The solids retention time—a suitable design parameter to evaluate the capacity of wastewater treatment plants to remove micropollutants

2005 ◽  
Vol 39 (1) ◽  
pp. 97-106 ◽  
Author(s):  
M. Clara ◽  
N. Kreuzinger ◽  
B. Strenn ◽  
O. Gans ◽  
H. Kroiss
2012 ◽  
Vol 65 (4) ◽  
pp. 689-696 ◽  
Author(s):  
Taewoo Yi ◽  
William Barr ◽  
W. F. Harper

This research investigated the biological transformation of trimethoprim (TMP). Partial TMP removal was observed in the presence of ammonia and toluene, and increasing the solids retention time from 20 days to 60 days improved TMP removal in both the nitrifying and heterotrophic bioreactors. Two TMP-related metabolites were identified, the first (5-(3,4,5-trimethoxybenzyl) pyrimidine-2,4-diamine, 5-hydroxyl) showing that a hydroxylation reaction took place, and the second (5-(1-carboxyl, 1-methoxy, 5-methoxy 1-,4-pentene) pyrimidine-2,4-diamine, 5-hydroxyl) showing that the trimethoxybenzyl ring was cleaved. This research is the first that we are aware of to report these two TMP-related byproducts. TMP metabolites show that initiating reactions take place where the electron density is highest, and that these initiating reactions shift the electron density of TMP, likely affecting the course of transformation.


Water ◽  
2020 ◽  
Vol 12 (11) ◽  
pp. 3166
Author(s):  
Huihuang H. Ding ◽  
Polina Kotova ◽  
Christopher Shaw ◽  
Youngseck Hong ◽  
Sheng Chang

Anaerobic digestion (AD) has benefits in sludge management, energy recovery, and pathogen reduction. In order to better understand the mechanisms of biological hydrolysis (BH) pretreatment on AD, biochemical methane potential (BMP) and continuous stirred-tank reactor (CSTR) tests were utilized to compare untreated municipal combined sludge with pilot-scale BH pretreated sludge. During the BH process, there was 15%, 30%, and 33% (w/w) volatile solids (VS) reduction after BH at 42 °C (BH42) for 24, 48, and 72 h, respectively; under BH61 (42 °C for 36 h and 61 °C for 6 h), and there was 10% and 30% (w/w) overall VS reduction after 36-h and 42-h hydrolysis, respectively. BMP results showed that BH42-pretreated sludge had 22.6% enhancement of methane yield compared to untreated sludge, and BH61 pretreated sludge had 29.4% enhancement of methane yield. Both temperature and solids’ retention time (SRT) contributed to the enhanced AD performance within 36 h, while temperature played more important roles after 36-h BH pretreatment. CSTR tests confirmed the acceleration of anaerobic digestion by BH pretreatment, and higher enhancement was observed when SRT of anaerobic digestion was shorter than 16 days. Through a literature review of BH-related studies, the possible mechanisms were highlighted for further optimization on the scale-up systems in order to reduce carbon footprint and operating expenditure for wastewater treatment plants.


2017 ◽  
Vol 3 (5) ◽  
pp. 883-896 ◽  
Author(s):  
Majid Neyestani ◽  
Eric Dickenson ◽  
Jean McLain ◽  
Victoria Obergh ◽  
Oscar Quinones ◽  
...  

This paper evaluates changes in antibiotic resistance during biological wastewater treatment.


2014 ◽  
Vol 51 (3) ◽  
pp. 12-17 ◽  
Author(s):  
Robert Smith ◽  
Sarah Elger ◽  
Scott Mleziva

Sign in / Sign up

Export Citation Format

Share Document