“Virtual” Signal Integrity Test on Shielded/Unshielded Twisted-Wire Pairs Using the Bulk Current Injection Setup
Keyword(s):
2020 ◽
Vol 13
(6)
◽
pp. 14-16
Keyword(s):
2013 ◽
Vol 55
(6)
◽
pp. 1293-1301
◽
Keyword(s):
Keyword(s):