Construction Programme Failure and the Impact on Waste, Resource Efficiency, and Natural Capital in Construction Project Environments

Author(s):  
Neil Pickavance ◽  
Andrew Ross ◽  
Damian Fearon
2021 ◽  
Vol 13 (8) ◽  
pp. 4513
Author(s):  
Summaira Malik ◽  
Muhammad Taqi ◽  
José Moleiro Martins ◽  
Mário Nuno Mata ◽  
João Manuel Pereira ◽  
...  

The success of a construction project is a widely discussed topic, even today, and there exists a difference of opinion. The impact of communication and conflict on project success is an important, but least addressed, issue in literature, especially in the case of underdeveloped countries. Miscommunication and conflict not only hinder the success of a project but also may lead to conflicts. The focus of this paper was to examine the impact of communication on project success with the mediating role of conflict. By using SPSS, demographics, descriptive statistics and correlation were determined. Smart PLS version 3.0 was used for confirmatory factor analysis (CFA), internal accuracy and validity estimates, hypothesis checking and mediation testing. The results showed that formal communication has a negative impact on the success of a construction project, resulting in conflicts among project team members, whereas informal communication and communication willingness have a positive impact on project success because people tend to know each other, and trust is developed. Task, process and relationship conflicts were used as mediating variables. It was found that task conflict effects the relations positively because project team members suggest different ways to do a certain task, and, hence, project success is achieved. On the contrary, process conflict and relationship conflict have a negative impact on communication and project success. Both of these conflicts lead to miscommunication, and project success is compromised. Hence, it is the responsibility of the project manager to enhance communication among project team members and to reduce the detrimental effects of process and relationship conflict on project success.


2018 ◽  
Vol 49 ◽  
pp. 02020
Author(s):  
Hery Suliantoro ◽  
Nurul Fitriani ◽  
Bagus Hario Setiadji

Risk is a condition caused by uncertainty. Risks will occur on any construction project, including bridge construction projects. Efforts that can be taken to minimize the impact of these risks are to engage in risk management activities. This research was conducted on bridge construction work on toll road procurement project in Pejagan-Pemalang, Pemalang-Batang and Salatiga-Kertasura. The purpose of this research is to analyze the risk of bridge development project in toll road project using Risk Breakdown Structure (RBS) method and then the result as database in discussing risk response strategy. The bridge construction project has 36 risks that are divided into six groups: materials and equipment, design, human resources, finance, management, nature and environmental conditions. Bad weather risks are the higest risk and seasonal risk causing temporary work stoppages. This risk-response strategy is avoidance. Short-term avoidance response strategy is to add shift workers, install tents and add additives in the acceleration of the process of maturation of concrete. The long-term avoidance response strategy is to evaluate and rearrange the work schedule by considering the weather forecast report.


2016 ◽  
Vol 16 (3) ◽  
pp. 307-322 ◽  
Author(s):  
Hossein Karimi ◽  
Timothy R.B. Taylor ◽  
Paul M. Goodrum ◽  
Cidambi Srinivasan

Purpose This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications The projects used to construct the database are heavily weighted towards industrial construction. Practical implications There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.


2015 ◽  
Vol 752-753 ◽  
pp. 758-762 ◽  
Author(s):  
Rak Hyun Kim ◽  
Sung Ho Tae ◽  
Chang U Chae ◽  
Ji Hoon Kim

The purpose of this study was to develop an environmental database for construction finish materials organized by building element as part of an effort to develop an environmental effect assessment program for buildings. To this end, a classification system has been developed for building elements that satisfies the demands from construction project stakeholders to acquire environmental information. Furthermore, among the construction materials, an environmental database of the finish materials has been developed for each building element based on reference substances and the impact indexes of six environmental effect categories of the national LCI DB.


2012 ◽  
Vol 226-228 ◽  
pp. 2253-2257
Author(s):  
Ren Hui Liu ◽  
Bo Yu

It is a nonlinear complex system for project emergency response system, that is a continuous process for the evolution of emergency construction project development process. The nonlinear differential equations that can describe the sudden emergency construction project the evolution of mathematical models. Emergency system by Logistic model was modified, taking into account the development of emergency systems will certainly be outside the system during the impact, combined with the project incidents of law principles of the role of Heinrich proposed TS-based emergency response system evolution equation Model, demonstrated the system at different stages of the emergency rules and features. For the emergency system in which the different stages of development, the corresponding measures to improve emergency response capabilities.


