scholarly journals Justification of Longwall Mining Technology for the Development of Kieselguhr Deposit in Sig Mine, Algeria

Author(s):  
Abdessattar Lamamra ◽  
Dimitriy L. Neguritsa ◽  
Vitaly A. Eremenko
2019 ◽  
Vol 2019 ◽  
pp. 1-13
Author(s):  
Shengrong Xie ◽  
Xiaoyu Wu ◽  
Dongdong Chen ◽  
Yaohui Sun ◽  
Junchao Zeng ◽  
...  

Automatic roadways on gob-side entry retaining with no-pillars are used for longwall mining technology. The mining technology with no-pillars can recover coal pillar resources and reduce the amount and cost of roadway excavations. Automatic roadway technology for cutting roofs by combined support on gob-side entry retaining with no-pillars is adopted for the condition of thick immediate roof and medium-thick coal seam mining, cutting off the immediate roof and the main roof on the gob by combined support. The fractured roof forms gangue blocks to fill the gob and loads the overlying strata. The gangue control system is placed on the roadside, which controls the caving gangue to form a gangue rib. In this paper, the viewpoints and key technologies (the roof-cutting technology, the reinforcement and support technology, the gangue rib control technology, and the auxiliary support technology) of automatic roadway technology for cutting roofs by combined support on the gob-side entry retaining with no-pillars are introduced. Furthermore, the formation and control process are explained. The numerical simulation is used to simulate and analyze the roof hanging and the roof cutting structures. In addition, a field engineering test is performed. The field test shows that automatic roadway technology for cutting roofs by combined support on gob-side entry retaining with no-pillars is feasible. This process uses construction techniques and technologies to meet on-site production needs. The combined support has high resistance strength and is shrinkable. In engineering applications, the combined support has a low damage rate. The deformation of the automatic roadway with gob-side entry retaining is small, and the control effect is significant.


2020 ◽  
Vol 97 ◽  
pp. 103236 ◽  
Author(s):  
Yajun Wang ◽  
Manchao He ◽  
Jun Yang ◽  
Qi Wang ◽  
Jianning Liu ◽  
...  

Minerals ◽  
2017 ◽  
Vol 7 (1) ◽  
pp. 14 ◽  
Author(s):  
Jingli Zhao ◽  
Pengfei Wang ◽  
Yue Su

2019 ◽  
Vol 11 (22) ◽  
pp. 6470
Author(s):  
Qin ◽  
Wang ◽  
Zhang ◽  
Guan ◽  
Zhang ◽  
...  

The scientific and efficient mining of ultra-thick coal seam in Xinjiang, China is faced with the problems of low exploration level and lack of theoretical research on underground mining. This paper studied occurrence characteristic of ultra-thick coal seams in Xinjiang, using field investigation and drilling exploration. Based on the variation law of support load under different roof bearing structure form and development height in multi-layer mining, classification method and mining technology selection of ultra-thick coal seam were put forward. The results indicate that: 1) The ultra-thick coal seams in Xinjiang have a distribution characteristic of more north and less south, more east and less west, mainly concentrate in East Junggar and Turpan-Harmi coalfields. The form of the ultra-thick coal seam has the remarkable characteristic of coal seams merging and bifurcating. 2) The mechanical model of the relationship between the support and surrounding rock under different roof bearing structures is established. At the early stage of multi-layer mining, the support load includes the load caused by rotary subsidence of the blocks that formed the near-stope roof bearing structure and the gravity load of rock blocks under roof bearing structure. At the later stage, the support load is mainly gravity load of loose blocks below the far-stope roof bearing structure. 3) According the roof bearing structure form, ultra-thick coal seam can be divided into three types: no stable bearing structure, (higher) beam bearing structure and arch bearing structure. In order to ensure the stability of near-stope roof bearing structure, backfill mining, longwall mining, and longwall mining early and backfill mining later should be adopted in three types ultra-thick coal seams mining respectively.