Regret Approach in Estimating Traffic Volume for a Congested Road with Unknown Inverse Demand Function

Author(s):  
Tianliang Liu ◽  
Yan Wang
2020 ◽  
Vol 9 (1) ◽  
pp. 32-37
Author(s):  
Ruslan Hidayat ◽  
Saiful Arfaah

One of the most important factors in the structure of the pile foundation in the construction of the bridge is the carrying capacity of the soil so as not to collapse. Construction of a bridge in the village of Klitik in Jombang Regency to be built due to heavy traffic volume. The foundation plan to be used is a pile foundation with a diameter of 50 cm, the problem is what is the value of carrying capacity of soil and material. The equipment used is the Dutch Cone Penetrometer with a capacity of 2.50 tons with an Adhesion Jacket Cone. The detailed specifications of this sondir are as follows: Area conus 10 cm², piston area 10 cm², coat area 100 cm², as for the results obtained The carrying capacity of the soil is 60.00 tons for a diameter of 30 cm, 81,667 tons for a diameter of 35 cm, 106,667 tons for a diameter of 40 cm, 150,000 tons for a diameter of 50 cm for material strength of 54,00 tons for a diameter of 30 cm, 73,500 tons for a diameter of 35 cm, 96,00 tons for a diameter of 40 cm, 166,666 tons for a diameter of 50 cm


2018 ◽  
Vol 7 (1) ◽  
pp. 51-60
Author(s):  
Fitri Wulandari ◽  
Nirwana Puspasari ◽  
Noviyanthy Handayani

Jalan Temanggung Tilung is a 2/2 UD type road (two undirected two-way lanes) with a road width of 5.5 meters, which is a connecting road between two major roads, namely the RTA road. Milono and the path of G. Obos. Over time, the volume of traffic through these roads increases every year, plus roadside activities that also increase cause congestion at several points of the way. To overcome this problem, the local government carried out road widening to increase the capacity and level of road services. The study was conducted to determine the amount of traffic volume, performance, service level of the Temanggung Tilung road section at peak traffic hours before and after road widening. Data retrieval is done by the direct survey to the field to obtain primary data in the form of geometric road data, two-way traffic volume data, and side obstacle data. Performance analysis refers to the 1997 Indonesian Road Capacity Manual (MKJI) for urban roads. From the results of data processing, before increasing the road (Type 2/2 UD), the traffic volume that passes through the path is 842 pcs/hour and after road widening (Type 4/2 UD) the traffic volume for two directions is 973 pcs/hour, with route A equaling 528 pcs/hour and direction B equaling 445 pcs/hour. Based on the analysis of road performance before road enhancement, the capacity = 2551 pcs/hour, saturation degree = 0.331, and the service level of the two-way road are level B. Based on the analysis of the performance of the way after increasing the way, the direction capacity A = 2686 pcs/hour and direction B = 2674 pcs /hour, saturation degree for direction A = 0.196 and direction B = 0.166, service level for road direction A and direction B increase to level A


2019 ◽  
Vol 9 (2) ◽  
pp. 145-170
Author(s):  
Sang-Won Park ◽  
◽  
Young-Soo Park ◽  
Song-Jin Na

2020 ◽  
Vol 4 (26) ◽  
pp. 122-130
Author(s):  
A. A. Dobrovolskaya ◽  

The article deals with statistics on the development of Bicycle roads in Russia and in the world, as well as design methods for a specific section of the connection of Bicycle routes in St. Petersburg. The article discusses the experience of using and entering bike paths based on the experience of Finland, as well as the types of bike paths and infrastructure features for metropolises. A model for creating a bike path by partially narrowing the roadway, graphical functions, and analytical information are provided. Practical examples of changing the infrastructure for bike paths are given. Keywords: bike path, traffic volume, design the roadway, lane width.


Sign in / Sign up

Export Citation Format

Share Document