Effect of Buoyancy and Inertia on Viscoplastic Fluid-Fluid Displacement in an Eccentric Annulus With an Irregular Section: Part 2 — Displacements in Vertical Annulus

Author(s):  
Hans Joakim Skadsem ◽  
Steinar Kragset

Abstract Casing strings and liners are important subsurface structural components in petroleum and in geothermal wells. After the casing string has been run in hole, it is cemented to the formation by pumping a sequence of spacer fluids and cement slurry into the annulus outside the string. Spacer fluids are usually pumped ahead of the cement slurry in order to displace the drilling fluid from the annulus that is to be cemented, and thereby avoid contamination of the cement slurry. Fluid displacements are governed by inertia, buoyancy and viscosity effects, in addition to being strongly influenced by the annular geometry. Poor centralization of the casing or irregularities such as washouts can influence the displacement flows both locally and over long axial distances. We present three dimensional numerical simulations of the displacement flow involving two viscoplastic fluids in the vicinity of a symmetric local hole enlargement. We focus on laminar flow regimes in the regular part of the annulus and investigate how the volumetric flow rate and the mass density difference between the fluids affect the displacement efficiency in the regular and the irregular parts of the annulus. This study considers viscoplastic displacement flows in a near-vertical, irregular annulus and is an extension of a previous publication that focused on a near-horizontal annulus. We contextualize our simulations by comparison to industry guidelines for effective and steady laminar displacements in the regular, near-vertical annulus. Here, eccentricity favors flow in the wider sector of the annulus while a positive density difference between the fluids generates secondary, azimuthal flow toward the narrow side of the annulus. In the enlarged and irregular section, both the axial bulk velocity and casing eccentricity decrease sharply and buoyancy becomes more pronounced compared to in the regular annulus. We quantify and discuss the effects of local hole enlargements on displacement efficiencies. Simulations of cementing flows can aid in optimizing fluid properties and pump rates, including when the wellbore has suspected or confirmed zones of irregular geometries.

2020 ◽  
Vol 143 (6) ◽  
Author(s):  
Hans Joakim Skadsem ◽  
Steinar Kragset

Abstract Casing strings and liners are important subsurface structural components in petroleum and in geothermal wells. After the casing string has been run in hole, it is cemented to the formation by pumping a sequence of spacer fluids and cement slurry into the annulus outside the string. Spacer fluids are usually pumped ahead of the cement slurry to displace the drilling fluid from the annulus that is to be cemented and thereby avoid contamination of the cement slurry. Fluid displacements are governed by inertia, buoyancy, and viscosity effects, in addition to being strongly influenced by the annular geometry. Poor centralization of the casing or irregularities such as washouts can influence the displacement flows both locally and over long axial distances. We present three-dimensional numerical simulations of the displacement flow involving two viscoplastic fluids in the vicinity of a symmetric local hole enlargement. We focus on laminar flow regimes in the regular part of the annulus and investigate how the volumetric flowrate and the mass density difference between the fluids affect the displacement efficiency in the regular and the irregular parts of the annulus. This study considers viscoplastic displacement flows in a near-vertical, irregular annulus and is an extension of a previous publication that focused on a near-horizontal annulus. We contextualize our simulations by comparison to industry guidelines for effective and steady laminar displacements in the regular, near-vertical annulus. Here, eccentricity favors flow in the wider sector of the annulus, while a positive density difference between the fluids generates secondary, azimuthal flow toward the narrow side of the annulus. In the enlarged and irregular section, both the axial bulk velocity and casing eccentricity decrease sharply and buoyancy becomes more pronounced compared to in the regular annulus. We quantify and discuss the effects of local hole enlargements on displacement efficiencies. Simulations of cementing flows can aid in optimizing fluid properties and pump rates, including when the wellbore has suspected or confirmed zones of irregular geometries.


