Development of Enforcement Rate for Occupational Safety and Health Management Expense by Construction Project Types and the Percentage of Completion

Author(s):  
Seung-Ho Choi ◽  
Se-Wook Oh ◽  
Young-Suk Kim
Author(s):  
I Ketut Sutapa ◽  
Ni Kadek Sri Ebtha Yuni ◽  
I Nengah Darma Susila ◽  
I Gede Sastra Wibawa ◽  
I Made Anom Santiana

Building construction projects have a high level of risk of work accidents, especially for workers in the field. Therefore, at the time of implementation of construction work, it is necessary to evaluate the implementation of occupational safety and health management system (SMK3) to provide a sense of security to workers in the field of this research aimed at evaluating SMK3. This research uses qualitative and quantitative methods to know the implementation of SMK3, by taking data by conducting structured interviews conducted on the building construction project Ayana Nort Wing Bali. Analysis conducted a descriptive analysis based on Government Regulation of the Republic of Indonesia No.50, 2012 advanced with 12 criteria containing 166 criteria elements. The result of this study is the application of PP No. 50 of 2012 for the advanced level of 92.89% categorized as satisfactory. In addition, there are 14 that have not been implemented. This the company that the evaluation level of occupational safety and health management system (SMK3) in the building construction project Ayana North Wing Bali is the level of application is very satisfactory for the project.


2021 ◽  
Vol 21 (2) ◽  
pp. 97-100
Author(s):  
I Ketut Sutapa ◽  
◽  
I Nyoman Sutapa ◽  
I Wayan Darya Suparta ◽  
I Nyoman Ramia ◽  
...  

Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.


2021 ◽  
pp. 29-33
Author(s):  
Rafki Imani ◽  
Kharisma Permata Sari ◽  
Yogi Andzel Pratama

Occupational safety and health are the main means of preventing accidents, disability and death as a result of work accidents. K3 aims to prevent, reduce, and even eliminate the risk of work accidents (zero accident). The application of this concept should not be considered as an effort to prevent work accidents and occupational diseases that cost the company a lot of money, but should be considered as a form of long-term investment that will provide abundant benefits in the future. This study aims to determine the implementation of the implementation and the level of success, as well as to determine the factors causing the delay in the implementation of the occupational safety and health management system (SMK3) in the construction project of the Hotel Santika Premiere Padang.The stage of this research is the study of various existing literatures to determine the variables to be used. The next stage is designing research questionnaires and then collecting data by distributing questionnaires directly to the field. The data obtained from the questionnaire will be analyzed for validity and reliability tests using the Statistical Package for Social Science (SPSS) software.The results of this study indicate that the success of the implementation of the occupational safety and health management system (SMK3), which is taken from the average sum of all variables, is 98.5%. So that it can be concluded that the level of achievement of the successful implementation of SMK3 in the construction project of the Hotel Santika Premiere Padang is based on the determination of the success value written in the Minister of Permenaker Number: 05/MEN/1996, eligible for a certificate and a gold flag. This is in accordance with category number 3, namely "where the level of achievement of 85-100% is given a certificate and a gold flag".


2019 ◽  
Vol 3 (3) ◽  
pp. 107-114
Author(s):  
Tri Susilawati ◽  
Dedy Dharmawansyah

Occupational Safety and Health (K3) is a program made by workers and companies as an effort to prevent accidents caused by work and illness by recognizing the potential of accidents and diseases Due to work and anticipatory action in the event of an accident and illness due to work in this research implementation of occupational safety and Health on the PLTMG Sumbawa project is still not as maximal as the problem of personal protective equipment is still not Used as appropriate. The theory used in this research is the implementation theory of the Occupational Safety and Health Management System (SMK3), which relates to occupational safety and Health (K3), work environment and performance. The method used in this research is this type of quantitative study. Data collection method is done by questionnaire, documentation. The method of data analysis used is a simple regression and correlation of product moment. The population is an employee of PT. Wijaya Karya on the PLTMG Sumbawa construction project amounting to 289 people. The sample determination in this study amounted to 158 people using the Cluster Sumpling. The results showed that simultaneously the application of Occupational safety and Health (K3) to the performance of the affected construction project is 3.9% and is seen from the significance value of 0.013 < 0.05 Normal data between the implementation of occupational safety and Health with the performance of the project PLTMG Sumbawa. From the calculation result of T calculated 2,519 compared to T table of 1.975 significance 5% so T count > T table then Ha accepted and Ho rejected. In this research the results of positive value which means the higher the implementation of occupational safety and health, the higher the performance of the construction project. This means that the application of occupational safety and health is very decisive in improving employees ' performance on the PLTMG Sumbawa construction project.


Sign in / Sign up

Export Citation Format

Share Document