2012 ◽  
Vol 174-177 ◽  
pp. 3360-3363 ◽  
Author(s):  
Zhi Lu Zhen

Based on analyzing the complexity of construction projects, we established a collaborative management framework for complex construction project and presented the main content of collaborative management. The main content includes three parts, the first part is the collaborative management for system itself, the second part is to reduce the system complexity in order to reduce the difficulty of management and the last part is to reduce the complexity caused by the uncontrollable external environment. We can use the method of risk pre-assessment and take risk prevention measures to reduce the impact for collaborative management caused by the dynamic external environment.


2016 ◽  
Vol 78 ◽  
pp. 103-108
Author(s):  
M.B. Dodd ◽  
D.R. Stevens

Land use and management change is a feature of New Zealand farm systems, driven by a range of factors including volatile markets and exchange rates, variable weather and climate patterns, continuous policy evolution and the inherent innovation of New Zealand farmers. Yet the common indicators used to evaluate the impact of change appear to be limited to the link between productivity (of land/labour/capital) and profitability. However, if farm system "owners" seek truly sustainable systems they should consider a wider set of indicators to guide investment. Sustainability is considered in terms of the ability of the pastoral farm system to fulfil its primary purpose in the long-term, i.e. "to derive value from the natural capital of a land and water resource that is sufficient to support the objectives of the resource owner" and fulfil secondary objectives considered important by other stakeholders (e.g., product and environmental quality). The objective of this study was to develop an integrated assessment framework for sustainability indicators that was useful for guiding change decisions at the farm system scale, a key determinant of regional economic, environmental and social outcomes. The approach is based on the fundamental properties of a complex adaptive system: existence, effectiveness, freedom of action, security, adaptability and coexistence, applied to six key system drivers (financial, environmental, social, cultural, technological and regulatory). This framework could support decision-making in terms of the investment of human, natural and financial capital at the farm system scale and contribute to larger scale information imperatives (e.g., value chains, catchments). Keywords: integrated assessment, pastoral farm systems, sustainability, systems properties


2021 ◽  
Vol 236 ◽  
pp. 03002
Author(s):  
Yingying Wu

The Environmental Impact Assessment system, referred to as the EIA system, is to evaluate the impact of the implementation of the plan or the construction and operation of the project on the environment, combine the surrounding environmental quality status, propose ecological or environmental protection measures,then evaluate the effectiveness of the measures, and draw a conclusion on the feasibility of the project(planning) in terms of environmental protection.This article summarizes the role and progress in environmental protection in the two aspects of planning and construction projects in recent years.Comprehensively selected cases found that both planning or construction project environmental assessment have played an important role in predicting the possible impact of planning or construction projects on the environment and ecology, and proposed feasible and effective environmental protection measures.After the planning or construction project adopts the conclusions and suggestions, as long as the "Three Simultaneous" regulations are followed, the impact of the planning or construction project on the environment or ecology can be prevented or effectively reduced. When it is necessary to conduct postevaluation of environmental impact, verify the actual conditions of the construction project, such as emissions and actual production processes.


Author(s):  
John Adekunle Adesina ◽  
Zhu Jiangang ◽  
Tang Xiaolan

According to this study, approximately half of Africa's forests are utilized primarily or partially for the production of wood and non-wood commodities. Aims to evaluate Africa's forestry and forest products, namely Wood Forest Products (WFPs) and Non-wood Forest Products (NWFPs) in the sixteen (16) West African countries. While adhering to the following guidelines: wood extraction and preparation, analyzing wood primarily used as an energy source in Africa, identifying non-wood forest products in Africa, the state of export, trade, and customs procedures in West Africa, and examining the role of forests and forest stakeholders in Africa's low-carbon economy transition. An exploratory literature review of selected wood forest products and non-wood forest products (plants and animals) in West Africa identifying the country, the natural land area with the natural habitat issues of the forest, the species most harvested and traded in the West African sub-region. The study reemphasized some government legislation, policies, and market trade failures and limitations while also stating that trees may help in the low-carbon revolution through interventions aimed at maintaining, improving, and restoring natural capital have demonstrated that high environmental requirements of sustainable forest management (SFM) may be met in both natural and planted forests. The study identified a systematic assessment of the most common forest products (wood and non-wood forest products) considering the available data on the national forest reserves of the selected countries in West Africa. The study also revealed the need for biodiversity conservation of the available forest reserves to help mitigate the impact of global warming targeting the United Nation’s Sustainable Development Goal 13- Climate Action. Which is focused on integrating climate change mitigation, adaptation, impact reduction, and early warning signs into the national policies, improving forest planning and management education, awareness-raising, and institutional capacity within the sub-region.


2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.