of construction operations is less. Making a China's leading internationalized construction service company as the object of empirical research, this paper designed the evaluation index system of construction operations’ man-machine-environment system from three factors of human, machine and environment. And applying the Fuzzy Comprehensive Evaluation Method, the paper evaluated the validity of the man-machine-environment system. At last, aiming at the evaluation results, some improvements were given in view of Ergonomics.


Sign in / Sign up

Export Citation Format

Share Document