Zero-waste recycling method for textile dyeing sludge by magnetizing roasting–magnetic separation process and ceramic filter preparation

2020 ◽  
Vol 74 (12) ◽  
pp. 4389-4399
Author(s):  
Qiang Zhao ◽  
Jinchao Wei
2013 ◽  
Vol 48 (9) ◽  
pp. 1426-1432 ◽  
Author(s):  
Yongcheng Zhou ◽  
Xiong Tong ◽  
Shaoxian Song ◽  
Zhengbin Deng ◽  
Xiao Wang ◽  
...  

2012 ◽  
Vol 730-732 ◽  
pp. 630-635
Author(s):  
D. Algarvio ◽  
Maria Margarida Rolim Augusto Lima ◽  
M.L. Cunha

The construction and demolition wastes (C&DW) frequently are abandoned in private properties, roads, and landfills or collected by non-licensed companies. In Portugal they are few recycling plants operating with this residue, and this work makes the bridge between the mechanical recycling process developed on semi-industrial scale, and the recycling products characterization process developed on laboratorial scale. The main goal of the present work is the quality improvement of the recycled aggregates produced by a construction and demolition waste recycling pilot plant with 50 ton/h located in Montemor-o-Novo. Process operations are the hammer mill comminution, magnetic separation and sieving (bar sieves: 0-4mm, 4-8mm and 8-12mm; and square sieves: 12-22mm, 22-31mm and above 31mm). In order to improve the magnetic separation process, several tests with different distances between the magnet and the conveyor belt were made (21-31cm). On the other hand, to improve the quality of the produced aggregates, the bar screen size fractions were analyzed, according to the Portuguese Standard (NP EN 933-1 2000). The most efficient distances for the magnetic separation process were identified as between 21 and 27cm, with efficiency between 85% and 90% respectively. According to the histograms, the more frequent red aggregate from 0-4mm size fraction are +0.425-0.850; +0.850-1.7 and +1.7-3.35. From the 4-8mm red aggregates, the more frequent size fractions are +4.75-6.7 and +6.7-9.95. Finally, from the 8-12mm red aggregates, the more frequent new size fractions are +6.7-9.50 and +9.50-13.20. Sieving results obtained from cumulative curves for red aggregate showed an decrease in the mass % amount for the size fractions: 0-4mm: 97%, 4-8mm:76% and 8-12mm: 56%. The results from cumulative curves for grey aggregate showed a light decreased in the amount mass % for the size fractions: 0-4mm: 90%, 4-8mm:56% and 8-12mm: 60%.


2021 ◽  
Vol 295 ◽  
pp. 126358
Author(s):  
Binxian Gu ◽  
Xinyi Tang ◽  
Lingxuan Liu ◽  
Yuanyuan Li ◽  
Takeshi Fujiwara ◽  
...  

2021 ◽  
Vol 19 (1) ◽  
pp. 128-137
Author(s):  
Bing Luo ◽  
Tongjiang Peng ◽  
Hongjuan Sun

Abstract To comprehensively reuse copper ore tailings, the recovery of γ-Fe2O3 from magnetic roasted slag after sulfur release from copper ore tailings followed by magnetic separation is performed. In this work, after analysis of chemical composition and mineralogical phase composition, the effects of parameters in both magnetization roasting and magnetic separation process with respect to roasting temperature, residence time, airflow, particle size distribution, magnetic field intensity, and the ratio of sodium dodecyl sulfonate to roasted slag were investigated. Under optimum parameters, a great number of γ-Fe2O3 is recycled with a grade of 66.86% and a yield rate of 67.21%. Meanwhile, the microstructure, phase transformation and magnetic property of copper ore tailings, roasted slag, and magnetic concentrate are carried out.


2020 ◽  
Author(s):  
R. A. Sunmati ◽  
S. V. Tarini ◽  
S. Pooja ◽  
V. Swetha ◽  
S. Thaarini ◽  
...  

2020 ◽  
Vol 250 ◽  
pp. 119462 ◽  
Author(s):  
Deqing Zhu ◽  
Jiwei Xu ◽  
Zhengqi Guo ◽  
Jian Pan ◽  
Siwei Li ◽  
...  

2019 ◽  
pp. 149-169 ◽  
Author(s):  
Giacomo Copani ◽  
Marcello Colledani ◽  
Alessandro Brusaferri ◽  
Antonio Pievatolo ◽  
Eugenio Amendola ◽  
...  

2013 ◽  
Vol 826 ◽  
pp. 29-33
Author(s):  
Zhong Hang Cheng ◽  
Ke Xu Yu ◽  
Tong Lin Zhao ◽  
Xiao Li Wang

In this paper, the mineral properties of the lean magnetite in RongTian mine corporation was studied, during which the analysis of the mineral properties, prelimenary separation on the lump mine, two-section grinding, one section fine screening and three-section low intensity magnetic separation process were carried out. The results showed that if the suitable mineral processing flowsheet is adapted, we can achieved such index:concentrate grade of 63.65%, Fe recovery of 47.12% based on the ore grade of 10.05%.. According to the experimental result analysis, most of the iron minerals could be used to support the steel production of LingGang Group.Single magnetic process proved to be an suitable and promising process to conduct the fine particles of lean magnitite.


Sign in / Sign up

Export Citation Format

Share Document