Joint Tactical Information Distribution System (JTIDS)/multi-link test device (MLTD) laboratory environment test system

Author(s):  
F. Goldstein ◽  
M. McDonough

2013 ◽  
Author(s):  
JOINT TACTICAL NETWORKING CENTER SAN DIEGO CA


1997 ◽  
Vol 35 (11-12) ◽  
pp. 77-80 ◽  
Author(s):  
A. Wiedenmann ◽  
M. Braun ◽  
K. Botzenhart

A simple continuous flow device in which bacteria were immobilised on membrane filters and flushed with tap water with free chlorine residuals of 0.05, 0.1, 0.2 and 0.4mg/L at pH 7.7 and 10°C, has been used for disinfection experiments with faecal streptococci. A 99.99% reduction of Enterococcus faecium was observed between 3.4–5.2min (0.05mg/L), between 2.8–4.1min (0.1mg/L), between 1.7–3.1min (0.2mg/L) and between 0.8–2.1min (0.4mg/L). CT-products covered a range of 0.17 (0.05mg/L, lower limit) up to 0.85mg/L/min (0.4mg/L, upper limit). The test system is suggested as a more reliable alternative to batch experiments when the disinfection potential of low chlorine concentrations acting for several minutes has to be evaluated. The system cannot be used to demonstrate exact reduction kinetics but it allows the calculation of CT values and the evaluation of the disinfection potential of chlorinated water at any point of a distribution system where initial chlorine concentrations may have already remarkably declined.



Electronics ◽  
2021 ◽  
Vol 10 (2) ◽  
pp. 172
Author(s):  
Sunny Katyara ◽  
Muhammad Fawad Shaikh ◽  
Shoaib Shaikh ◽  
Zahid Hussain Khand ◽  
Lukasz Staszewski ◽  
...  

With the rising load demand and power losses, the equipment in the utility network often operates close to its marginal limits, creating a dire need for the installation of new Distributed Generators (DGs). Their proper placement is one of the prerequisites for fully achieving the benefits; otherwise, this may result in the worsening of their performance. This could even lead to further deterioration if an effective Energy Management System (EMS) is not installed. Firstly, addressing these issues, this research exploits a Genetic Algorithm (GA) for the proper placement of new DGs in a distribution system. This approach is based on the system losses, voltage profiles, and phase angle jump variations. Secondly, the energy management models are designed using a fuzzy inference system. The models are then analyzed under heavy loading and fault conditions. This research is conducted on a six bus radial test system in a simulated environment together with a real-time Power Hardware-In-the-Loop (PHIL) setup. It is concluded that the optimal placement of a 3.33 MVA synchronous DG is near the load center, and the robustness of the proposed EMS is proven by mitigating the distinct contingencies within the approximately 2.5 cycles of the operating period.



Author(s):  
Blaine M. Wruck ◽  
Erdem Coleri ◽  
Richard Villarreal ◽  
Vikas Kumar ◽  
James Batti

In light of the various quality assurance (QA) issues pertaining to tack coats that occur during construction, there is a need for a means of verifying interlayer bond quality in situ. Despite the immense use of tack coat as a constituent in paving, there are no construction specifications with provisions for the quantification of tack coat bond quality in laboratory or field settings. In this study, a construction QA process for tack coat bond performance was proposed. A novel field tack coat bond strength test device, TackBond, was developed and used for this purpose. The performance of engineered (new tack coat technologies that are tracking less) and conventional tack coats was also evaluated in the laboratory and the field using the developed TackBond test system. The TackBond device was improved in this study by adding features that render it more practical, portable, accurate, and better suited for a variety of pavement surface conditions. Engineered tack coat performance was compared with that of tack coats used conventionally on both milled and overlay surface types. The suitability of the TackBond Test device for capturing the true response of each tack coat was first evaluated by comparing results from TackBond laboratory tests with monotonic direct shear tests (DST) on laboratory-produced samples. Strong correlations between the two test types were achieved. Results of field and laboratory TackBond tests showed that the in situ QA control process developed in this study could be effectively used to improve the in situ tack coat bond performance.



