A conceptual framework for Social Network Analysis of Building Information Modelling in construction projects

Author(s):  
Fotios Gardounis ◽  
Heap-Yih Chong ◽  
Xiangyu Wang
2016 ◽  
Vol 23 (3) ◽  
pp. 327-337 ◽  
Author(s):  
Bartug Kemal AKGUL ◽  
Beliz OZORHON ◽  
Irem DIKMEN ◽  
M. Talat BIRGONUL

Investigation of market entry strategies is critical for the success of international contractors. Establishing partnerships is among the most effective vehicles of operating in international markets. The major objective of this paper is to analyze the partnership behavior of contractors in overseas projects. In this respect, social network analysis (SNA) was used to better understand the collaborative project networks in different markets and for projects of differing sizes. A database was developed based on the collaborative international construction projects where Turkish firms and their non-Turkish partners were involved. A total of 449 projects carried out in 46 countries were used for the analysis. The findings of the study suggest that contractors adopt different strategies depending on the market and project character­istics. The majority of the companies tend to remain in the same markets; they keep working with the same partners or choose local partners; and engage with multiple partners in more complex projects. This study is expected to help contractors reflect on their internationalization decisions and devise appropriate strategies to establish project networks.


2020 ◽  
Vol 312 ◽  
pp. 02002
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Patrick Manu ◽  
Clinton Aigbavboa

With more than 80% of all construction projects overrunning their budget, there is a need for more efficient management of the estimated 10% of Gross Domestic Product (GDP) that is expended annually on construction across the world. It has been proposed that better information and data management through Building Information Modelling (BIM) will lead to cost savings and greater predictability. Notwithstanding the role of quantity surveyors (QS) in modelling and managing construction cost, they remain among the least capable of assimilating BIM into their existing traditional processes. Despite the increasing need for BIM capability assessments for projects, there remains, no tool specifically developed for assessing QS firm’s BIM utilisation capacity or performance. As a result, it is unclear the attributes that indicate BIM capability of QS firms as well as QS practices on projects. This study sought to address this through a review of BIM capability assessment frameworks in order to ascertain their suitability for QS practices. An expert focus group discussion was then used to identify peculiar attributes suitable for QS BIM capability assessment as a precursor to the development of a comprehensive model of QS BIM capability maturity. Findings reveal that most QS BIM capability attributes relate to processes including criteria for effective information definition and data management such that they are consistent with QS measurement standards. The BIM competence of staff also emerged as one of the key attributes highlighting the need for QSs to improve their knowledge, skills and experience in the application of BIM amidst current low levels of adoption. The proposed attributes would assist the development of performance and maturity indicators that would help QS firms better understand their own capability as well as the requirements for delivering costing services through BIM on projects.


MODUL ◽  
2019 ◽  
Vol 19 (1) ◽  
pp. 15
Author(s):  
Bangun IR Harsritanto ◽  
Gentina Pratama Putra ◽  
Rona Fika Jamila

Building information modelling (BIM) is a system that integrates multi-dimensional aspects of construction project at every phase. Simply said BIM unified all project databases from and to all stakeholders. This system still continuously developed and widely spread on each countries construction projects. In architecture, the BIM has been revolute the human resource requirements on the projects. Indonesia as developing country is still performing transitions from large worker project into more compact projects; from centralized projects into decentralized project. The BIM system has been a mandatory in several Indonesia big infrastructure projects to plan, simulate, design and deliver databases for making more quick decision making and improve the facilities. This paper aim is describing the benefit-challenge factors of BIM adoption on Indonesia architecture projects and the potential driving factors of BIM application. This study was qualitative paradigm with analysis method of selected literatures and previous research paper review which stratified by the cases. The results of this study are BIM bring the high efficiency and represent the complete skills for an architect. However the high initial cost of technology and human investment, the unsupported regulation and conventional system resistant challenged the Indonesia architecture society to adopt BIM. Furthermore the Indonesia architecture education is still struggling to learn and teach the BIM as an integral part in studio as the agent of change.


