scholarly journals Territorialização: Perfil epidemiológico da micro área 6 da Unidade Básica de Saúde Mãe Eugênia em Porto Nacional - Tocantins

2021 ◽  
pp. 363-370
Author(s):  
Dayane de Souza Gundim ◽  
Janaína Pereira de Carvalho ◽  
Nerice Luiza das Neves Cavalcante ◽  
Ana Paula Bandeira Matos de Serpa Andrade ◽  
Sara Janai Corado Lopes
Keyword(s):  
Author(s):  
Peter M. Fischer ◽  
Patrik Klingborg ◽  
Fanny Kärfve ◽  
Fredrika Kärfve ◽  
C. Hagberg ◽  
...  

Determination of the complete occupational sequence of the site, including investigation of pre-12th century levels which were thoroughly studied by P. Åström since the 1970s, is the main task of the planned project. During the course of the expedition (NSCE11) in spring 2010 a ground-penetrating radar survey (GPR) was carried out at Dromolaxia Vizatzia/Hala Sultan Tekke in Area 6, leading to the discovery of a large Late Cypriote complex. The compound is bordered to the north by a substantial wall, against which nine rooms (so far) could be exposed. Two occupational phases have been verified but there are indications of a third. The suggested functions of the various structures of the most recent phase are: living, working, storage and administration spaces. The rich find contexts point to the production of textiles and metal objects, and the locally produced pottery is generally of a high quality. There are also many imports, mainly from the Mycenaean sphere of culture. The locally produced vessels from Phase 2 include the “Creature krater” which is a masterpiece of a high artistic standard. Another piece of elevated artistry is the piece of a “Warrior vase”.


SainETIn ◽  
2017 ◽  
Vol 1 (2) ◽  
pp. 17-23
Author(s):  
Hazra Yuvendius
Keyword(s):  

Universitas Lancang Kuning memiliki luas area 57 Ha, area tersebut terdiri  Lokasi Sarana & Prasarana kampus ±35 %, Perkebunan ± 50% dan Danau Buatan ±15 %. Danau buatan yang terletak dilingkungan Fakultas Hukum Universitas Lancang kuning.memiliki luas area ± 6 ha berada di Fakultas Hukum, merupakan  potensi pengembangan energi baru terbarukan salah satunya Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) . Teknologi Mikro Hidro adalah teknologi pembangkit listrik berskala kecil (kurang dari 200 kW) yang digunakan pada sumber daya air untuk mengubah tenaga aliran air (irigasi, danau, sungai atau air terjun) dari tenaga potensial (daya tekan) menjadi tenaga kinetis (kecepatan). Potensi debit air danau Universitas Lancang Kuning periode pengujian tahun 2016 adalah 1.297 m³/detik dan daya mampu yang dihasilkan ± 19 kW. Sehingga rancangan PLTMH yang dapat dirancang adalah menggunakan turbin type Bunki, dengan pertimbangan kondisi pelimpahan air aliran danau hanya memiliki ketinggian 1,5 m.


Lab on a Chip ◽  
2021 ◽  
Author(s):  
Takumi Inui ◽  
Jiyang Mei ◽  
Chikahiro Imashiro ◽  
Yuta Kurashina ◽  
James Friend ◽  
...  

After exposing a plated C2C12 cells culture to PBS, ultrasound from the SAW device transmitted into the cell culture via a coupling water droplet. We can remove cells from an area 6 × 10−3 mm2, equivalent to about 12 cells.


1994 ◽  
Vol 80 (2) ◽  
pp. 191-207
Author(s):  
Michael Whitby
Keyword(s):  

1993 ◽  
Vol 7 (6) ◽  
pp. 906-909
Author(s):  
Geoff J. Germane

1985 ◽  
Vol 58 (2) ◽  
pp. 338-345 ◽  
Author(s):  
D. Tanaka ◽  
S. T. Sakai
Keyword(s):  

Author(s):  
Fitri Maya Puspita ◽  
Yusuf Hartono ◽  
Nadia Zuliaty Syaputri ◽  
Evi Yuliza ◽  
Weni Dwi Pratiwi

<p>In this paper, the Robust Counterpart Open Capacitation Vehicle Rounting Problem (RC-OCVRP) Model has been established to optimize waste transport in districts Sako and districts Sukarami, Palembang City. This model is completed with the aid of LINGO 13.0 by using Branch and Bound solver to get the optimum route. For Sako districs, the routes are as follows: working area 1 is TPS 1-TPS 2-TPS 3-TPA with distance 53.39 km, working area 2 is TPS 1-TPS 2-TPS 3-TPA with distance 48.14 km, working area 3 is TPS 1-TPA with a distance of 22.98 km, and working area 4 is TPS 1-TPS 2-TPS 3-TPS 4-TPA with 45.45 km distance, and obtained the optimum route in Sukarami districts is as follows: working area 1 is TPS 1-TPS 2-TPA 44.39 km, working area 2 is TPS 1-TPS 2-TPS 3-TPA with distance 49.32 km, working area 3 is TPS 1-TPS 3-TPA-TPS 2-TPA with distance 58.57 km, and working area 4 is TPS 1-TPA with a distance of 24.07 km, working area 5 is TPS 1-TPS 3-TPA-TPS 2-TPS 4-TPA with a distance of 77.66 km, and working area 6 is a TPS 1-TPS 2-TPS 3-TPA with a distante 44.94 km.</p>


1986 ◽  
Author(s):  
E. C. Davis ◽  
D. S. Marshall ◽  
R. G. Stansfield ◽  
R. B. Dreier

Sign in / Sign up

Export Citation Format

Share Document