scholarly journals The Factors Affecting on Earned Value Management

Author(s):  
Sedqi Esmaeel Rezouki ◽  
Sabreen Baqer Mortadha
2020 ◽  
Vol 26 (6) ◽  
pp. 524-533
Author(s):  
Morteza Bagherpour ◽  
Mohammad Khaje Zadeh ◽  
Amin Mahmoudi ◽  
Xiaopeng Deng

The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM). EVM is a well-known approach in project management context that can monitor schedule and cost performance indexes in projects simultaneously. The EVM detects current project performances and also predicts at completion costs of the project. In this study, employing Interpretive Structural Modelling, interactions which exist among affecting factors on EVM’s success are determined. First, all of the practical factors on EVM are determined and categorized into four main clusters; then the most effective ones are separated from the clusters; eventually, ISM is used based on eleven ultimate critical criteria. The results demonstrate that “Instability in the construction market” and “Macroeconomic indicators” are the most influencing factors affecting the EVM. Finally, a novel method for enhancing the performance of conventional EVM is presented. The proposed approach would be highly applicable for engineering managers who are willing to promote the current performance of the systems. Most studies have been previously carried out on the applications of the EVM in terms of improving final cost and total duration elapsed whereas there is not any particular study on the EVM issue which has stated the key factors that influence the EVM and lasting effect on the project performance. It should be noted that the proposed approach can be employed through the life cycle of any project particularly in construction projects.


2019 ◽  
Vol 19 (4) ◽  
pp. 550-569 ◽  
Author(s):  
Maan Nihad Ibrahim ◽  
David Thorpe ◽  
Muhammad Nateque Mahmood

Purpose The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects. Design/methodology/approach A qualitative research approach has been adopted for identifying risk-related factors influencing EVM concept from a literature review and through interviewing industry personnel, followed by an inductive process to form sets of key factors and their measuring items. Findings EVM is a common method for assessing project performance. A weakness of this approach is that EVM assessment in its current form does not measure the impact of a number of project performance factors that result from the complexity of modern infrastructure construction projects, and thus does not accurately assess their impact in this performance. This paper discusses and explains a range of potential risk factors to evaluating project performance such as sustainability, stakeholder requirements, communication, procurement strategy, weather, experience of staff, site condition, design issues, financial risk, subcontractor, government requirements and material. In addition, their measuring items were identified. Practical implications This research assists projects managers to improve the evaluation process of infrastructure construction performance by incorporating a range of factors likely to impact on that performance and which are not included in current EVM calculations. Originality/value This research addresses the need to include in the EVM calculation a range of risk factors affecting the performance of infrastructure projects in Australia and therefore makes this calculation a more reliable tool for assessing project performance.


2021 ◽  
pp. 1-14
Author(s):  
Seyed Taha Hossein Mortaji ◽  
Siamak Noori ◽  
Morteza Bagherpour

Earned value management is well-known as the most efficient method of project monitoring and control providing relatively reliable information about the project performance. However, this method requires accurate estimates of the progress of project activities, which are always associated with uncertainties that, if ignored or not addressed well, lead to incorrect results. To address this issue, the application of multi-valued logic, in particular fuzzy logic, in earned value management has recently attracted a lot of attention both in practice and research. This paper introduces directed earned value management (DEVM) in which ordered fuzzy numbers are used to express the so-called uncertainties as well as to capture more information about the trend of the project progress. To evaluate the performance of the proposed method, several numerical examples and a case study are presented. The results reveal that compared to the existing methods, DEVM has a lower computational complexity. Also, it doesn’t suffer from the overestimation effect and as a result, it has a higher ability to express project-specific dynamics. In sum, the proposed method allows project managers to make informed decisions that lead to taking preventive and corrective actions promptly and at a lower cost.


2014 ◽  
Vol 971-973 ◽  
pp. 2317-2320
Author(s):  
Xiang Jun Yu ◽  
Chao Xie ◽  
Tian Ming Huang

This paper briefly introduces the basic connotation of earned value management, determine, from the target variable management process design, system function design and system implementation four aspects that the management of defense scientific research project management system design and implementation process based on the earned value, and some reasonable countermeasures to promote the use of the system.


Sign in / Sign up

Export Citation Format

Share Document