scholarly journals Mapping and Managing Organization Objectives: A Case Study of the Alto Maipo Hydroelectric Project in Chile

2021 ◽  
Vol 147 (11) ◽  
pp. 05021022
Author(s):  
Jeffrey P. Walters ◽  
Hernán Alcayaga ◽  
Carolina Busco ◽  
Tamara Araya
2019 ◽  
Vol 227 ◽  
pp. 237-247 ◽  
Author(s):  
José Roberto Ribas ◽  
María Elena Arce ◽  
Flávio Augusto Sohler ◽  
Andrés Suárez-García

2017 ◽  
Vol 21 ◽  
pp. 11-14 ◽  
Author(s):  
Kanchan Chaulagai

Stability is the key issue in landslide stabilization. Methodology and component adopted in stabilizing the slide play vital role in this regards. In many occasion, stability measure adopted for controlling slide has been found to be unsuccessful, inadequate causing not only the safety risk but also huge economic loss. This paper describe history, effects, causes, stabilization measures and effectiveness of these measures played for controlling landslide of headwork area of Upper Mai Hydroelectric Project. The pioneering solution applied for landslide stabilization such as application of rock bolts, shotcrete and water management found to be highly effective in controlling the landslide.  HYDRO Nepal JournalJournal of Water Energy and EnvironmentIssue: 21, July, 2017Page: 11-14Upload Date: July 18, 2017


2021 ◽  
Vol 11 (4) ◽  
pp. 1655
Author(s):  
Hafeezur Rehman ◽  
Abdul Muntaqim Naji ◽  
Kyoungmin Nam ◽  
Saeed Ahmad ◽  
Khan Muhammad ◽  
...  

During underground construction, the behavior of the ground is influenced by characteristics of the rock mass with situ stresses and ground water, cross section of the excavation area, excavation method, and the rate of excavation. These fundamental features are considered to ensure the support and stability of underground excavations and achieve long-term successful operation. However, the ground composition of the Himalayas hinders tunnel excavation, especially in case of mechanized tunneling; this causes time and cost overruns. This study has reviewed the recently completed Neelum–Jhelum Hydroelectric Project; the project complexities, geological environments involving significant overburden and tectonic stresses, and effects of the excavation method on tunnel stability were analyzed. The major challenges that were encountered during construction are discussed herein along with their countermeasures. An analysis of project-related data reveals that latest techniques and approaches considering rock mechanics were used to complete the project; the existing approaches and methods were accordingly verified and extended. Apart from ground composition, the excavation methods used play an important role in the occurrence of severe rock bursts. Thus, the findings of this study are expected to be helpful for future tunneling projects in the Himalayas.


2015 ◽  
Vol 17 ◽  
pp. 24-33 ◽  
Author(s):  
Balendra Chhetry ◽  
Kumar Rana

In high sediment laden river projects or silt affected power stations, the frequency of repair and maintenance of underwater parts is comparatively higher which leads to increase the overall forced outages per year for repair The extent of the major maintenance will depend on the operating condition such as suspended sediment load passing through the turbine and how the machine was loaded during the operation. This paper illustrates the analysis of sediments, effect of sand erosion and maintenance of turbine of Kali Gandaki “A” Hydroelectric Plant (144 MW). The paper also describes the repair methods used for different turbine components to minimize the effects induced by sediment erosion. HYDRO Nepal JournalJournal of Water, Energy and EnvironmentIssue: 17, July 2015 


Sign in / Sign up

Export Citation Format

Share Document