A Comprehensive Protection Scheme for the Construction of New Energy Plant Station

Author(s):  
Jinxiong Zhao ◽  
Zhiru Li ◽  
Xiaodi Xie ◽  
Xun Zhang ◽  
Chen Liang ◽  
...  
2013 ◽  
Vol 807-809 ◽  
pp. 392-401 ◽  
Author(s):  
Chong Jian Ma ◽  
Hui Ming ◽  
Hua Shou Li

currently, the comprehensive utilization of red mud has been a worldwide challenge. Due to high alkaline level and a serious lack of nutrients, a great amount of red mud has been stocked in the open rather than covered by plantations, which showed harms to the atmosphere, water and soil environment. In order to explore a more effective phytoremediation approach of red mud and screen plants with strong tolerance, the research group applied Pennisetum hybridum as the experiment material for a long term, which is a new energy plant in the field of ecological environmental management and restoring. Through the addition of different types of addictives, his experiment conducted the plantation Pennisetum hybridum based on red mud improvement matrix. Besides, a systematic research of the improvement effects of different ameliorants on red mud was conducted. Concurrently, the growth of Pennisetum hybridum in different groups of the experiment was investigated. Their mutual effect on the improvement effect of red mud was analyzed systematically. Results demonstrated that effective raw materials of red mud improvement include phosphogypsum, wastes of polluted and edible mushrooms. These can significantly reduce the pH and conductivity of red mud. After the improvement, Pennisetum hybridum can grow vigorously in the mixture matrix of red mud, and significantly improve the red mud matrix. Concurrently, considerable biomasses were obtained. The experiment results demonstrated that the addition of necessary nutriments for the plant growth was very important for red mud. The research has laid a solid foundation for the identification of the great potentials of Pennisetum hybridum in red mud phytoremediation, the further exploration of its role of restoring of red mud and the extensive application and promotion in the future.


2014 ◽  
Vol 960-961 ◽  
pp. 1376-1380
Author(s):  
Chong Xin Xu ◽  
Yan Jun Jiao

Power generation becomes a main way of using new energy. However, the access of distributed generation(DG) causes the ordinary protection system develop a series of problems. In this paper, the structure of distribution network with DG is introduced firstly.Secondly,it is analysed that the effect that DG brings to distribution network protection, and then a new protection scheme of distribution network with DG is put forward. The segment I, II of direction three-current protection on the line which is at the upstream of DG, and the next line’s segment I, II consists of a simple communication unit. Through the comprehensive judgment of two protections’ action results, fault can be isolated in minimum range quickly and accurately. Finally, the correctness and feasibility of the new protection principle are verified by simulating a 10KV distribution system.


2017 ◽  
Vol 2017 (13) ◽  
pp. 2203-2206 ◽  
Author(s):  
Daohua Zhu ◽  
Yajuan Guo ◽  
Jinming Chen ◽  
Yan Li ◽  
Haitao Jiang

2021 ◽  
Vol 11 (1) ◽  
pp. 6730-6733
Author(s):  
K. A. Samo ◽  
A. Baharun ◽  
A. R. H. Rigit

Renewable energy sources are considered a part of the future of energy production in Malaysia. The main objectives of this research are to append a new energy extraction technique that harvests energy from tides and to develop a preliminary design for a tidal energy plant at Kuching Barrage. Knowing the diameter of the turbine, the dimensions of the powerhouse are achieved in conjunction with site conditions. The centerline should be at least below the low water tide so that the tide is at all times guaranteed to be submerged. Based on this, the powerhouse has a 24.61m length, is about 100m in distance across, and its elevation is 36.39m. The construction is located downstream and the centerline habitation at -1.15 and below LSD. The calculated tidal energy plant is comprised of four bulb-type turbines installed at each barrage gate. The bulb-type turbine blades would face the sea site with 11.32m length of the draft tube. This study detailed feasibility study can be implemented.


2012 ◽  
Vol 4 (6) ◽  
pp. 062704 ◽  
Author(s):  
Xu Hui-Min ◽  
Tam Fung-Yee ◽  
Li Peng-Yuan ◽  
Zan Qi-Jie ◽  
Liao Wen-Bo ◽  
...  
Keyword(s):  

Sign in / Sign up

Export Citation Format

Share Document