scholarly journals Rational parameters of the transportless technological scheme for the development of strata with maximum permissible dip angle

2021 ◽  
Vol 303 ◽  
pp. 01039
Author(s):  
Tatiana Gvozdkova ◽  
Manuela Koščova

In this article the rational value of overburden cut width and thickness of transportless overburden at mining of two dispersed flat seams IV-V and VI at Kureinsky section of Sibirginsky open pit mine are presented, which makes it possible to minimize the volume of rock re-excavation under the condition of the planned annual productivity of coal on the open pit and to ensure reduction of stripping costs. This task is complicated by the fact that the dip angle at the section is close to the limit on the condition of the possibility of spoiling of internal dump, and since the overburden rocks of the section are represented mainly by large-block sandstones on the clay cement and siltstones and their compressive strength is 60-80 MPa, then it is required to use a drilling and blasting method of their preparation for excavation. Under such conditions, optimizing the parameters of the transportless excavation scheme is of special importance for effective mining of the section.

Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


2020 ◽  
Vol 201 ◽  
pp. 01010
Author(s):  
Tulkin Annakulov

This article analyses the use of cyclic-flow technology schemes with mobile crushing and reloading complexes in open cast mining. An analysis of the application of cyclic-flow technology schemes with mobile crushing and reloading complexes in open cast mining shows that the main directions of its radical improvement are the development, creation and implementation of fundamentally new mining transport equipment and technological schemes for its quarries, which include: “mobile excavators crushing and transhipment plants and conveyor systems". Technological schemes for the development of rocks with an end arrangement of mobile complexes using a single bucket excavator and conveyor transport, with an end arrangement of mobile complexes and an increased width of the working platform during conveyor transport, with an end arrangement of mobile complexes and the presence of a mobile interstage loading crane with sequential mining at three horizons, a methodology has been developed for determining the working time and annual productivity of mobile crushing and handling conveyor complexes and a new technological scheme for the development of overburden ledges using mobile crushing and handling conveyor complexes. To reduce the time for idling the complex and reduce the number of exit ledges, a new technological scheme for the development of overburden ledges with the use of mobile complexes is recommended. As a result of the calculations according to the developed method, when working out two benches with different block lengths, the dependence of the annual productivity of the complex on the block length was established.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


Sensors ◽  
2021 ◽  
Vol 21 (4) ◽  
pp. 1148
Author(s):  
Hua Zhang ◽  
Pengjie Tao ◽  
Xiaoliang Meng ◽  
Mengbiao Liu ◽  
Xinxia Liu

With the growth in demand for mineral resources and the increase in open-pit mine safety and production accidents, the intelligent monitoring of open-pit mine safety and production is becoming more and more important. In this paper, we elaborate on the idea of combining the technologies of photogrammetry and camera sensor networks to make full use of open-pit mine video camera resources. We propose the Optimum Camera Deployment algorithm for open-pit mine slope monitoring (OCD4M) to meet the requirements of a high overlap of photogrammetry and full coverage of monitoring. The OCD4M algorithm is validated and analyzed with the simulated conditions of quantity, view angle, and focal length of cameras, at different monitoring distances. To demonstrate the availability and effectiveness of the algorithm, we conducted field tests and developed the mine safety monitoring prototype system which can alert people to slope collapse risks. The simulation’s experimental results show that the algorithm can effectively calculate the optimum quantity of cameras and corresponding coordinates with an accuracy of 30 cm at 500 m (for a given camera). Additionally, the field tests show that the algorithm can effectively guide the deployment of mine cameras and carry out 3D inspection tasks.


Author(s):  