Author(s):  
Steinar Kragset ◽  
Hans Joakim Skadsem

Primary cementing is an important well construction process that should establish well control barriers and zonal isolation. Critical for primary cementing is the successful displacement of drilling fluid from the annulus between casing and formation by a sequence of spacer fluids and cement slurry. Failure to displace the drilling fluid may compromise the annular cement integrity and result in contaminated cement with degraded mechanical properties. Issues such as eccentricity, washouts and other geometric irregularities in the wellbore can complicate the displacement processes, and their effect on the quality of the cementing job and the final result is linked to uncertainty. We present numerical simulations of the displacement process between two viscoplastic fluids in the vicinity of a symmetric local hole enlargement. The study is limited to laminar flow regimes in the regular part of the annulus, and we focus on a near-horizontal section with significant eccentricity and small annular clearance. We vary the volumetric flow rate and the mass density difference between the fluids, and study how the irregularity affects the displacement efficiency and the presence of residual fluid in and after the irregularity. In the regular part of the geometry, eccentricity favors flow in the wider, upper part of the annulus, while density difference leads to azimuthal flow from the top to the low side of the annulus. The results support the assumption that increasing the mass density difference improves the displacement efficiency. In the laminar regime, lower flow rates can be favorable over higher ones in terms of efficiency measured as a function of volume that is pumped into the enlarged section. Displacement of drilling fluids for primary cementing is a rich flow problem involving different non-Newtonian fluids and possibly irregular geometry. Simulations of the displacement process can aid in optimizing fluid properties and injection rates for primary cementing operations, and assist cement log interpretation after the operation.


2021 ◽  
Author(s):  
Ahmedagha Hamidzada ◽  
Ahmed Rashed Alaleeli ◽  
Azza El Hassan ◽  
Fatima Bin Tarsh ◽  
Islam Abdelkarim

Abstract Cementing a highly deviated production liner is associated with cement placement challenge that can compromise zonal isolation. A major operator in UAE, was facing a challenge to cement 4 ½ in slim production liner set at + 5000 ft off-bottom. The corresponding 6 in. section was drilled with a relatively high mud weight in the range of 12 to 13 PPG. One of the main challenge was the risk of solids settling on the low side of the wellbore, making mud displacement difficult to achieve while cementing. Additionally, cementing off-bottom without an ECP in a highly deviated wellbore with multiple exposed production zones, further increased cement placement complexity. A holistic engineering approach was integrated to ensure successful zonal isolation. Wellbore parameters and fluid properties were critically evaluated. To overcome off-bottom cementing and prevent slurry fallback risks, a weighted high viscosity pill with high yield point was placed as a temporary basement to support the cement column and isolate the reservoir during 4 ½ in liner job. After placement of the pill, the wellbore was observed for flow checks to ensure stable downhole conditions prior to displacing the drilling fluid across the liner interval to brine within the same density. A centralization program was implemented to achieve more than 70% stand-off which required a minimum centralization pattern of two rigid centralizers per joint which helped minimize the presence of mud channels on the narrow side. Effective mud removal was ensured through implementation of a spacer train in front of the cement. The first spacer was pumped with same mud density to reduce ECD followed by another advanced low invasion loss circulation spacer to mitigate losses as well as provide a sustained downhole rheology. A resilient, expandable and gas tight cement slurry, was selected to target long-term zonal isolation. Multiple hydraulic simulations were performed to optimize ECDs and ensure safe margins during placement A CFD (computational fluid dynamics) model was utilized to simulate hydraulics, expected mud removal and fluids inter-mixing especially during liner rotation. In addition, the model simulated high-calculated torques based on flow restrictions through liner hanger assembly. Lack of mechanical liner movement was compensated by additional pre-job circulation to fully condition the wellbore. The job was executed with no losses during cementing, and spacer and cement returns were received on the surface during reverse out. Utilizing the best engineering approach, practices, and techniques from this job is implemented in the future wells as the production of the well is directly affected by the cement quality. Post job cement integrity evaluation via a cement bond log confirmed excellent bonding of cement to the liner and reservoirs across the entire open-hole interval.


2015 ◽  
Vol 8 (1) ◽  
pp. 149-154 ◽  
Author(s):  
Jun Gu ◽  
Ju Huang ◽  
Su Zhang ◽  
Xinzhong Hu ◽  
Hangxiang Gao ◽  
...  

