Analyses on drainage capacity and sliding resistance of large diameter vertical wells for deep-seated landslide stabilization

Author(s):  
Ba Thao Vu ◽  
Van Minh Pham ◽  
Quoc Dung Nguyen ◽  
Huy Vuong Nguyen ◽  
Thi Thanh Huong Ngo
2012 ◽  
Vol 490-495 ◽  
pp. 2205-2209
Author(s):  
Jun Feng Liu ◽  
Hai Min Guo

There are big difference of fluid flow patterns between horizontal wells and vertical wells, so the current interpretation models of production logging multiphase flow in vertical wells are not suitable for data interpretation in highly deviated and horizontal wells. In this paper, firstly, the two-phase flow (oil-water and gas-water) simulation experiments have been carried out in large-diameter (0.124 meter internal diameter) uphill, horizontal and downhill Plexiglas pipe with practical production logging tools. Secondly, based on the conclusions of fluid flow mechanism from experimental data analysis, and considering the affecting factors (i.e. Logging tool and well deviation ), we have obtained slip velocity model after well deviation correction in highly deviated and horizontal wells, which have been corrected by the mature interpretation models. Finally, this proposed method has been proved correct and feasible through the experimental data validation.


2021 ◽  
Vol 37 (1) ◽  
Author(s):  
Victor Jiménez Arguelles ◽  
◽  
Luis Rocha Chiu ◽  
Aurora Poó Rubio ◽  
◽  
...  

This article describes the main stages involved in the construction of the vertical shafts (large-diameter vertical wells), which are necessary for the subsequent construction of the tunnel´s sections. The different risk situations existing during the construction of the Eastern Drainage Tunnel in the valley of Mexico City (in Spanish, "Tunel Emisor Oriente") are analyzed. In order for this 52 km-long and 7.5 m-wide tunnel to carry part of the city’s sewage, 25 shafts must first be built, ranging from 55 to 150 meters deep. The magnitude of such a project implies working in different geographical areas and varied geological strata involving the presence of groundwater, which increases the risks due to possible landslides or flooding during excavation. As digging will occur in different types of soil, varying procedures must be used depending on soil type. Likewise, due to the magnitude of this kind of project, detailed scheduling and planning are required as simultaneous works on different fronts are necessary to meet deadlines. The study mentions that, while projects like these involve high risks for workers, analysis of activities and situations are conducted precisely to demonstrate that such risks can be considerably reduced.


Author(s):  
A. Yamada ◽  
A. Shibano ◽  
K. Harasawa ◽  
T. Kobayashi ◽  
H. Fukuda ◽  
...  

A newly developed digital scanning electron microscope, the JSM-6300, has the following features: Equipped with a narrower conical objective lens (OL), it allows high resolution images to be obtained easily at a short working distance (WD) and a large specimen tilt angle. In addition, it is provided with automatic functions and digital image processing functions for ease of operation.Conical C-F lens: The newly developed conical C-F objective lens, having low aberration characteristics over a wide WD range, allows a large-diameter (3-inch) specimen to be tilted up to 60° at short WD, and provides images with low magnifications starting at 10*. On the bottom of the lens, a p n junction type detector is provided to detect backscattered electrons (BE) from the specimen. As the narrower conical 0L increases the secondary electron (SE) detector's field intensity on the specimen surface, high SE image quality is obtained.


2020 ◽  
Vol 7 (2) ◽  
pp. 21-28
Author(s):  
SALI RADZHAPOV ◽  
◽  
RUSTAM RAKHIMOV ◽  
BEGJAN RADZHAPOV ◽  
MARS ZUFAROV

The article describes the developed radiometer for Express measurement of alpha radiation of radioactive elements based on a large-diameter silicon detector. The main element of the PPD detector is made using computer mathematical modeling of all stages of the technological process of manufacturing detectors, taking into account at each stage the degree of influence of the properties of the initial silicon on the electrophysical and radiometric characteristics of the detector. Detectors are manufactured for certain types of devices. The developed radiometer is designed to measure alpha radiation of natural isotopes (238U, 234U, 232Th, 226Ra, 222Rn, 218Po, 214Bi, etc.) in various environments. It also shows the principle of operation of the device, provides a block diagram of the measuring complex, describes the electronic components of the radiometer, as well as the block diagram. Signal transformations (spectrum transfer, filtering, accumulation) are implemented programmatically on the basis of a digital processing module. The device can detect the presence of specific elements in various environments, as well as protect people from the harmful effects of adverse radiation and can be used both in the field and stationary.


2012 ◽  
Vol 57 (2) ◽  
pp. 363-373
Author(s):  
Jan Macuda

Abstract In Poland all lignite mines are dewatered with the use of large-diameter wells. Drilling of such wells is inefficient owing to the presence of loose Quaternary and Tertiary material and considerable dewatering of rock mass within the open pit area. Difficult geological conditions significantly elongate the time in which large-diameter dewatering wells are drilled, and various drilling complications and break-downs related to the caving may occur. Obtaining higher drilling rates in large-diameter wells can be achieved only when new cutter bits designs are worked out and rock drillability tests performed for optimum mechanical parameters of drilling technology. Those tests were performed for a bit ø 1.16 m in separated macroscopically homogeneous layers of similar drillability. Depending on the designed thickness of the drilled layer, there were determined measurement sections from 0.2 to 1.0 m long, and each of the sections was drilled at constant rotary speed and weight on bit values. Prior to drillability tests, accounting for the technical characteristic of the rig and strength of the string and the cutter bit, there were established limitations for mechanical parameters of drilling technology: P ∈ (Pmin; Pmax) n ∈ (nmin; nmax) where: Pmin; Pmax - lowest and highest values of weight on bit, nmin; nmax - lowest and highest values of rotary speed of bit, For finding the dependence of the rate of penetration on weight on bit and rotary speed of bit various regression models have been analyzed. The most satisfactory results were obtained for the exponential model illustrating the influence of weight on bit and rotary speed of bit on drilling rate. The regression coefficients and statistical parameters prove the good fit of the model to measurement data, presented in tables 4-6. The average drilling rate for a cutter bit with profiled wings has been described with the form: Vśr= Z ·Pa· nb where: Vśr- average drilling rate, Z - drillability coefficient, P - weight on bit, n - rotary speed of bit, a - coefficient of influence of weight on bit on drilling rate, b - coefficient of influence of rotary speed of bit on drilling rate. Industrial tests were performed for assessing the efficiency of drilling of large-diameter wells with a cutter bit having profiled wings ø 1.16 m according to elaborated model of average rate of drilling. The obtained values of average rate of drilling during industrial tests ranged from 8.33×10-4 to 1.94×10-3 m/s and were higher than the ones obtained so far, i.e. from 181.21 to 262.11%.


Sign in / Sign up

Export Citation Format

Share Document