Optimization of Steam Extractions Mass Flowrate in Advanced Steam Power Plant With Using Combined Pinch and Exergy Analysis (CPEA)

Author(s):  
Adel Sefidi ◽  
Ardeshir Arash

Pinch technology has developed for thermodynamic analysis of chemical processes. This technology targets the most possible modification prior to detailed design. Pinch technology it is not sufficient in analyzing systems involving beat and power such as power plants. Exergy analysis, on the other hand, provides a powerful tool for heat and power analysis, although at times it does not provide clear practical design guideline. To prevailing over the weaknesses of both analysis, in obtaining a practical design guideline for the analysis of heat and power systems, combined pinch and exergy analysis (CPEA) is developed. This paper introduces the application of CPEA to advanced steam power plant. The paper presents a new methodology in optimization of steam extractions mass flowrate from multiple pressure levels of steam turbine with using CPEA. Efficiency improvement about 0.34% can be obtained by application of new approach and likewise, hot and cold utilities of cycle can be decreased.

1995 ◽  
Vol 117 (1) ◽  
pp. 47-52 ◽  
Author(s):  
V. R. Dhole ◽  
J. P. Zheng

Pinch technology has developed into a powerful tool for thermodynamic analysis of chemical processes and associated utilities, resulting in significant energy savings. Conventional pinch analysis identifies the most economical energy consumption in terms of heat loads and provides practical design guidelines to achieve this. However, in analyzing systems involving heat and power, for example, steam and gas turbines, etc., pure heat load analysis is insufficient. Exergy analysis, on the other hand, provides a tool for heat and power analysis, although at times it does not provide clear practical design guidelines. An appropriate combination of pinch and exergy analysis can provide practical methodology for the analysis of heat and power systems. The methodology has been successfully applied to refrigeration systems. This paper introduces the application of a combined pinch and exergy approach to commercial power plants with a demonstration example of a closed-cycle gas turbine (CCGT) system. Efficiency improvement of about 0.82 percent (50.2 to 51.02 percent) can be obtained by application of the new approach. More importantly, the approach can be used as an analysis and screening tool for the various design improvements and is generally applicable to any commercial power generation facility.


ijd-demos ◽  
2020 ◽  
Vol 2 (2) ◽  
Author(s):  
Nida Urrohmah ◽  
Karin Caroline Kelly ◽  
Fitri Yuliani

Electric Steam Power Plants (PLTU) need coal as fuel to produce electricity. The higher the electrical energy needed to eat, the more fuel will be used. This has happened in the construction of shelters 9 and 10 Suralaya Merak-Banten steam power plant (PLTU). This development is reaping various kinds of rejection because it causes environmental damage not only in the area around the development operation but also in the Greater Jakarta area. The rejection movement was initiated by local residents and supported by international Environmental NGOs.Pembangkit Listrik Tenaga Uap (PLTU) membutuhkan batu bara sebagai bahan bakar untuk menghasilkan energi listrik. Semakin tinggi energi listrik yang dibutuhkan makan akan semakin banyak bahan bakar yang digunakan. Hal ini terjadi pada pembangunan shelter 9 dan 10 PLTU Suralaya di pulau Jawa spesifiknya di daerah Merak-Banten. Pembangunan ini menuai berbagai macam penolakan karena mengakibatkan kerusakan lingkungan tidak hanya pada wilayah sekitar operasi pembangunan namun juga pada wilayah Jabodetabek. Gerakan penolakan diinisiasi tentunya oleh warga setempat dan didukung dengan NGO Internasional penggiat isu lingkungan. 


