barrier dam
Recently Published Documents


TOTAL DOCUMENTS

19
(FIVE YEARS 7)

H-INDEX

4
(FIVE YEARS 1)

2021 ◽  
Vol 9 ◽  
Author(s):  
Chang Zhou ◽  
Dong Ai ◽  
Wei Huang ◽  
Huiyuan Xu ◽  
Liwen Ma ◽  
...  

The stability analysis of damaged landslides and unstable debris is important for rescue work and emergency operations. This paper investigates a predisposed geological emergence, inducing the factors and deformation processes of the Zhongbao landslide, which happened on July 25, 2020. The stability of the landslide debris was evaluated by an integrated monitoring system consisting of ground-based radar, unmanned aerial vehicles, airborne Lidar, thermal infrared temperature monitoring, GNSS displacement monitoring, deep displacement monitoring, and rainfall monitoring. The strata and weak layer controlled the landslide failure, and topography defined the boundary of the failed rock mass. A continually intensive rainfall caused the deformation and accelerated failure of the landslide. The shallow and steep deposit (Part I) firstly slid at a high velocity, and then pushed the rear part of the landslide (Part II) to deform, forming numerous cracks, which accelerated the rainfall infiltrating into the rock mass. The moisture content increase could decrease the strength of the shale rock within the bedding planes. Finally, with the rock and soil mass sliding along the weak layer, a barrier dam and a barrier lake were formed. The monitoring and numerical simulation results showed that after the landslide failure, there was still local collapse and deformation occurrences which threatened rescue work and barrier lake excavation, and the stability of the accumulation area gradually decreased as the rainfall increased. Therefore, the barrier dam was not excavated until the accumulation rate gradually stabilized on July 28. Moreover, most of the reactivated deposits still accumulated in the transportation and source areas. Thus, in August, the displacement of the landslide debris gradually accelerated in a stepwise manner, and responded strongly to rainfall, especially in the accumulation area, so that it was inferred that the damaged landslide could slide again and cause a more threatening and severe failure. The analysis results of the study area can provide references for the failure mechanism of a rainfall-induced landslide and the stability evaluation of a damaged landslide.


2021 ◽  
Vol 2083 (4) ◽  
pp. 042046
Author(s):  
Danxuan Xue ◽  
Yan Duan ◽  
Weiwei Meng

Abstract Barrier dam overall stability and dam break influence degree are the two risks. In order to comprehensively and quickly evaluate the risk of barrier dams, the dam height, the capacity of the barrier lake and the material composition of the dam body are selected as the stability evaluation indexes; the dam failure degree and the risk population and the potential economic loss are taken as the evaluation indexes. Based on the fuzzy hierarchy theory, this comprehensive and rapid risk assessment system of barrier dam is obtained, which is clear, intuitive and rapid, combining qualitative indexes and quantitative indexes.


2021 ◽  
Author(s):  
Wei Huang ◽  
Chang Zhou ◽  
Hong Xu ◽  
Lichuan Chen ◽  
Yunping Liao ◽  
...  

Abstract The stability evaluation of the damaged landslide is important for rescue work and emergency operation. This paper investigated a predisposing geological emergence, inducing the factors and deformation processes of the Zhongbao landslide, which happened on 25 July 2020. The stability of the damaged landslide was evaluated by an integrated monitoring system consisting of ground-based radar, unmanned aerial vehicles, airborne Lidar, thermal infrared temperature monitoring, GNSS displacement monitoring, deep displacement monitoring and rainfall monitoring. The strata and weak layer controlled the landslide failure, and topography defined the boundary of the failed rock mass. A continually intensive rainfall caused the deformation and accelerated failure of the landslide. The shallow and steep deposit (Part I) firstly slid at a high velocity, and then pushed the rear part of the landslide (Part II) to deform, forming numerous cracks, and the rainfall infiltrated into the rock mass. Finally, the rock and soil mass sliding along the weak layer, a barrier dam and a barrier lake were formed. The monitoring results showed that after the landslide failure, there were still local collapse and deformation occurrence which threatened rescue work and barrier lake excavation. Therefore, the barrier dam wasn’t excavated until the accumulation rate gradually stabilized on July 28. Moreover, most of the reactivated deposits still accumulated in the transportation and source areas. Thus, in August, the displacement of the damaged landslide gradually accelerated in a stepwise manner, and responded strongly to rainfall, especially in the accumulation area, so that it was inferred that the damaged landslide could slide again and caused a more threatening and severe failure. The analysis results of the study area can provide references for the failure mechanism of a rainfall-induced landslide and the stability evaluation of a damaged landslide.


Water ◽  
2021 ◽  
Vol 13 (5) ◽  
pp. 639
Author(s):  
Heyi Yang ◽  
Guan Chen ◽  
Yan Chong ◽  
Jiacheng Jin ◽  
Wei Shi

In recent years, the intensified influences of global climate change and human activities have increased the frequency of large-scale debris flow disasters. As a result, main river channels often become blocked, thus forming a disaster chain of rivers dammed by debris flow followed by outburst flooding. In order to quickly and easily reveal the dynamic process of a debris flow dam breach, and quantitatively predict the outburst flood hazard, this study takes the Zhouqu “8.8” debris flow barrier dam in Western China as an example. Based on a stability assessment, China Institute of Water Resources and Hydropower Research’s Dam Breach Slope (DBS-IWHR), China Institute of Water Resources and Hydropower Research’s Dam Breach (DB-IWHR), and Hydrologic Engineering Center’s River Analysis System (HEC-RAS) were integrated to simulate the development of dam breach, breach flood, and outburst flood evolution, respectively, under different scenarios. The simulated peak discharge flow of the actual spillway was 317.15 m3/s, which was consistent with the actual discharge of 316 m3/s. The results under different scenarios showed that, with the increased inflow of the barrier lake, the erosion rate of the dam increased, the peak discharge of the dam break flood increased, the peak arrival time shortened, and the downstream flooding area increased. These findings could provide scientific support for risk management and emergency decision-making with respect to barrier dam failure.


2019 ◽  
Vol 16 (3) ◽  
pp. 630-640 ◽  
Author(s):  
Tian-long Zhao ◽  
Sheng-shui Chen ◽  
Chang-jing Fu ◽  
Qi-ming Zhong

2019 ◽  
Vol 23 (4) ◽  
pp. 1548-1559 ◽  
Author(s):  
Tianlong Zhao ◽  
Shengshui Chen ◽  
Changjing Fu ◽  
Qiming Zhong

2018 ◽  
Vol 48 (9) ◽  
pp. 959-968 ◽  
Author(s):  
QiMing ZHONG ◽  
ShengShui CHEN ◽  
Zhao DENG

2016 ◽  
pp. 1-9
Author(s):  
Jelena Majstorovic ◽  
Rade Tokalic ◽  
Suzana Lutovac ◽  
Snezana Savkovic

Sign in / Sign up

Export Citation Format

Share Document