An Optimal Design of Groundwater-Environment Remediation Scheme in Chengdu Plain, China: A Case Study of Huaikou Landfill

Author(s):  
Adam Khalifa Mohamed ◽  
Liu Dan ◽  
Song Kai ◽  
Abubakr Hassan ◽  
Basheer A. Elubid ◽  
...  
2013 ◽  
Author(s):  
Aaron Bodoh-Creed ◽  
JJrn Boehnke ◽  
Brent Richard Hickman
Keyword(s):  

2011 ◽  
Vol 356-360 ◽  
pp. 2329-2332
Author(s):  
Shu Qin Gao ◽  
Yu Ming Feng

Water source heat pump system(WSHPS) is a new energy saving and environmentally air conditioning system, its degree of influence to groundwater related to the feasibility of construction of WSHPS and development & protection of regional groundwater. After introducing WSHPS, this paper analyzed the influence of WSHPS to groundwater, brought up the protection method to reduce influence. At last, a case study of new campus of Taiyuan university was carried out. The results showed that running of WSHPS won’t bring up disadvantage to groundwater environment.


Author(s):  
Xintong Li ◽  
Ruifeng Liang ◽  
Yong Li ◽  
Yaodan Zhang ◽  
Yuanming Wang ◽  
...  

2022 ◽  
Vol 308 ◽  
pp. 118370
Author(s):  
Ellen Nordgård-Hansen ◽  
Nand Kishor ◽  
Kirsti Midttømme ◽  
Vetle Kjær Risinggård ◽  
Jan Kocbach

2015 ◽  
Vol 2015 ◽  
pp. 1-14 ◽  
Author(s):  
Jian Liu ◽  
Dan Liu ◽  
Kai Song

Problems related to water inflow during tunnel construction are challenging to designers, workers, and management departments, as they can threaten tunneling project from safety, time, and economic aspects. Identifying the impacts on groundwater environment resulting from tunnel drainage and making a correct assessment before tunnel construction is essential to better understand troubles that would be encountered during tunnel excavation and helpful to adopt appropriate countermeasures to minimize the influences. This study presents an indicator system and quantifies each indicator of Tongluoshan tunnel, which is located in southwest China with a length of 5.2 km and mainly passes through carbonate rocks and sandstones, based on field investigation and related technological reports. Then, an evaluation is made using fuzzy comprehensive assessment method, with a result showing that it had influenced the local groundwater environment at a moderate degree. Information fed back from environmental investigation and hydrologic monitoring carried out during the main construction period proves the evaluation, as the flow of some springs and streams located beside the tunnel route was found experiencing an apparent decline.


Sign in / Sign up

Export Citation Format

Share Document