scholarly journals Analysis of the Occupational Health and Safety Management System (SMK3) in the Santika Premiere Padang Hotel Development Project

2021 ◽  
pp. 29-33
Author(s):  
Rafki Imani ◽  
Kharisma Permata Sari ◽  
Yogi Andzel Pratama

Occupational safety and health are the main means of preventing accidents, disability and death as a result of work accidents. K3 aims to prevent, reduce, and even eliminate the risk of work accidents (zero accident). The application of this concept should not be considered as an effort to prevent work accidents and occupational diseases that cost the company a lot of money, but should be considered as a form of long-term investment that will provide abundant benefits in the future. This study aims to determine the implementation of the implementation and the level of success, as well as to determine the factors causing the delay in the implementation of the occupational safety and health management system (SMK3) in the construction project of the Hotel Santika Premiere Padang.The stage of this research is the study of various existing literatures to determine the variables to be used. The next stage is designing research questionnaires and then collecting data by distributing questionnaires directly to the field. The data obtained from the questionnaire will be analyzed for validity and reliability tests using the Statistical Package for Social Science (SPSS) software.The results of this study indicate that the success of the implementation of the occupational safety and health management system (SMK3), which is taken from the average sum of all variables, is 98.5%. So that it can be concluded that the level of achievement of the successful implementation of SMK3 in the construction project of the Hotel Santika Premiere Padang is based on the determination of the success value written in the Minister of Permenaker Number: 05/MEN/1996, eligible for a certificate and a gold flag. This is in accordance with category number 3, namely "where the level of achievement of 85-100% is given a certificate and a gold flag".

Author(s):  
I Ketut Sutapa ◽  
Ni Kadek Sri Ebtha Yuni ◽  
I Nengah Darma Susila ◽  
I Gede Sastra Wibawa ◽  
I Made Anom Santiana

Building construction projects have a high level of risk of work accidents, especially for workers in the field. Therefore, at the time of implementation of construction work, it is necessary to evaluate the implementation of occupational safety and health management system (SMK3) to provide a sense of security to workers in the field of this research aimed at evaluating SMK3. This research uses qualitative and quantitative methods to know the implementation of SMK3, by taking data by conducting structured interviews conducted on the building construction project Ayana Nort Wing Bali. Analysis conducted a descriptive analysis based on Government Regulation of the Republic of Indonesia No.50, 2012 advanced with 12 criteria containing 166 criteria elements. The result of this study is the application of PP No. 50 of 2012 for the advanced level of 92.89% categorized as satisfactory. In addition, there are 14 that have not been implemented. This the company that the evaluation level of occupational safety and health management system (SMK3) in the building construction project Ayana North Wing Bali is the level of application is very satisfactory for the project.


2020 ◽  
Vol 3 (3) ◽  
pp. 547
Author(s):  
Steven Steven ◽  
Mega Waty

Indonesia as a developing country in the Asian region is a country that has a lot of development. Occupational safety and health management systems are part of an organization's management system that is used to develop and implement Occupational safety and health policies and manage risks. In this study, researchers will discuss the application of occupational safety and health management systems and supporting facilities for occupational safety and health management systems applied by construction companies to the construction of high rise buildings and housing developments. The method used to determine the successful implementation of the Occupational Safety and Health Management System is to use quantitative methods and Univariate analysis. Later the results of the percentage calculation will be compared with Minister of Public Works Regulation No.9 / 2008 concerning Management and Work Safety Systems. Application of Occupational Safety and Health Management System in high rise buildings is 97% (Good), and for housing is 35% (less). The supporting facilities in the high rise building project are 88% (Good) and 40% (less) for housing.ABSTRAKIndonesia sebagai salah satu negara berkembang di kawasan Asia merupakan negara yang banyak melakukan pembangunan. Sistem manajemen keselamatan dan kesehatan kerja merupakan bagian dari sistem manajemen organisasi yang digunakan untuk mengembangkan dan menerapkan kebijakan keselamatan dan kesehatan kerja dan mengelola risiko. Dalam penelitian ini, peneliti akan membahas penerapan sistem manajemen keselamatan dan kesehatan kerja dan fasilitas pendukung sistem manajemen keselamatan dan kesehatan kerja yang diterapkan perusahaan konstruksi terhadap pembangunan gedung bertingkat dan pembangunan perumahan. Metode yang digunakan untuk mengetahui keberhasilan penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja adalah dengan menggunakan metode kuantitatif dan analisis Univariat. Kemudian hasil perhitungan persentase tersebut akan dibandingkan dengan Peraturan Menteri PU No.9/2008 tentang Sistem Manajemen dan Keselamatan Kerja. Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja pada gedung bertingkat didapat 97% (Baik), dan untuk perumahan didapat 35% (kurang). Fasilitas pendukung yang ada pada proyek gedung bertingkat didapat 88% (Baik) dan untuk perumahan didapat 40% (kurang).


2021 ◽  
Vol 21 (2) ◽  
pp. 97-100
Author(s):  
I Ketut Sutapa ◽  
◽  
I Nyoman Sutapa ◽  
I Wayan Darya Suparta ◽  
I Nyoman Ramia ◽  
...  

Short Cut Bedugul is a short road construction project on the Singaraja-Denpasar route. The short cut development includes the implementation of an occupational health and safety management system (SMK3). The 5-6 point short cut project includes the grade of a large project and places great importance on work safety. Field conditions with high rainfall make the area prone to landslides that can endanger workers, as well as environmental temperatures that reach 20oC which can affect work productivity. The objectives of this study are: To analyze the implementation of occupational safety and health (K3) on the Short Cut project point 5-6 Bedugul. To find out the amount of costs incurred in implementing K3 on the Short Cut point 5-6 Bedugul project. To analyze the percentage of safety and health costs (K3) to the short cut project value point 5-6 Bedugul. The type of research used in this research is descriptive research. and a quantitative descriptive of the construction of the Singaraja City Boundary Road - Mengwi (Short Cut Bedugul point 5–6) the use of K3 such as the use of safety helmets, light vests, masks, gloves, and safety belts is in accordance with the law and is very disciplined and obedient to existing regulations. set. The percentage of K3 costs to the project value refers to the CIRCULAR OF THE MINISTER NO. 66 / SE / M / 2015 Regarding the Cost of Implementing an Occupational Safety and Health Management System (SMK3) Construction in the Public Works Sector is 0.7%.


2021 ◽  
Vol 933 (1) ◽  
pp. 012037
Author(s):  
A U Abidin ◽  
E M Nurmaya ◽  
W Hariyono ◽  
A H Sutomo

Abstract The Occupational Safety and Health Management System (OSHMS) is an important part of the protection of the workforce so that workers remain safe, healthy and safe. Every year in the manufacturing industry in the Sleman area, Yogyakarta Special Region, work accidents result in losses for the company because they have to be taken to the hospital. This study aims to determine the application of OSH to the occurrence of work-related accidents. This type of research is qualitative. The research was carried out in the manufacturing industry of the Hospital Equipment (HE) Division of the Pre-Treatment and Painting Unit. The research instrument uses the criteria for the OSH audit checklist, Government Regulation Number 50 of 2012, which consists of 5 principles, 12 criteria, and 166 items. The range of results from the audit achievement is 0 – 100%. The implementation of OSH in the company is 76.5%, in the category of good implementation, namely for the level of achievement of 60 - 84%. The number of findings was 39 criteria with major non-conformance categories 0 criteria and 39 minor criteria. The implementation of OSHMS can minimize the incidence of work accidents in workplace.


Sign in / Sign up

Export Citation Format

Share Document