Study of MiniGrid Control Automation in Distribution Electric Networks with Low-Power Generation

Author(s):  
Andrey Marchenko ◽  
Inna Murashkina
2021 ◽  
Vol 315 ◽  
pp. 03007
Author(s):  
Ivan Paskar ◽  
Fedor Nepsha ◽  
Gennadij Lebedev

The prerequisites for the implementation of distributed generation facilities in the power grid complex of the region are highlighted. A technocenological approach has been chosen for the economically and technically sound implementation of power sources. The procedures for the verification and visualization of the technocenosis were carried out, and the stability of the existing generation system was determined. The analysis of the generating complex with the power units expected to be commissioned has been carried out. It is concluded that it is necessary to install a distributed generation facility of low power to improve energy security.


2018 ◽  
Vol 20 (7) ◽  
pp. 5021-5027 ◽  
Author(s):  
Luigi Cigarini ◽  
Alice Ruini ◽  
Alessandra Catellani ◽  
Arrigo Calzolari

Poly(3,4-ethylenedioxythiophene) (PEDOT) semiconductor plays a relevant role in the development of organic thermoelectric (TE) devices for low-power generation.


2020 ◽  
Vol 209 ◽  
pp. 07012
Author(s):  
Oleg V. Zapanov ◽  
Lidiia I. Kovernikova

Joint Stock Company (JSC) “Mine Aleksandrovsky” is located in the Mogochinsky district of the Trans-Baikal Territory. “Mine Aleksandrovsky” concluded an energy supply agreement with JSC “Chitaenergosbyt” for the purchase of electric energy from it. In accordance with the contract, the electric energy supplier undertakes to supply electric energy that meets the requirements of the current legislation of the Russian Federation. The power quality in the Trans-Baikal Territory in most regions does not meet the requirements of State Standard 32144-2013. Suppliers and the network organization are responsible to consumers for the reliability of its electric energy supply and its quality within the boundaries of their electric networks. Despite the obligations of the contract, the electric energy supplied to “Mine Alexandrovsky” does not meet the requirements. In 2017 the ball mill engine in the shredding department of the gold recovery factory failed as a result of power outages and the supply of low power quality through the 6 kV line. The article provides information on interruptions in power supply over the years of operation of the enterprise, the results of analysis of the power quality, information on damage to electrical equipment caused by low power quality, and economic damage.


2017 ◽  
Vol 10 (1) ◽  
pp. 19-29
Author(s):  
Yutaka Hara ◽  
Shohei Kogo ◽  
Katsuhiro Takagaki ◽  
Makoto Kawanishi ◽  
Takahiro Sumi ◽  
...  

2012 ◽  
Vol 20 (21) ◽  
pp. 23100 ◽  
Author(s):  
Stefano Azzini ◽  
Davide Grassani ◽  
Michael J. Strain ◽  
Marc Sorel ◽  
L. G. Helt ◽  
...  

Author(s):  
T. C. Briles ◽  
Su-Peng Yu ◽  
K. Srinivasan ◽  
S. A. Diddams ◽  
S. B. Papp

Sign in / Sign up

Export Citation Format

Share Document