scholarly journals Flood Management in China: The Huaihe River Basin as a Case Study

Author(s):  
Qian Mingkai ◽  
Wang Kai
2015 ◽  
Vol 380-381 ◽  
pp. 22-34 ◽  
Author(s):  
Wei Zhang ◽  
Shaoming Pan ◽  
Liguo Cao ◽  
Xun Cai ◽  
Kexin Zhang ◽  
...  

2018 ◽  
Vol 28 (1) ◽  
pp. 213-223 ◽  
Author(s):  
Fang Liu ◽  
Tianling Qin ◽  
Abel Girma ◽  
Hao Wang ◽  
Baisha Weng ◽  
...  

2021 ◽  
Vol 14 (18) ◽  
Author(s):  
Mohammad Ilyas Abro ◽  
Dehua Zhu ◽  
Ehsan Elahi ◽  
Asghar Ali Majidano ◽  
Bhai Khan Solangi

2006 ◽  
Vol 330 (1-2) ◽  
pp. 249-259 ◽  
Author(s):  
Charles A. Lin ◽  
Lei Wen ◽  
Guihua Lu ◽  
Zhiyong Wu ◽  
Jianyun Zhang ◽  
...  

2018 ◽  
Vol 2018 ◽  
pp. 1-15 ◽  
Author(s):  
Chenkai Cai ◽  
Jianqun Wang ◽  
Zhijia Li

Recently, the use of the numerical rainfall forecast has become a common approach to improve the lead time of streamflow forecasts for flood control and reservoir regulation. The control forecasts of five operational global prediction systems from different centers were evaluated against the observed data by a series of area-weighted verification and classification metrics during May to September 2015–2017 in six subcatchments of the Xixian Catchment in the Huaihe River Basin. According to the demand of flood control safety, four different ensemble methods were adopted to reduce the forecast errors of the datasets, especially the errors of missing alarm (MA), which may be detrimental to reservoir regulation and flood control. The results indicate that the raw forecast datasets have large missing alarm errors (MEs) and cannot be directly applied to the extension of flood forecasting lead time. Although the ensemble methods can improve the performance of rainfall forecasts, the missing alarm error is still large, leading to a huge hazard in flood control. To improve the lead time of the flood forecast, as well as avert the risk from rainfall prediction, a new ensemble method was proposed on the basis of support vector regression (SVR). Compared to the other methods, the new method has a better ability in reducing the ME of the forecasts. More specifically, with the use of the new method, the lead time of flood forecasts can be prolonged to at least 3 d without great risk in flood control, which corresponds to the aim of flood prevention and disaster reduction.


Sign in / Sign up

Export Citation Format

Share Document