Study on an Intelligent Monitoring Application System of Construction Machinery

Author(s):  
Qinghui Zhou ◽  
Jianmin Sun
Author(s):  
M. Jobs ◽  
F. Lantz ◽  
B. Lewin ◽  
E. Jansson ◽  
J. Antoni ◽  
...  

2013 ◽  
Vol 347-350 ◽  
pp. 3292-3296
Author(s):  
Li Li Tang

After years of digital campus information construction, the school has been set up covering the operation, management, monitoring, application system. Between each application system need to standardize the data exchange services. Data exchange platform construction of university digital campus management system is the realization of system integration, the key measure to solve the problem of data sharing and exchange, is also necessary to promote and realize the resource integration and application integration infrastructure.


1994 ◽  
Vol 33 (01) ◽  
pp. 60-63 ◽  
Author(s):  
E. J. Manders ◽  
D. P. Lindstrom ◽  
B. M. Dawant

Abstract:On-line intelligent monitoring, diagnosis, and control of dynamic systems such as patients in intensive care units necessitates the context-dependent acquisition, processing, analysis, and interpretation of large amounts of possibly noisy and incomplete data. The dynamic nature of the process also requires a continuous evaluation and adaptation of the monitoring strategy to respond to changes both in the monitored patient and in the monitoring equipment. Moreover, real-time constraints may imply data losses, the importance of which has to be minimized. This paper presents a computer architecture designed to accomplish these tasks. Its main components are a model and a data abstraction module. The model provides the system with a monitoring context related to the patient status. The data abstraction module relies on that information to adapt the monitoring strategy and provide the model with the necessary information. This paper focuses on the data abstraction module and its interaction with the model.


Author(s):  
A. D. Terenteva

In civil engineering in Russia, trenching for utilities is currently under digging. To perform such works, it is necessary to use high-precision construction machinery, because inaccurate performance of works can lead to the break down of existing utilities, thereby affecting the residents of nearby houses and demanding the additional works for renewal.The most universal labour saver to perform construction works is hydraulic driven single-bucket excavators, which provide up to 38% of works. Therefore, to improve technical characteristics that affect the accuracy of the work performed is an important task.High requirements for the performance of works are defined by existing construction regulations: an allowable soil layer to remain is at most 0.05 m. To fulfil such requirements, an exact assessment of the working mechanism position and a trench profile is necessary.Examination of a manually operated digging process shows that an operator provides operations untimely, however an automated control system can solve this problem. Dynamic phenomena in the working mechanism have the greatest impact on the accuracy of the works performed.To assess the bucket digging edge position accuracy, a mathematical model of the working mechanism has been created. Based on the cycle scheme of the working process, the excessive displacements of the hydraulic cylinder rods under the load are taken into account. By the end of the cycle, the difference between the specified and obtained positions along the vertical coordinate has been 0.0892 m.A dynamic error of the hydraulic drive system of the working mechanism is considered as a sum of the error due to excessive displacements of the hydraulic cylinder rods and the error due to delay of the hydraulic drive, with the latter being calculated for the average time of delay taking into account the data available in the literature. The total error of the bucket digging edge position of the working mechanism is 0.1176 m, which is 2 times more than the value of 0.05 mConformity of all the links with specification requirements does not guarantee compliance with the required displacement accuracy of the bucket digging edge, and, thus, the soil layer to remain in the base of the trench can exceed the regulated value of 0.05 m.


Sign in / Sign up

Export Citation Format

Share Document