A New Construction Process in Core Wall of High-Rise Building: Core Structure Succeeding Method

2013 ◽  
Vol 838-841 ◽  
pp. 241-244
Author(s):  
Hyun Woo Joh ◽  
In Sig Lim ◽  
Yong Hwa Choi ◽  
Yoon Seok Shin ◽  
Gwang Hee Kim

Of the construction processes involved in high-rise building construction, core wall construction is a highly repetitive construction works. Therefore, the effective management of core wall construction works by a project manager can save costs and shorten the duration of high-rise building construction. This study analyzes a case in which a core structure succeeding method (CSSM) is applied to core wall construction. The results of the case study found that the efficiency of CSSM in terms of construction costs and duration is higher than that of the core wall preceding construction method (CWPCM).

2019 ◽  
Vol 11 (19) ◽  
pp. 5211
Author(s):  
Hyunsu Lim ◽  
Taehoon Kim

The systematic collection and management of on-site information in high-rise building construction are important factors in construction management. Recently, wireless sensor network (WSN) technology has been utilized to manage the various tasks involved in high-rise construction efficiently and in a timely manner. However, because of the repeated installation of sensors and repeaters along with the construction progress, the existing WSN technology is ineffective when applied to the temperature management of concrete in structural work. Here, we propose a new data collection method in which a worker uses a smartphone to repeatedly monitor concrete temperature. In field implementation, the proposed system enables concrete temperature management without a transmission gap for monitoring in 60-min intervals with smartphones provided to 20% of the structural workers. Next, a case study was performed on a high-rise building construction site to analyze the effectiveness of the proposed system in terms of cost savings by avoiding schedule delay. The results of the case study show that the proposed system can reduce the additional work costs resulting from delays in concrete curing and save up to $18,907 in labor costs. In addition, this system can reduce the temperature management time of the quality manager and enable more efficient management. It is also expected that this system will contribute to on-site waste management by reducing the number of embedded sensors.


2003 ◽  
Vol 10 (1) ◽  
pp. 43-55 ◽  
Author(s):  
Djoen San Santoso ◽  
Stephen O. Ogunlana ◽  
Takayuki Minato

2012 ◽  
Vol 193-194 ◽  
pp. 1257-1260
Author(s):  
Min Zhang

Various challenges should be considered in the development of an effective model for the planning and control of high-rise building construction. These challenges have been identified as results of the construction process. This paper discusses the engineering planning and management control in high-rise building construction. The methodology should also be able to address the concerns and considerations regularly faced in the industry and thus providing flexible modeling, which can be used by different levels of management


2021 ◽  
Vol 933 (1) ◽  
pp. 012001
Author(s):  
M F Effendi ◽  
I F Ridzqo ◽  
S W Dharmatanna

Abstract High-rise buildings in big cities are crucial for business, economic, educational, residential, and entertainment activities in recent times. The technology discoveries in various fields that support high-rise building construction such as structure, mechanical, electrical, and materials have opened up opportunities for comfortable and environmentally safe architectural work. The first milestone of high-rise building construction knowledge in Indonesia was the completion of the thirteen-floors Sarinah retail building in 1967. Indonesia, especially in Jakarta, then experienced rapid growth of high-rise buildings construction. However, there is limited research on the development of high-rise building designs in Indonesia, especially from an architectural design perspective. It leads to the lack of literature on high-rise building design in Indonesia. By utilizing a publicly accessible database from the Council of Tall Buildings and Urban Habitat and recent literature called Designing Tall Building by Mark Sarkisian, this paper explores the design development of high-rise buildings in Jakarta from time to time in the aspects of architecture, structure and sustainability.


2020 ◽  
Author(s):  
SHWETA SAGAR ◽  
◽  
VIRENDRA KUMAR PAUL ◽  

The most important aspect of any successful structural construction is the formwork system. Formwork itself defines as the temporary structure into which the concrete placed to obtain its desired shape and gains its weight to withstand against various loading conditions. This paper focuses on the two parts 1. Identified different formwork systems using in Indian construction industry for high-rise building construction and 2. Explanations of the decision support system for formwork system so that a decision-maker decides or makes the right choice for the selection of formwork system. This study employed a literature review approach (journal paper, research paper, technical articles & notes, and white paper). The methodology divided into two parts; firstly, the identification of the formwork systems used in the construction industry and secondly, to study a brief about decision support system and for formwork system by which the ease to make a decision support frame for the formwork system selection. This paper reflects the different formwork system typology used in the construction industry for high-rise buildings. The outcome of this paper helps to establish the baseline to develop decision support for the formwork system selection.