How to Improve the Cost Management Level of Enterprises in the New Period

2021 ◽  
2014 ◽  
Vol 584-586 ◽  
pp. 2297-2300 ◽  
Author(s):  
Na Cao

In order to survive in the fierce market competition, construction enterprise must be able to provide high quality and low cost building products. The cost management level of enterprise determines its ability to obtain economic benefits. The responsibility cost management mode that involves everyone participation could enhance management level of enterprises. To eliminate internal information island and information asymmetry, information should communicate between each cost management department. The responsibility cost management model of internal information circulation covers the whole process of project, the cost of project could be reflected timely and accurately, the sufficient information could provide support for every manager decision, then the effectiveness and overall level of responsibility cost management could be enhanced. Thus, with the help of information system, construction enterprise could form a scientific and standardized management model.


2021 ◽  
Vol 276 ◽  
pp. 01034
Author(s):  
Liu Xingwen

With the development and progress of the economy and society, the management level of my country’s construction projects has also been greatly improved, especially in the construction of water conservancy projects, and the cost management in the process has made significant progress; the water conservancy industry is in order to improve the market of enterprises. Competitiveness, to increase the market share of the company, it is necessary to improve the management level of the company in an all-round way, and maximize the economic benefits of the company.In order to improve the efficiency of cost management and operation management in the construction of water conservancy projects, this study conducts a theoretical analysis of the project cost management, taking the reinforcement treatment of the expansion joints of the culverts of the main canal project of the first phase of the water diversion water supply as a research case, and analyzes the expansion joints of the culverts of the project. This paper conducts a comprehensive investigation, proposes a repair plan using chemical bonding with external TPO waterstop and PTN petroleum asphalt polyurethane joint material, and makes a detailed investment estimate for project implementation. The results show that the bonding externally attached TPO waterstop and PTN petroleum asphalt polyurethane joint materials can meet the needs of this design for strengthening and strengthening the waterstop of the expansion joint of the culvert. The total static investment of construction engineering, mechanical and electrical equipment and installation engineering, construction temporary engineering, independent costs and basic reserve costs is 4,585,800 yuan, of which the total cost of underdrain expansion joint treatment is 3,594,600 yuan, which is in line with expectations, indicating that the water conservancy project of this design. The cost management plan is feasible.


2020 ◽  
Vol 4 (2) ◽  
pp. 31
Author(s):  
Zhang Dan ◽  
Deng Suxia ◽  
Li Xiang

Since the arrival of the media era, colleges and universities have undergone many new changes in enrollment, especially in the recruitment publicity work, self-media platform plays an important role. But for now, there are some problems in the application of self-media in college enrollment propaganda, for example, the promotion and management level of the platform needs to be improved, and the low quality of platform push content seriously affects the application effect of self-media. This paper aims at the problems existing in the application of self-media platform in the college enrollment propaganda, and formulates the effective solution strategy of the department, constantly improve the application effect of self-media platform in college enrollment propaganda.


2019 ◽  
Vol 3 (3) ◽  
pp. 208
Author(s):  
He Gao

<p>The sports goods manufacturing industry in Hubei province is in a critical period of transformation and upgrading. The negative growth of the sports goods manufacturing industry in Hubei was caused by the sales expense exceeding the budget, the serious redundancy of employees, the ineffective operation scale and the pure technology investment. In order to boost the confidence of the sports goods manufacturing industry in Hubei province, the management method must be improved, introducing the advanced concept, promoting reform and innovation of sports goods manufacturing industry in Hubei province, to achieve the efficient allocation of industry resources and comprehensive agglomeration, information resources and the advantage of manpower, material resources and financial resources, to ensure that the technical progress and industry management level are matched, thus to promote the long-term development of the sports goods manufacturing industry in Hubei province and sustainable development.</p>


1991 ◽  
Vol 24 (9) ◽  
pp. 31-43 ◽  
Author(s):  
M. D. Burgess

A harsh climate, extended dry periods and relatively expensive water resources underly the potential for effluent reuse in the Northern Territory, Australia. The cost of supplying potable water and the potential offsetting effects of utilising sewage effluent are reviewed. The need to firmly establish the true cost to the community of different supply options is identified. Major cost benefits accrue where reuse will enable deferment of either significant potable source augmentation or sewage treatment works upgrading and where horticultural prospects are good at a reuse site close to the treatment works. An overall strategy plan for increasing the potential of reuse is described. This plan includes firm cost management procedures, marketing activities, appropriate land planning measures and a commitment to research and development.


2011 ◽  
Vol 480-481 ◽  
pp. 1197-1200
Author(s):  
Feng Liu ◽  
Jun Min Wang

In recent years, in order to reduce building energy consumption in China, and vigorously promote the development of ecological construction, the paper studies disadvantages of the cost of traditional project management applications in the ecological construction projects, exploring specific cost management adapt to the ecological construction project.


Sign in / Sign up

Export Citation Format

Share Document