Risk assessment and management practices (RAMP) within the Tanzania construction industry: Implementation barriers and advocated solutions

2014 ◽  
Vol 14 (4) ◽  
pp. 239-254 ◽  
Author(s):  
Nicholas Chileshe ◽  
Geraldine John Kikwasi
2020 ◽  
Vol 14 (1) ◽  
pp. 10-19
Author(s):  
Abdullah Alshehri

Background: Every building project needs a plan for it to optimize value and minimize cost for better profitability. Currently, in the construction industry around the world, not all stakeholders are aware of value management and its benefits. Aim: This review aims to explore the awareness level of value management among all players in the construction industries. Also, to raise dust on the significance of applying value management within the construction workplace. Objective: The objective was explored using research and review papers from 30 studies for 18-years (2000-2018). Methods: Value management is essential at the briefing stage, specifically in the contractor's health and safety performance, the design process, cost and quality, contract strategy, and performance of time. Results: Results indicated that the level of awareness and implementation of value management varies from region to region and country to country. Some implementation barriers include lack of knowledge and awareness, no standard method of problem-solving, lack of value management practices by contractors, the concept is new in many regions, contractors not willing to implement VM fully during projects, and lack of qualified personnel to adopt VM. From this review, some of the benefits of adopting VM include maximizing productivity, better sustainability, and expected targets achieved within a reasonable time. Conclusion: In conclusion, the construction industry needs to put forth efforts to maximize the awareness and applications of value management to enhance project outcomes. The study is valuable for all the value management professionals involved with construction, in general, to try and incorporate it into their work ethics for better productivity.


Crisis ◽  
2018 ◽  
Vol 39 (1) ◽  
pp. 55-64 ◽  
Author(s):  
Jared F. Roush ◽  
Sarah L. Brown ◽  
Danielle R. Jahn ◽  
Sean M. Mitchell ◽  
Nathanael J. Taylor ◽  
...  

Abstract. Background: Approximately 20% of suicide decedents have had contact with a mental health professional within 1 month prior to their death, and the majority of mental health professionals have treated suicidal individuals. Despite limited evidence-based training, mental health professionals make important clinical decisions related to suicide risk assessment and management. Aims: The current study aimed to determine the frequency of suicide risk assessment and management practices and the association between fear of suicide-related outcomes or comfort working with suicidal individuals and adequacy of suicide risk management decisions among mental health professionals. Method: Mental health professionals completed self-report assessments of fear, comfort, and suicide risk assessment and management practices. Results: Approximately one third of mental health professionals did not ask every patient about current or previous suicidal thoughts or behaviors. Further, comfort, but not fear, was positively associated with greater odds of conducting evidence-based suicide risk assessments at first appointments and adequacy of suicide risk management practices with patients reporting suicide ideation and a recent suicide attempt. Limitations: The study utilized a cross-sectional design and self-report questionnaires. Conclusion: Although the majority of mental health professionals report using evidenced-based practices, there appears to be variability in utilization of evidence-based practices.


2014 ◽  
Vol 21 (3) ◽  
pp. 291-319 ◽  
Author(s):  
Nicholas Chileshe ◽  
Geraldine John Kikwasi

Purpose – Despite the extensive research on critical success factors (CSFs), there is a paucity of studies that examine CSFs for the deployment of risk assessment and management processes in developing countries, particularly, Africa. The purpose of this paper is to investigate the perception of construction professionals on CSFs appertaining to the deployment of risk assessment and management practices (RAMP) in Tanzania with the aim of filling the knowledge gap. Design/methodology/approach – The primary data were collected from 67 construction professionals working with clients (private and public), consultants, and contractor organisations (foreign and local) within the Tanzanian construction. Response data was subjected to descriptive and inferential statistics with one-way analysis of variance to examine the differences in the perception of the identified CSFs. Findings – The descriptive and empirical analysis demonstrated a disparity of the ranking of the ten CSFs among the groups; however, the differences were not significant. Based on the overall sample, the results of the mean score ranking indicate that “awareness of risk management processes”; “team work and communications”; and “management style” were the three highly ranked CSFs whereas “co-operative culture”; “customer requirement”; and “positive human dynamics” were considered to be the least important. Research limitations/implications – The study did not differentiate the perceptions of the CSFs according to the ownership (local or foreign), and the sample consisted of organisations in one industry operating in Tanzania. Consequently, the findings may not generalise to other industries or to organisations operating in other countries. Practical implications – For RAMP to be implemented effectively, Tanzanian constructional-related organisations should consider the identified CSFs as a vehicle for improving project success through reduction of risk uncertainty. Furthermore, regardless of the type of organisation, “management style”, “team work and communication” are necessary for the successful deployment of RAMP. Originality/value – This study makes a contribution to the body of knowledge on the subject within a previously unexplored context. The study provides insights on the drivers and enablers (CSFs) of risk assessment implementation across the Tanzania construction sector.


Author(s):  
Ivo Iavicoli ◽  
Veruscka Leso ◽  
Marco Piacci ◽  
Dante Luigi Cioffi ◽  
Irina Guseva Canu ◽  
...  

The widespread industrial application of nanotechnology has increased the number of workers exposed to engineered nanomaterials (ENMs), but it is not clear to what extent prevention guidance is practiced. Our aim was to explore the extent that companies manufacturing and/or using ENMs apply risk assessment and management measures. Thirty-four companies were surveyed with an international 35-item questionnaire investigating company and workforce features, types of ENM handled, and risk evaluation and preventive measures adopted. Among participating companies, 62% had a maximum of 10 employees. Metal-based nanomaterials were most frequently identified (73%). Environmental monitoring was performed by 41% of the companies, while engineering exposure controls were approximately reported by 50%. Information and training programs were indicated by 85% of the sample, only 9% performed specific health surveillance for ENM workers. Personal protective equipment primarily included gloves (100%) and eye/face protection (94%). This small-scale assessment can contribute to the limited amount of published literature on the topic. Future investigations should include a greater number of companies to better represent ENM workplaces and a direct access to industrial settings to collect information on site. Finally, deeper attention should be paid to define standardized frameworks for ENM risk assessment that may guide nano-specific preventive actions.


Sign in / Sign up

Export Citation Format

Share Document