Energies ◽  
2018 ◽  
Vol 11 (9) ◽  
pp. 2482 ◽  
Author(s):  
Goran Jurišić ◽  
Juraj Havelka ◽  
Tomislav Capuder ◽  
Stjepan Sučić

Visions of energy transition focus on activating end users, meaning that numerous flexible-distribution network-level devices become active participants in power-system operations. This implies a fast, reliable, and secure exchange of data, enabling the distribution-system operators to maintain, or even improve, the quality and delivery of service. With the introduction of the International Electrotechnical Commission (IEC) 61850 standard, the path is set for a single communication topology covering all substation levels. The standard has the potential to change the way substations are designed, built, tested, and maintained. This means that the key segment of the substation, its protection system, will go through a transition period with the end goal of having a digitized substation where all information exchange is performed over an Ethernet communication bus. This paper analyzes the performance impact of the IEC 61850-9-2LE on the protection system. To do this, a laboratory hardware-in-the-loop test setup was developed representing traditional-, hybrid-, and digital-substation topology. The setup serves to simulate faults and create transient waveforms in an extended IEEE 123-node test system, which is then used to detect the reaction times of protection relay devices. To verify the results, a significant number of tests was performed clearly showing the benefits of digitalizing the distribution system.



2021 ◽  
Vol 39 (4) ◽  
pp. 1198-1205
Author(s):  
J.N. Nweke ◽  
A.G. Gusau ◽  
L.M. Isah

A stable and reliable electric power supply system is a pre-requisite for the technological and economic growth of any nation. Nigeria's power supply has been experiencing incessant power interruptions caused by a failure in the distribution system. This paper developed a system planning approach as part of the key mitigation strategies for improved reliability and protection of the distribution network. The developed algorithm is tested using 33kV feeder supplying electricity to Kaura-Namoda, Zamfara State,  Nigeria. A customer-based reliability index was used as a tool to evaluate the reliability assessment of the feeder test system. The result showed that alternative 3 gives better results in terms of improvement of the system average interruption duration index (SAIDI), which in turn gives the minimum interrupted energy. Also, it is found that a greater number of sectionalizing switches do not give better results. It is very important to place the sectionalizing switches at a strategic location. If it is located at such points that will facilitate to sectionalize the faulty sections faster and to make the supply available to the unfaulty part of the network. Hence the utility company should apply this mitigation algorithm for system reliability improvement, depending on their needs and requirements. Thus, utilities can optimize network performance and better serve customers by adopting mitigation strategies in addressing trouble-prone areas to achieve a stable and reliable supply Keywords: distribution system; reliability; reliability indices; system performance evaluation; protection system; mitigation algorithms and sectionalizing switches 



2018 ◽  
Vol 1 (2) ◽  
Author(s):  
Dalila M.S. ◽  
Zaris I.M.Y. ◽  
Nasarudin A. ◽  
Faridah H.

This paper purposely to examine and analyse the impact of the distribution capacitors banks operation to the transition of total harmonic distortion (THD) level in distribution network system. The main advantage of this work is the simplicity algorithm of the method and the system being analysed using free access open software which is known as electric power distribution system simulator (OpenDSS). In this paper, the harmonic current spectrum which is collected from the commercial site was injected to a node point on IEEE13 bus in order to provide the initial measurement of THD for the network. The proper sizing of the capacitors banks has been set and being deactivated and activated throughout the network to see the transistion in the THD level in the system. The results were achieved by simulation of the data on the configured IEEE13 bus. The simulation work was done by using the combination of C++ source codes, OpenDSS and Microsoft Excel software. From the output results, the THD current has increased up to two times from the initial value in certain phases and for the THD voltage, the THD has increased up to three times from its initial value in all phases.



Sign in / Sign up

Export Citation Format

Share Document