Vista Ridge Land Acquisition: A P3 Success Story and a Case Study in Schedule Compression for a Long, Linear Water Pipeline Project

2020 ◽  
Author(s):  
Chris Noe ◽  
Bill Williams
2021 ◽  
Vol 11 (21) ◽  
pp. 10186
Author(s):  
Jin Yu ◽  
Chonghong Ren ◽  
Yanyan Cai ◽  
Jian Chen ◽  
Yuanqing Wang ◽  
...  

How to control deformation and avoid resonance is the key to ensuring the safety of the super-long pipeline when it is floating in the sea. Based on the deformation warning value of pipeline prototype composite material obtained from laboratory tests, the raw water pipeline project in Tong’an Xiamen adopts wireless communication equipment to transmit data, supplemented by aerial photography technology to monitor and feedback the strain and vibration during the dynamic construction of long-distance pipeline floating transportation. Combined with dynamic construction, this monitoring method avoids excessive deformation and resonance of the steel pipeline during floating transportation, and prevents the destruction of the anticorrosive coating. The airtightness test after completion shows that the whole pipeline meets the acceptance requirements. The monitoring results show that the strain at the bent position of the pipeline is large in the process of floating transportation, and the jacking speed and position of the tugboats have an important influence on the deformation of the pipeline. The same type of project should focus on these aspects and timely feedback monitoring data. At the same time, the study also provides detailed strain, modal analysis and effective monitoring technology for the safety of offshore steel pipeline floating transportation.


2019 ◽  
Vol 46 (12) ◽  
pp. 1160-1173 ◽  
Author(s):  
Zinab Abuwarda ◽  
Tarek Hegazy

Fast-tracking is an important process to speed the delivery of construction projects. To support optimum fast-tracking decisions, this paper introduces a generic schedule optimization framework that integrates four schedule acceleration dimensions: linear activity crashing; discrete activity modes of execution; alternative network paths; and flexible activity overlapping. Because excessive schedule compression can lead to space congestion and overstressed workers, the optimization formulation uses specific variables and constraints to prevent simultaneous use of overlapping and crashing at the same activity segment. To handle complex projects with a variety of milestones, resource limits, and constraints, the framework has been implemented using the constraint programming (CP) technique. Comparison with a literature case study and further experimentation demonstrated the flexibility and superior performance of the proposed model. The novelty of the model stems from its integrated multi-dimensional formulation, its CP engine, and its ability to provide alternative fast-track schedules to strictly constrained projects without overstressing the construction workers.


2011 ◽  
Vol 7 (3) ◽  
pp. 23
Author(s):  
Diane D. Galbraith ◽  
Fred L. Webb

The purpose of this case study is to provide a pedagogical teaching tool for undergraduate business students to fully comprehend the importance of the business management functions of planning, organizing, leading and controlling businesses. This case is inspired by events in the history of Rockwell International Corporation. As a major conglomerate struggles to transform itself over a period of eight decades, Rockwell provided a challenging problem for students to solve.