The Research on the Management of Project Group for Flexibility Based on Fuzzy Comprehensive Evaluation
2011 ◽
Vol 121-126
◽
pp. 4842-4846
Keyword(s):
Project group is characteristic of dynamic uncertainty and higher complexity ,which decides its management methods need to have enough flexibility. Based on the analysis of the flexible influence factors of the project group of management, the paper constructs the project group management flexibility evaluation index system, introduces fuzzy comprehensive evaluation method to the evaluation, and in order to increase its objectivity and feasibility ures the gray correlation analysis method to determine the weights during the process of solving. Finally provides an application example to show that the method is effective and practical.
2013 ◽
Vol 859
◽
pp. 511-514
◽
2013 ◽
Vol 357-360
◽
pp. 2754-2758
2012 ◽
Vol 524-527
◽
pp. 3750-3753
◽
2014 ◽
Vol 1073-1076
◽
pp. 2852-2856
2012 ◽
Vol 253-255
◽
pp. 1593-1597
◽
2013 ◽
Vol 805-806
◽
pp. 725-729
2013 ◽
Vol 791-793
◽
pp. 2192-2195
2011 ◽
Vol 328-330
◽
pp. 2362-2366