A discussion on the origin of quartz-syenite in Cha Kwo Ling Kaolin Mine Site

2001 ◽  
Author(s):  
King-wai Chan
Keyword(s):  
2020 ◽  
Vol 27 (1-2) ◽  
Author(s):  
Martin Hanáček ◽  
Katarína Adameková

Glaciofluvial and glaciolacustrine sediments were discovered in a small sandpit situated 800 m SE from Vindava (the Polský kopec Site). Sediments fill two channels located in superposition. Three facies associations (FA) were distinguished in this sedimentary section. The base of the lower channel is formed by gravel lag overlain by gravel-sandy sediments of 3-D dunes and a side bar (FA1). The upper channel infill begins also by basal lag and grades to a fining-upwards sequence from sand to silt (FA2). The sequence is formed from the base up by sediments of small 3-D dunes, A-type ripples, B-type ripples, C-type ripples, and horizontally laminated sediments. The sequence reveals a vertical transition from glaciofluvial (sand) to glaciolacustrine (silt) sedimentation. The sedimentary section is terminated by flat glaciofluvial bedforms (FA3) deposited under upper plane bed conditions. These bedforms arose after the restoration of glaciofluvial conditions. The base of the glaciolacustrine sequence is located at an altitude of ~ 275 m as well as the Old Kaolin Mine Site (850 m SW from the Polský kopec Site) where very similar sediments have been already described. The sediments of both localities represent a proglacial outwash plain in front of the retreating ice sheet (FA1 consists of ~ 23% of erratic rocks), where a relatively large lake, or a system of smaller lakes evolved at the same time. 


KURVATEK ◽  
2018 ◽  
Vol 3 (1) ◽  
pp. 21-34
Author(s):  
Untung Wahyudi ◽  
Excelsior T P ◽  
Luthfi Wahyudi

PT. Putera Bara Mitra used open mining system for mining operation, Yet the completion of study on the end wall slope stability that  undertaken by geotechnical PT. Putera Bara Mitra in Northwest Pit and the occured a failure in the low wall on the 1st June 2012 led to the need for analysis and design the overall slope at the mine site. To analyze and design the overall slope, used value of the recommended minimum safety. The value was based on company for single slope SF ≥ 1.2 and SF ≥ 1.3 for overall slope. The calculation used Bichop method with the help of software slide v 5.0. Geometry improvements was done at the low slopes that originally single wall with a 30 m bench height and a slope 70° with SF = 0.781, into 4 levels with SF = 1.305. The analysis explained the factors that affect the stability of the low wall included the mining slope geometry, unfavorable drainase system, material stockpiles and seismicity factors. It was necessary to do prevention efforts to maintain the stability of the slope included the redesign to slope geometry, handling surface and subsurface water in a way to control slopes draining groundwater, vegetation stabilization using and monitoring slope using Total Station with Prism and Crackmeter to determine the movement of cracks visible on the surface. 


Author(s):  
Sara Bjørn Aaen ◽  
Anne Merrild Hansen ◽  
Anastasios Kladis
Keyword(s):  

2015 ◽  
Vol 512-513 ◽  
pp. 261-272 ◽  
Author(s):  
A. O'Neill ◽  
D.H. Phillips ◽  
J. Bowen ◽  
B. Sen Gupta
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document