Facilities ◽  
2019 ◽  
Vol 37 (7/8) ◽  
pp. 415-434 ◽  
Author(s):  
Nadeeshani Wanigarathna ◽  
Keith Jones ◽  
Adrian Bell ◽  
Georgios Kapogiannis

Purpose This paper aims to investigate how digital capabilities associated with building information modelling (BIM) can integrate a wide range of information to improve built asset management (BAM) decision-making during the in-use phase of hospital buildings. Design/methodology/approach A comprehensive document analysis and a participatory case study was undertaken with a regional NHS hospital to review the type of information that can be used to better inform BAM decision-making to develop a conceptual framework to improve information use during the health-care BAM process, test how the conceptual framework can be applied within a BAM division of a health-care organisation and develop a cloud-based BIM application. Findings BIM has the potential to facilitate better informed BAM decision-making by integrating a wide range of information related to the physical condition of built assets, resources available for BAM and the built asset’s contribution to health-care provision within an organisation. However, interdepartmental information sharing requires a significant level of time and cost investment and changes to information gathering and storing practices within the whole organisation. Originality/value This research demonstrated that the implementation of BIM during the in-use phase of hospital buildings is different to that in the design and construction phases. At the in-use phase, BIM needs to integrate and communicate information within and between the estates, facilities division and other departments of the organisation. This poses a significant change management task for the organisation’s information management systems. Thus, a strategically driven top-down organisational approach is needed to implement BIM for the in-use phase of hospital buildings.


10.5772/58447 ◽  
2014 ◽  
Vol 11 (8) ◽  
pp. 124 ◽  
Author(s):  
Jian Li ◽  
Ying Wang ◽  
Xiangyu Wang ◽  
Hanbin Luo ◽  
Shih-Chung Kang ◽  
...  

2021 ◽  
Vol 19 (01) ◽  
pp. 180-197
Author(s):  
Vladimir Popov ◽  
Milena Medineckienė ◽  
Tatjana Grigorjeva ◽  
Arūnas Remigijus Zabulėnas

Traditional construction planning is being replaced by the building information modelling (BIM) approach, which seeks to digitalise all the construction procedures, including procurement. Successful implementation of BIM on the market requires the preparation of appropriate procurement documents. Purpose – to suggest the most suitable set of documents for public procurement in the context of BIM by analysing the documents that are necessary for implementing the stages of the building life cycle. Research methodology – in order to achieve the aim of the research, the in-depth analysis of different countries’ procurement methodological documents and analysis of the scientific articles have been implemented. The methodology also includes expert interviewing, which was done in order to analyse the investigated standards. Findings – After analysing the procurement procedures of Norway, Spain, France, Poland, the United Kingdom, the Netherlands, and Finland, a set of documents, including Employer’s Information Requirements (EIR), BIM Execution Plan (BEP) and BIM protocol, was considered as the most suitable for BIM-based procurement processes. In addition, the basic principles of ISO 19650-2:2018 do not reflect the specific conditions of each country, so it is appropriate to examine the possibility of providing guidance in individual national annexes that reflects the peculiarities of national procurement. Research limitations – some research limitations were related to the challenges to access the literature, particularly the regulatory documentation associated with the public procurement procedure in a singular Country. Also, the difficulties with and accessing the document in the English language. However, in most of these cases, the document overview was analysed or translated from the native language. Originality/Value – existing related studies are mainly oriented on a particular region/country, and no general overview of European countries regarding BIM procurement procedures has been implemented. Additionally, a significant scientific contribution of this research is the review of the fundamental standards, which includes the general specification for information management in construction projects using BIM. Implemented analysis can serve as a basis for other authors to implement their research concerning their region, to suggest the most appropriate and suitable set of documents. Practical implications – this study contributes to the preparation of the Lithuanian market for the implementation of BIM and could help policy-makers to prepare the most appropriate procurement documents.


Sign in / Sign up

Export Citation Format

Share Document