Principle of using borehole electrode current method to monitor the overburden stratum failure after coal seam mining and its application

2020 ◽  
Vol 179 ◽  
pp. 104111
Author(s):  
Rongxin Wu ◽  
Ze'’an Hu ◽  
Xiongwu Hu
2021 ◽  
Vol 14 (4) ◽  
Author(s):  
Zhao Chunhu ◽  
Jin Dewu ◽  
Wang Qiangmin ◽  
Wang Hao ◽  
Li Zhixue ◽  
...  

Author(s):  
Hongwei Wang ◽  
Ruiming Shi ◽  
Jiaqi Song ◽  
Zheng Tian ◽  
Daixin Deng ◽  
...  

2013 ◽  
Vol 295-298 ◽  
pp. 2980-2984
Author(s):  
Xiang Qian Wang ◽  
Da Fa Yin ◽  
Zhao Ning Gao ◽  
Qi Feng Zhao

Based on the geological conditions of 6# coal seam and 8# coal seam in Xieqiao Coal Mine, to determine reasonable entry layout of lower seam in multi-seam mining, alternate internal entry layout, alternate exterior entry layout and overlapping entry layout were put forward and simulated by FLAC3D. Then stress distribution and displacement characteristics of surrounding rock were analyzed in the three ways of entry layout, leading to the conclusion that alternate internal entry layout is a better choice for multi-seam mining, for which makes the entry located in stress reduce zone and reduces the influence of abutment pressure of upper coal seam mining to a certain extent,. And the mining practice of Xieqiao Coal Mine tested the results, which will offer a beneficial reference for entry layout with similar geological conditions in multi-seam mining.


Sign in / Sign up

Export Citation Format

Share Document