Active Power Losses in Pressure Rings for Contact Shoes of Ore-Thermal Furnace

2014 ◽  
Vol 698 ◽  
pp. 57-60 ◽  
Author(s):  
Viktor Serikov ◽  
David Vlasov ◽  
Ludmila Goreva

Results of electromagnetic problem solution for three-phase electrodes system in ore-thermal furnace for electrodes equivalent electric circuit parameters calculation made by using 3D-models in numerical finite element method program package ANSYS are presented. Contact shoes pressure rings and heat shield of energy feeding unit are taken into account.

Author(s):  
Андрій Андрійович Ставинський ◽  
Олена Андріївна Авдєєва ◽  
Олександр Миколайович Циганов ◽  
Ростислав Андрійович Ставинський ◽  
Олексій Степанович Садовий

2018 ◽  
Vol 10 (12) ◽  
pp. 4742 ◽  
Author(s):  
Roman Sikora ◽  
Przemysław Markiewicz ◽  
Wiesława Pabjańczyk

In accordance with the requirements of PN EN 13201-5 standard for road lighting installation, energy performance indicators should be descripted. In order to calculate energy performance indicators, it is necessary to know the active power of the road lighting system. The above standard does not specify whether active power losses should be taken into account in calculations. The main purpose of the article is to estimate the active power losses in the road lighting installation. The article presents methods for calculating active power losses, taking into account losses in all main elements of the installation. The obtained calculation results show the relationship between active power losses and the power of luminaires, their number and spacing between poles. Calculations of active power losses were made for single-phase and three-phase installations. The active power losses in a three-phase system do not exceed 1.5% and in a single-phase installation they may be greater than 7%. Therefore, in order to obtain exact values of energy performance indicators (and also predict electricity consumption), active power losses should be taken into account in calculations. In addition, a comparative analysis of the effect of luminaires dimming and active power losses on annual CO2 emissions was made. Not taking into account the active power losses in the calculation of the lighting installation’s power, for single-phase installations in particular, understates the calculated value of CO2 emissions by more than 6%.


2017 ◽  
Vol 2017 (3) ◽  
pp. 65-70
Author(s):  
A.F. Zharkin ◽  
◽  
V.A. Novskyi ◽  
N.N. Kaplychnyi ◽  
A.V. Kozlov ◽  
...  

2016 ◽  
Vol 2016 (4) ◽  
pp. 23-25
Author(s):  
A.V. Krasnozhon ◽  
◽  
R.O. Buinyi ◽  
I.V. Pentegov ◽  
◽  
...  

Author(s):  
Souhil Mouassa ◽  
Tarek Bouktir

Purpose In the vast majority of published papers, the optimal reactive power dispatch (ORPD) problem is dealt as a single-objective optimization; however, optimization with a single objective is insufficient to achieve better operation performance of power systems. Multi-objective ORPD (MOORPD) aims to minimize simultaneously either the active power losses and voltage stability index, or the active power losses and the voltage deviation. The purpose of this paper is to propose multi-objective ant lion optimization (MOALO) algorithm to solve multi-objective ORPD problem considering large-scale power system in an effort to achieve a good performance with stable and secure operation of electric power systems. Design/methodology/approach A MOALO algorithm is presented and applied to solve the MOORPD problem. Fuzzy set theory was implemented to identify the best compromise solution from the set of the non-dominated solutions. A comparison with enhanced version of multi-objective particle swarm optimization (MOEPSO) algorithm and original (MOPSO) algorithm confirms the solutions. An in-depth analysis on the findings was conducted and the feasibility of solutions were fully verified and discussed. Findings Three test systems – the IEEE 30-bus, IEEE 57-bus and large-scale IEEE 300-bus – were used to examine the efficiency of the proposed algorithm. The findings obtained amply confirmed the superiority of the proposed approach over the multi-objective enhanced PSO and basic version of MOPSO. In addition to that, the algorithm is benefitted from good distributions of the non-dominated solutions and also guarantees the feasibility of solutions. Originality/value The proposed algorithm is applied to solve three versions of ORPD problem, active power losses, voltage deviation and voltage stability index, considering large -scale power system IEEE 300 bus.


2021 ◽  
Vol 4 (2) ◽  
pp. 38-43
Author(s):  
Linta Khalil ◽  
Mughees Riaz ◽  
M.Arslan Iqbal Awan ◽  
M.Kamran Liaquat Bhatti ◽  
Rabbia Siddique ◽  
...  

Utilization of new technologies and people lifestyle has greatly affected the world’s electricity market. This demands to design innovative renewable energy systems for efficient use of green energy. In terms of greenhouse gas emissions, electricity from traditional energy supplies has become particularly harmful for the world. To decrease the reliance on fossil fuels, it is need of time to enhance the renewable energy integration in the conventional energy systems. Renewable DGs integration in existing energy systems is not a simple task. To overcome challenges caused by enhanced penetration of renewable energy systems in existing networks, adaptation of smart techniques is essential. DGs Optimal size and selection of their suitable location for integration is crucial for cost effective power delivery to the consumers without compromising the quality of power. This paper presents impartial performance management by optimal network reconfiguration in parallel with renewable DGs and selecting suitable size for reducing active power losses, pollutant gas emissions and costs of annual operation. For analysis of active power losses, Fuzzy and SPEA2 based algorithms are used in MATLAB with IEEE BUS14 acting as load bus. While the cost of power generation and pollutant gases emissions are estimated using HOMER Pro software.


2021 ◽  
Vol 12 (1) ◽  
pp. 388
Author(s):  
Dany H. Huanca ◽  
Luis A. Gallego ◽  
Jesús M. López-Lezama

This paper presents a modeling and solution approach to the static and multistage transmission network expansion planning problem considering series capacitive compensation and active power losses. The transmission network expansion planning is formulated as a mixed integer nonlinear programming problem and solved through a highly efficient genetic algorithm. Furthermore, the Villasana Garver’s constructive heuristic algorithm is implemented to render the configurations of the genetic algorithm feasible. The installation of series capacitive compensation devices is carried out with the aim of modifying the reactance of the original circuit. The linearization of active power losses is done through piecewise linear functions. The proposed model was implemented in C++ language programming. To show the applicability and effectiveness of the proposed methodology several tests are performed on the 6-bus Garver system, the IEEE 24-bus test system, and the South Brazilian 46-bus test system, presenting costs reductions in their multi-stage expansion planning of 7.4%, 4.65% and 1.74%, respectively.


Sign in / Sign up

Export Citation Format

Share Document