Synchronous Construction Technology of Prestressed Anchor Cable for Deep Foundation Pit Support

2021 ◽  
2013 ◽  
Vol 718-720 ◽  
pp. 1938-1944
Author(s):  
You Sheng Zhao ◽  
Bin Zhou

t is easy to cause the Yangtze River embankment soil of slip even collapse to have a deep foundation pit construction adjacent to the Yangtze River outsideembankment,there are a lot of risk. In this paper, a new combining technique of construction for large caisson is presented. Based on the construction environment, theconstructiontechnology,the smaller earthwork excavation of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology combined with monitoring data for the open caisson excavation control is adopted. It has achieved relatively good results and summarized the advantages of deep high pressure rotary jet grouting pile with undrained caisson combined construction technology in engineering application owing the reference value for engineering applications.


2014 ◽  
Vol 919-921 ◽  
pp. 1411-1415
Author(s):  
Bo Liu ◽  
Pei Sheng Xi

One deep foundation pit in Hefei urban rail transit project is adjacent to the existed expressway subgrade, it's in the unsymmetrical loaded state. The control of foundation pit deformation and the safety of subgrade must be strictly ensured. Based on it, the design scheme of supporting system, the construction processes of earth excavation, top beam, concrete support and steel support was introduced. The horizontal displacement of fender piles and the settlement of subgrade was monitored. The field monitoring results indicate, there exists a great difference between the retaining structure deformation under the action of unsymmetrical load and the deformation under the action of symmetrical load, the horizontal displacement of fender piles on the side of subgrade is bigger than the other side, the upper pile appears to be a "drift" towards the lower-load side; although the absolute value of horizontal displacement of fender piles and settlement of subgrade seems to be a big number, the relative value is small compared to the whole length of fender pile and expressway, meeting relevant standard requirements. The deep foundation pit and expressway kept safe and stable in the all periods of construction, no one accident was occurred during that time. Thus, it can be seen that this construction technology is effective in controlling the deformation during excavation, which can provide a reference for similar projects in design and construction in the future.


2013 ◽  
Vol 368-370 ◽  
pp. 1443-1449
Author(s):  
Jun Yang Wei ◽  
Bao Tian Wang ◽  
Jing Hua Zhang ◽  
Bin Zhou

It is easy to cause Yangtze River embankment soil slip or even collapse to have a deep foundation pit construction adjacent to Yangtze River outside embankment,with lots of risk . A new combined construction technique for large caisson is presented. The construction technology, the earthwork excavation of deep high pressure jet grouting pile combined with undrained open caisson construction technology, with data monitoring for the open caisson excavation control is adopted. This study mainly summarizes the advantages of deep high pressure jet grouting pile combined with undrained caisson combined construction technology engineering application, and describes the process of the combined construction and measures of deviation correction.The new combining construction technique has made a relatively effective protection for the Yangtze River levee and its ecological environment,having great engineering application value to some similar engineering.


2021 ◽  
Vol 2021 ◽  
pp. 1-7
Author(s):  
Zhouqiang Li

Taking a super large deep foundation pit project as an example, the horizontal displacement of crown beam and driveway, surface settlement, axial force of anchor cable, and underground water level in the construction process of the foundation pit are dynamically monitored and analyzed. The excavation deformation rule of the deep foundation pit and the influence of excavation on surrounding buildings are analyzed. The results show that, with the excavation of the foundation pit, the crown beam and driveway of the foundation pit incline towards the direction of the pit and eventually tend to be stable. The variation of axial force of the prestressed anchor cable in the first layer of the foundation pit is basically consistent with the variation of horizontal displacement time history. The variation trend of the groundwater level at each side of the foundation pit is different but tends to be stable in a short time. In the whole monitoring period, the cumulative settlement value of each area of the foundation pit is within the controllable range, but the surface settlement of the north side of the foundation pit and a surrounding building has not reached stability, so it is suggested to extend the monitoring time of settlement in the relevant area.