Multi-level methods to quantify risk assessment, source apportionment and identifying key risk areas of soil toxic elements in Ashi River watershed, China

Author(s):  
Xiaomeng Guo ◽  
Li Wang ◽  
Fang Ma ◽  
Yongqiang You ◽  
Chang Ju
Author(s):  
Lian Chen ◽  
Shenglu Zhou ◽  
Qiong Yang ◽  
Qingrong Li ◽  
Dongxu Xing ◽  
...  

This study detailed a complete research from Lead (Pb) content level to ecological and health risk to direct- and primary-sources apportionment arising from wheat and rice grains, in the Lihe River Watershed of the Taihu region, East China. Ecological and health risk assessment were based on the pollution index and US Environmental Protection Agency (EPA) health risk assessment model. A three-stage quantitative analysis program based on Pb isotope analysis to determine the relative contributions of primary sources involving (1) direct-source apportionment in grains with a two-end-member model, (2) apportionment of soil and dustfall sources using the IsoSource model, and (3) the integration of results of (1) and (2) was notedly first proposed. The results indicated that mean contents of Pb in wheat and rice grains were 0.54 and 0.45 mg/kg and both the bio-concentration factors (BCF) were <<1; the ecological risk pollution indices were 1.35 for wheat grains and 1.11 for rice grains; hazard quotient (HQ) values for adult and child indicating health risks through ingestion of grains were all <1; Coal-fired industrial sources account for up to 60% of Pb in the grains. This study provides insights into the management of grain Pb pollution and a new method for its source apportionment.


2012 ◽  
pp. 390-418
Author(s):  
Dionysis Kefallinos ◽  
Maria A. Lambrou ◽  
Efstathios D. Sykas

In this chapter, the authors propose a model for a risk assessment tool directed towards and tailored specifically for e-government projects. The authors’ goal is to cover the particular threats pertinent to the e-government project context and provide an interface between the broader philosophy of IT governance frameworks and the technical risk assessment methodologies, thus aiding in the successful and secure implementation and operation of e-government infrastructures. The model incorporates a wide range of applicable risk areas, grouped into eleven levels, as well as seven accompanying dimensions, assembled into a checklist-like matrix, along with an application algorithm and associated indices, which an evaluator can use to calculate risk for one or for multiple interacting projects.


Author(s):  
Dionysis Kefallinos ◽  
Maria A. Lambrou ◽  
Efstathios D. Sykas

In this chapter, the authors propose a model for a risk assessment tool directed towards and tailored specifically for e-government projects. The authors’ goal is to cover the particular threats pertinent to the e-government project context and provide an interface between the broader philosophy of IT governance frameworks and the technical risk assessment methodologies, thus aiding in the successful and secure implementation and operation of e-government infrastructures. The model incorporates a wide range of applicable risk areas, grouped into eleven levels, as well as seven accompanying dimensions, assembled into a checklist-like matrix, along with an application algorithm and associated indices, which an evaluator can use to calculate risk for one or for multiple interacting projects.


2021 ◽  
Vol 13 (2) ◽  
pp. 826
Author(s):  
Meiling Zhou ◽  
Xiuli Feng ◽  
Kaikai Liu ◽  
Chi Zhang ◽  
Lijian Xie ◽  
...  

Influenced by climate change, extreme weather events occur frequently, and bring huge impacts to urban areas, including urban waterlogging. Conducting risk assessments of urban waterlogging is a critical step to diagnose problems, improve infrastructure and achieve sustainable development facing extreme weathers. This study takes Ningbo, a typical coastal city in the Yangtze River Delta, as an example to conduct a risk assessment of urban waterlogging with high-resolution remote sensing images and high-precision digital elevation models to further analyze the spatial distribution characteristics of waterlogging risk. Results indicate that waterlogging risk in the city proper of Ningbo is mainly low risk, accounting for 36.9%. The higher-risk and medium-risk areas have the same proportions, accounting for 18.7%. They are followed by the lower-risk and high-risk areas, accounting for 15.5% and 9.6%, respectively. In terms of space, waterlogging risk in the city proper of Ningbo is high in the south and low in the north. The high-risk area is mainly located to the west of Jiangdong district and the middle of Haishu district. The low-risk area is mainly distributed in the north of Jiangbei district. These results are consistent with the historical situation of waterlogging in Ningbo, which prove the effectiveness of the risk assessment model and provide an important reference for the government to prevent and mitigate waterlogging. The optimized risk assessment model is also of importance for waterlogging risk assessments in coastal cities. Based on this model, the waterlogging risk of coastal cities can be quickly assessed, combining with local characteristics, which will help improve the city’s capability of responding to waterlogging disasters and reduce socio-economic loss.


Sign in / Sign up

Export Citation Format

Share Document