Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China

2021 ◽  
Vol 126 ◽  
pp. 791-799
Author(s):  
Ruibo Hu ◽  
Ke Chen ◽  
Weiya Chen ◽  
Qiankun Wang ◽  
Hanbin Luo
2020 ◽  
Vol 265 ◽  
pp. 121779 ◽  
Author(s):  
Luiz Maurício Furtado Maués ◽  
Brisa do Mar Oliveira do Nascimento ◽  
Weisheng Lu ◽  
Fan Xue

2011 ◽  
Vol 243-249 ◽  
pp. 6292-6295 ◽  
Author(s):  
Rong Yau Huang ◽  
Li Hsu Yeh ◽  
Hao Hsien Chen ◽  
Jyh Dong Lin ◽  
Ping Fu Chen ◽  
...  

This study examines construction waste generation and management in Taiwan. We verify the factors probable affecting the output of construction wastes by using data for the output of declared construction wastes produced from demolition projects in Taiwan in the last year, expert interviews, and research achievements in the past, and find “ on-site separation” is the factor with effects on the output of construction wastes via cross-correlation by algorithms such as K-Means and Decision Tree C5.0. It can be seen that the output (0.092(t/M3) with on-site separation or 0.329(t/M3) without on-site separation is highly correlated with the composition ratio of construction wastes and referred to as a valid conclusion.


Author(s):  
Marcela Spišáková ◽  
Mária Kozlovská ◽  
Jozef Švajlenka

Construction industry creates an environment for people's lives. On the other hand, construction activities have a negative impact on various aspects of the environment. It consumes natural raw materials, significantly contributes to carbon footprint, waste, etc. Appropriate choice of constructional, material, technical, technological and environmental parameters of buildings can partially reduce this negative impacts. By designing, implementing and using wood-based constructions it is possible to reduce the negative impact in the area of construction waste generation. Currently, the construction market offers a large number of construction systems of wooden buildings, which have both strengths and weaknesses. In this paper are identified construction systems of wooden buildings offered on the Slovak construction market. The aim of the paper is a detailed identification of construction waste generation during the realization of particular wooden structures and monitoring of waste generation in production factory (off site) and on construction site (on site) during the construction of wooden buildings. Based on the obtained information, the individual construction systems of wood-based constructions are compared in terms of construction waste generation


2018 ◽  
Vol 4 (11) ◽  
pp. 2539 ◽  
Author(s):  
Suaathi Kaliannan ◽  
Sasitharan Nagapan ◽  
Abd Halid Abdullah ◽  
Samiullah Sohu ◽  
Ashfaque Ahmed Jhatial

Construction sector is one of the main sectors in contributing Gross Domestic Product (GDP) growth rate in every developing country. The rapid growth of this sector directly produces a huge amount of construction waste. Hence, to find out the main root causes of the generation, this paper aimed to determine root causes of the construction waste generation in the construction sector. The research is carried out through triangulation technique (questionnaire survey and practitioner’s validation). This technique is adopted to facilitate cross validation by analysing 38 articles and then the final results have been validated by construction practitioners. A total of 80 root causes were identified from 38 articles and the 5 main root causes determined have scored more than 50% out of the total number of articles. Finally, the result was validated and found out that 87.5% of construction practitioners agree with the findings. The agreed root causes are ‘Constant design changes’, ‘Incorrect storage of materials’, ‘Poor handling of materials’, ‘Effect of weather’ and ‘Mistakes while ordering from suppliers’. Therefore, these initial findings will be able to aid the construction practitioner (contractors, consultants and developers) to be aware of the root causes that is mostly causing construction waste generation.


2010 ◽  
Vol 163-167 ◽  
pp. 4564-4569 ◽  
Author(s):  
Ahmad Firman Masudi ◽  
Che Rosmani Che Hassan ◽  
Noor Zalina Mahmood ◽  
Siti Nazziera Mokhtar ◽  
Nik Meriam Sulaiman

Estimation of construction and demolition (C&D) waste amount is crucial for implementing waste minimization program. Estimation of C&D waste amount generated is a mean in assessing the potential for waste reduction. Thus, a better understanding of C&D waste generation in terms of causes and sources can be achieved. The aim of this paper is to conduct a review on available construction waste quantification methods from previous studies, which have been utilized in certain countries, while attempting to choose the most suitable and applicable method, and to direct future studies for better quantification methods. This review is applicable only for building construction projects and did not include civil/infrastructure, demolition, renovation, and excavation projects. Six quantification methods and/or waste audit tool available from literatures are discussed, which include their limitation and future direction for this study. It is believed that some combination of these quantification methods could make a good impact in accurate numerical estimation of construction waste amount generated in building construction projects. A strong and accurate database as presented by Soliz-Guzman, combined with effective, vital, and resourceful estimation suggested by Jalali’s Global Index (GI), also with the aid of user-friendly software tool like the SMARTAudit could provide an effective and reliable waste quantification.


2012 ◽  
Vol 11 (2) ◽  
Author(s):  
L. Abarca Guerrero ◽  
G.J. Maas ◽  
A.J.D. Lambert

2015 ◽  
Vol 102 ◽  
pp. 58-65 ◽  
Author(s):  
Paola Villoria Sáez ◽  
César Porras-Amores ◽  
Mercedes del Río Merino

Sign in / Sign up

Export Citation Format

Share Document