The purpose of this study is to improve the cementing quality of shale gas well by mud cake solidification, as well as to provide the better annular isolation for its hydraulic fracturing development. Based on the self-established experimental method and API RP 10, the effects of mud cake solidifiers on the shear strength at cement-interlayer interface (SSCFI) were evaluated. After curing for 3, 7, 15 and 30 days, SSCFI was remarkably improved by 629.03%, 222.37%, 241.43% and 273.33%, respectively, compared with the original technology. Moreover, the compatibility among the mud cake solidifier, cement slurry, drilling fluid and prepad fluid meets the safety requirements for cementing operation. An application example in a shale gas well (Yuanye HF-1) was also presented. The high quality ratio of cementing quality is 93.49% of the whole well section, while the unqualified ratio of adjacent well (Yuanba 9) is 84.46%. Moreover, the cementing quality of six gas-bearing reservoirs is high. This paper also discussed the mechanism of mud cake solidification. The reactions among H3AlO42- and H3SiO4- from alkali-dissolved reaction, Na+ and H3SiO4- in the mud cake solidifiers, and Ca2+ and OH- from cement slurry form the natrolite and calcium silicate hydrate (C-S-H) with different silicate-calcium ratio. Based on these, SSCFI and cementing quality were improved.


2012 ◽  
Vol 450-451 ◽  
pp. 1536-1539
Author(s):  
Cui Ping Nie ◽  
Deng Sheng Ye

Abstract: Usually we pay more attention on how to improve gas well cementing quality in engineering design and field operations, and there are so many studies on cement agents but few researches on cement slurry injection technology. The field practice proved that conventional cementing technology can not ensure the cementing quality especially in gas well and some abnormal pressure wells. Most of the study is concentrated on cement agents and some cementing aspects such as wellbore condition, casing centralization etc. All the factors analysis on cementing quality has pointed out that a combination of good agents and suitable measurements can improve cementing quality effectively. The essential factor in cementing is to enhance the displacement efficiency, but normal hole condition and casing centralization are the fundamental for cementing only. Pulsing cementing is the technology that it can improve the displacement efficiency especially in reservoir well interval, also it can shorten the period from initial to ultimate setting time for cement slurry or improve thickening characteristics, and then to inhibit the potential gas or water channeling. Based on systematically research, aiming at improving in 7″ liner cementing, where there are multi gas reservoirs in long interval in SiChuan special gas field, well was completed with upper 7″ liner and down lower 5″ liner, poor cementing bonding before this time. So we stressed on the study of a downhole low frequency self-excited hydraulic oscillation pulsing cementing drillable device and its application, its successful field utilization proved that it is an innovative tool, and it can improve cementing quality obviously.


2021 ◽  
Author(s):  
Hongtao Liu ◽  
Zhengqing Ai ◽  
Jingcheng Zhang ◽  
Zhongtao Yuan ◽  
Jianguo Zeng ◽  
...  

Abstract The average porosity and permeability in the developed clastic rock reservoir in Tarim oilfield in China is 22.16% and 689.85×10-3 μm2. The isolation layer thickness between water layer and oil layer is less than 2 meters. The pressure of oil layer is 0.99 g/cm3, and the pressure of bottom water layer is 1.22 g/cm3, the pressure difference between them is as bigger as 12 to 23 MPa. It is difficult to achieve the layer isolation between the water layer and oil layer. To solve the zonal isolation difficulty and reduce permeable loss risk in clastic reservoir with high porosity and permeability, matrix anti-invasion additive, self-innovate plugging ability material of slurry, self-healing slurry, open-hole packer outside the casing, design and control technology of cement slurry performance, optimizing casing centralizer location technology and displacement with high pump rate has been developed and successfully applied. The results show that: First, the additive with physical and chemical crosslinking structure matrix anti-invasion is developed. The additive has the characteristics of anti-dilution, low thixotropy, low water loss and short transition, and can seal the water layer quickly. Second, the plugging material in the slurry has a better plugging performance and could reduce the permeability of artificial core by 70-80% in the testing evaluation. Third, the self-healing cement slurry system can quickly seal the fracture and prevent the fluid from flowing, and can ensuring the long-term effective sealing of the reservoir. Fourth, By strict control of the thickening time (operation time) and consistency (20-25 Bc), the cement slurry can realize zonal isolation quickly, which has achieved the purpose of quickly sealing off the water layer and reduced the risk of permeable loss. And the casing centralizers are used to ensure that the standoff ratio of oil and water layer is above 67%. The displacement with high pump rate (2 m3/min, to ensure the annular return velocity more than 1.2 m/s) can efficiently clean the wellbore by diluting the drilling fluid and washing the mud cake, and can improve the displacement efficiency. The cementing technology has been successfully applied in 100 wells in Tarim Oilfield. The qualification rate and high quality rate is 87.9% and 69% in 2019, and achieve zone isolation. No water has been produced after the oil testing and the water content has decreased to 7% after production. With the cementing technology, we have improved zonal isolation, increased the crude oil production and increased the benefit of oil.


