Decision Evaluation of Harbin Metro Based on Fuzzy Theory

2013 ◽  
Vol 438-439 ◽  
pp. 1024-1027
Author(s):  
Xiao Guo Chen

The paper introduces some information about Harbin Metro line 1, makes the decision analysis on economies, environment, society and geological environment of Harbin Metro line 1 by some fuzzy comprehensive evaluation model, and gives the weight coefficients of indicators through analytic hierarchy process. The comprehensive evaluation result provides the basis for decision-makers during decision of metro projects.

2012 ◽  
Vol 204-208 ◽  
pp. 2028-2033 ◽  
Author(s):  
Zhong Chu Tian ◽  
Lei Yang ◽  
Tian Yong Jiang

The risk factors of continuous incremental launching bridge during construction stage are specialized. The risk in incremental launching stage is analyzed and identified. A risk assessment index system is built. A fuzzy comprehensive evaluation model is developed. The results obtained from the risk assessment model verifies the validity and practicality of the developed method by the combination of analytic hierarchy process and fuzzy mathematics theory. Moderate risk assessment results are developed to provide references for incremental launching construction method.


2011 ◽  
Vol 308-310 ◽  
pp. 1193-1197
Author(s):  
Li Hua Tao ◽  
Ren Jiang Li ◽  
Jun Feng Bai

In order to evaluate a RMS roundly and objectively, a multi-level fuzzy comprehensive evaluation approach based on analytic hierarchy process (AHP) is proposed in this paper. Firstly, a hierarchical and comprehensive evaluation index system for RMSs is extracted. Then, based on this structure, a multi-level fuzzy comprehensive evaluation model is developed, in which AHP is incorporated to determine factor weights.


2014 ◽  
Vol 701-702 ◽  
pp. 1352-1358
Author(s):  
Xiao Ping Wang ◽  
Li Jiang ◽  
Jia Ming Zhong

First, it obtains the university teacher performance evaluation index framework by utilizing Delphi method. Then, it constructs the comprehensive quality evaluation hierarchy model by applying the analytic hierarchy process, to obtain the weight for each index, and based on which to establish fuzzy comprehensive evaluation model. After this, it acquires a new method for university teachers' performance evaluation, and provides examples to prove the feasibility and effectiveness of this method.


2014 ◽  
Vol 584-586 ◽  
pp. 2215-2219
Author(s):  
Yi Xuan Wang ◽  
Ying Wei Ren ◽  
Yong Heng Yao

According to the characteristics of resource allocation for engineering construction programme, the comprehensive evaluation model of resource allocation rationality for programme is established with the combination of analytic hierarchy process and fuzzy comprehensive evaluation method. The rationality of resource allocation for programme is evaluated objectively based on the assessment of correlation degree between monomer project and the programme and the evaluation of resource allocation rationality for monomer projects. And the evaluation results have been analyzed and sorted through the principle of weighted average.


2013 ◽  
Vol 683 ◽  
pp. 686-689
Author(s):  
Yang Liu ◽  
Guo Ping Cheng

Through analysing the indexs of the steel industry supply chain financing default risk, the article establishes a multi-level fuzzy comprehensive evaluation model for the steel industry supply chain financing default risk. Application examples show that the model overcomes the defect of subjective evaluation. It’s a rational and effective tool to assess the default risk of the steel industry supply chain financing.


2011 ◽  
Vol 97-98 ◽  
pp. 644-647 ◽  
Author(s):  
Yang Yang ◽  
Tao Pu ◽  
Kun Ying Li

Priority order decision of logistics parks construction project is an important issue in the process of logistics park planning. It needs to synthesize various factors, such as, politics, economy, society and environment, etc. Because there are some grey relationships among these factors, construction of the order of questions can be look on as a grey multi-objective evaluation. This paper brings forward a new priority decision method named hierarchy -gray comprehensive evaluation model to evaluate the building order of the logistics parks. An example is used to elaborate how to use this model; meanwhile, the method is proved more scientific and reliable.