scholarly journals Analysis and application of stress distribution in 24-m high bench loosening blasting with axially uncoupled charge structure in Barun Open-pit Mine

2021 ◽  
Vol 804 (2) ◽  
pp. 022059
Author(s):  
Zuoming Yin ◽  
Xuguang Wang ◽  
Desheng Wang ◽  
Zhiheng Dang ◽  
Jiahao Bi
2021 ◽  
Vol 2021 ◽  
pp. 1-13
Author(s):  
Zuoming Yin ◽  
Desheng Wang ◽  
Xuguang Wang ◽  
Zhiheng Dang ◽  
Wantao Li

In view of the near slope blasting in Barun open-pit mine, which has merged sublevel mining, the operation safety conditions of middle-sized and large equipment in the second phase expansion are poor and need urgent improvement. To increase the efficiency of expansion and reduce costs, a 24-m-high bench and large spacing parameter for loosening blasting are proposed. The analysis of the physical mechanism of the stress wave attenuation in the rock indicates that the cylindrical charge is equivalent to several spherical charges. Considering the pressure attenuation, reflection, transmission, and superposition of the spherical charge after the equivalence, a double exponential function correction equation of the stress wave attenuation is obtained based on the Mises strength criterion. The stress of any point in the rock medium with various spacing parameter is obtained by calculation. ANSYS/LS-DYNA was used to simulate and study the stress distribution of a 24-m-high bench with various spacing parameter. Meanwhile, the accuracy of the correction equation was verified. The parameters of the high-bench blasting with good effect and low cost were determined to be 15 m  ×  5.5 m, and field tests were carried out. Results show that the large spacing parameter for 24-m-high bench loosening blasting in Barun open-pit mine is efficient and economical in medium-hard rock blasting. This study provides a reference for the practical exploration of the expansion of high benches in open-pit mines in China. The calculation error of the corrected double exponential function is near the numerical simulation result. It is suitable for all kinds of professional designers.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


Sensors ◽  
2021 ◽  
Vol 21 (4) ◽  
pp. 1148
Author(s):  
Hua Zhang ◽  
Pengjie Tao ◽  
Xiaoliang Meng ◽  
Mengbiao Liu ◽  
Xinxia Liu

With the growth in demand for mineral resources and the increase in open-pit mine safety and production accidents, the intelligent monitoring of open-pit mine safety and production is becoming more and more important. In this paper, we elaborate on the idea of combining the technologies of photogrammetry and camera sensor networks to make full use of open-pit mine video camera resources. We propose the Optimum Camera Deployment algorithm for open-pit mine slope monitoring (OCD4M) to meet the requirements of a high overlap of photogrammetry and full coverage of monitoring. The OCD4M algorithm is validated and analyzed with the simulated conditions of quantity, view angle, and focal length of cameras, at different monitoring distances. To demonstrate the availability and effectiveness of the algorithm, we conducted field tests and developed the mine safety monitoring prototype system which can alert people to slope collapse risks. The simulation’s experimental results show that the algorithm can effectively calculate the optimum quantity of cameras and corresponding coordinates with an accuracy of 30 cm at 500 m (for a given camera). Additionally, the field tests show that the algorithm can effectively guide the deployment of mine cameras and carry out 3D inspection tasks.


Author(s):  
Wang Cao ◽  
Yachun Mao ◽  
Lianhuan Wei ◽  
Liming He ◽  
Zhanguo Zhao
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document