2015 ◽  
Vol 2 (4) ◽  
pp. 354-359 ◽  
Author(s):  
Youzhi Zheng ◽  
Chaoyi She ◽  
Kunquan Yao ◽  
Xiaoyang Guo ◽  
Huali Zhang ◽  
...  

Author(s):  
Soheil Akbari ◽  
Seyed Mohammad Taghavi

Abstract Plug and abandonment (P&A) of oil and gas wells is an essential process to prevent the oil and gas reservoir fluids migration over time and possibly contaminating other formations and also fresh water resources. In order to plug and abandon a well, a high quality cement plug placement is required. One of the most common methods of cement plug placement is the dump bailing method. In this method, a fixed volume of cement is dumped using a bailer on a mechanical plug in the wellbore. The cement slurry occupies the wellbore and also the annular region outside the dump bailer. In the processes of cement slurry placement, an extensive range of Newtonian or non-Newtonian fluids is used to remove the in-situ fluid (drilling fluid or water) in the wellbore. Based on the large number of parameters such as the density and viscosity differences between the fluids, the geometry type (pipe, annulus, etc.), the operation conditions (velocity, geometry inclination, dumping height), various kinds of placement and mixing flows can occur, and different flow regimes (e.g. inertial, viscous) can develop. In this paper, we experimentally study the placement of a heavy fluid to replace an in-situ light fluid in an inclined closed-end pipe (representative of the dump bailing method). The two fluids are Newtonian and miscible, and they have the same viscosity. We investigate the effects of some of the flow parameters such as the dumping height, the pipe inclination, and the inflow velocity of the heavy fluid on the degree of mixing and the placement quality and efficiency. Our results show that the the most efficient displacement happens with the shortest dumping height and at lower inclination from vertical. Also, a high inflow velocity displaces the light fluid promptly with more mixing in comparison with a low inflow rate. The results can help us to develop strategies for improving the dump bailing method in the P&A of the oil and gas wells.


Energies ◽  
2020 ◽  
Vol 13 (18) ◽  
pp. 4683
Author(s):  
Elayne A. Araújo ◽  
Thaine T. Caminha ◽  
Evanice M. Paiva ◽  
Raphael R. Silva ◽  
Júlio Cézar O. Freitas ◽  
...  

Oil well cleanup fluids (pre-flushes) are intermediate fluids pumped ahead of the cement slurry; they are able to clean the well walls by removing the filter cake formed by the drilling fluid, and leave the surface water-wet. This work’s main objective was to use biodegradable microemulsion systems as cleanup fluids in order to reduce the environmental impact. Three microemulsion systems were formulated, each composed of an oil phase, a surfactant and three different aqueous phases: glycerol, glycerol:water (mass ratio 1:1), and fresh water. The results show that all microemulsion systems were effective with 100% filter cake removal, with a removal time of less than 60 s. The wettability test and fluid compatibility analyses exhibited advantageous performances, without phase separation, variations in viscosity, gelation, or flocculation. The compressive strength and X-ray diffractometry (XRD) analysis showed the influence of the glycerol on the cement slurry properties, with the compressive strength resistance ranging from 8.0 to 10.7 MPa, and resulted in the formation of portlandite.


2011 ◽  
Vol 295-297 ◽  
pp. 1811-1816
Author(s):  
Yang Zhang ◽  
Bin Bin Wang ◽  
Yi Xiao Wang

PID (Particle Impact Drilling) is a new drilling technology which has been developing in the near decades. Utilizing steel particles with high speed to impact the rock stratum, this technology could be used in hard terrane. Compared with ordinary drilling technologies, PID has many advantages, such as long service life, high drilling speed, and low duty cycle, etc. During the process of recycling and separating, the steel particles will inevitably encounter a part of loss. In order to keep the sum of steel particle and working efficiency, the loss rules should be intensively studied. Based on experimental studies, this paper mainly works on the screening efficiency under various conditions including volumetric flow rate of drilling fluid, viscosity and steel particle ratio, etc. It was found that the loss rate of steel particle would increase with the increasing volumetric flow rate, viscosity and steel particle ratio. Furthermore, dimensional analysis was employed to analysis the relationship between loss rate and these factors and one empirical formula was proposed.


Sign in / Sign up

Export Citation Format

Share Document