2019 ◽  
Vol 125 ◽  
pp. 13003
Author(s):  
MSK. Tony Suryo U ◽  
Eflita Yohana ◽  
Syarif Dwi Priyanto ◽  
Ignatius Apryando M. ◽  
Tauviqirrahman

Steam power plant Generation of Tanjung Jati B 3rd unit has a capacity of 660 MW. The power plant operational in 2011, because of the long operation process, there will be a decrease in performance. The plant needs to be researched to analyze the performance and losses that occurs in the power plant. Because this also affects the environment if the efficiency of the power plant is high, it can reduce the use of coal. Because coal becomes air pollution and environmental pollution, which can cause acid rain, water pollution, and global warming. This research is used to analyze energy and exergy on the components of a steam power plant. From the results of this research, the largest of destruction exergy boiler is 881.08 MW and the exergetic efficiency is 48.66%. While the rate of the smallest destruction exergy in LPH 3 is 0.6 MW and the exergetic efficiency is 94.45%. The contribution of the largest Losses energy in the boiler is 231 MW and energetic efficiency is 87.05%. While the contribution of the smallest energy Losses in HPH 6 is 0.74 MW and energetic efficiency is 99.23%.


Author(s):  
R. Chacartegui ◽  
D. Sa´nchez ◽  
J. A. Becerra ◽  
A. Mun˜oz ◽  
T. Sa´nchez

In this work, a tool to predict the performance of fossil fuel steam power plants under variable operating conditions or under maintenance operations has been developed. This tool is based on the Spencer-Cotton-Cannon method for large steam turbine generator units. The tool has been validated by comparing the predicted results at different loads with real operating data of a 565 MW steam power plant, located in Southern Spain. The results obtained from the model show a good agreement with most of the power plant parameters. The simulation tool has been then used to predict the performance of a steam power plant in different operating conditions such as variable terminal temperature difference or drain cooler approach of the feed-water heaters, or under maintenance conditions like a feed-water heater out of service.


JTAM ROTARY ◽  
2020 ◽  
Vol 2 (1) ◽  
pp. 65
Author(s):  
Andhika Bayu Oktavianto ◽  
Mastiadi Tamjidillah

Salah satu pembangkit listrik di Indonesia adalah pembangkit listrik Asam Asam yang terletak di dekat mulut tambang batubara. Setiap pembangkit listrik membutuhkan sejumlah besar air sebagai fluida kerja atau sebagai air pendingin. Pembangkit Listrik Tenaga Uap Asam Asam Batubara menggunakan air sungai sebagai air pendingin dengan mesin pendingin sebagai mesinnya. Pada bulan September 2017, menara pendingin unit 2B dari PLTU Asam Asam Batubara mengalami kegagalan operasi karena spacer rusak dan membuat PLTU Asam Asam Batubara mengalami penurunan dan kerugian lainnya. Tim teknik mendiagnosis kasus tersebut karena ketidakselarasan. Berdasarkan uraian akar penyebab masalah, ada tiga masalah utama yang mungkin terjadi yaitu: misalignment, unbalance, dan rotasi gearbox berat. Misalignment adalah pemicu utama untuk serangkaian masalah yang menyebabkan kegagalan operasi menara pendingin. Maka perlu mempelajari masalah utama yang menyebabkan kegagalan operasi menara pendingin untuk ditindaklanjuti dengan pemeliharaan preventif sesuai dengan kondisi saat ini untuk mencegah kegagalan yang serupa di unit 2B dan unit serupa lainnya. One of the power plants in Indonesia is the Asam Asam power plant located near the mouth of the coal mine. Each power plant requires large amounts of water as a working fluid or as a cooling water. Asam Asam Coal Fired Steam Power Plant uses river water as a cooling water with the cooling towers as its engine. In September 2017, the cooling tower unit 2B of Asam Asam Coal Fired Steam Power Plant experienced an operation failure because of the spacer was broken and made the Asam Asam Coal Fired Steam Power Plant to experience derating and other losses. The engineering team diagnoses the case due to misalignment. Based on the description of the root causes of the problem, there are three main problems that might occur namely : misalignment, unbalance, and heavy gearbox rotation. Misalignment is the main trigger for a series of problems causing failure of cooling tower operations. Then it is necessary to study the main problems causing the failure of the cooling tower operation to be followed up with preventive maintenance in accordance with the current conditions to prevent similar failures in unit 2B and other similar units.


Sign in / Sign up

Export Citation Format

Share Document