Benchmarking Probabilistic Code for LBB Analysis for Circumferential Cracks

Author(s):  
Robert E. Kurth ◽  
Cédric J. Sallaberry ◽  
Bruce A. Young ◽  
Paul Scott ◽  
Frederick W. Brust ◽  
...  

NRC Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to assess compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. There are several codes available for addressing the requirements of GDC-4. This paper addresses three of these codes: (1) xLPR 2.0; (2) PROLOCA; and (3) PROMETHEUS. Each of these codes is described and applied to a representative plant where active degradation mechanisms have been found. Conclusions about the design, results, and interpretation of the results is then provided. In all cases the probability of failure of the pipe is found to be extremely low when the crack inspections and leak detection systems are modeled.

Author(s):  
D. Rudland ◽  
C. Harrington

Nuclear Regulatory Commission (NRC) Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to demonstrate compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. Along with a series of existing qualitative steps to assure safety in LBB-approved lines experiencing PWSCC, NRC staff, working cooperatively with the nuclear industry through a memorandum of understanding with the Electric Power Research Institute, is developing a new, modular based, comprehensive piping system assessment methodology to directly demonstrate compliance with the regulations. This project, called xLPR (eXtremely Low Probability of Rupture), will model the effects and uncertainties of relevant active degradation mechanisms and the associated mitigation activities. The resulting analytical tool will be comprehensive, vetted with respect to the technical bases of models and inputs, flexible enough to permit analysis of a variety of in-service situations and adaptable such as to accommodate evolving and improving knowledge. A multi-year project has begun that will first focus on the development of a viable method and approach to address the effects of PWSCC as well as define the requirements necessary for a modular-based assessment tool. To meet this goal, the first version of this code has been developed as part of a pilot study, which leverages existing fracture mechanics based models and software coupled to both a commercial and an open source code framework to determine the framework and architecture requirements appropriate for building a modular-based code with this complexity. The pilot study focused on PWSCC in pressurizer surge nozzles, and is meant to demonstrate the feasibility of this code and approach and not to determine the absolute values of the probability of rupture. Later development phases will broaden the scope of xLPR to appropriate primary piping systems in pressurized and boiling water reactors (PWR and BWR), using an incremental approach that incorporates the design requirements and lessons learned from previous iterations. This paper specifically examines the xLPR Version 1.0 model, the methods and approach used to couple the deterministic modules within a probabilistic software framework, and the results from the pilot study. A comparison of the results specific to the surge nozzle sample problem is presented. This paper concludes with lessons learned from the pilot study.


Author(s):  
D. Rudland ◽  
P. Mattie ◽  
R. Kurth ◽  
H. Klasky ◽  
B. Bishop ◽  
...  

The Nuclear Regulatory Commission (NRC) Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to demonstrate compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB exemptions. Along with the existing qualitative steps to assuring safety in LBB lines with PWSCC, the NRC staff, working cooperatively with the nuclear industry through a memorandum of understanding, is developing a new, modular based, comprehensive piping system assessment methodology to directly demonstrate compliance with the regulations. This tool, called xLPR (eXtremely Low Probability of Rupture), would properly model the effects and uncertainties of both active degradation mechanisms and the associated mitigation activities. The tool will be comprehensive with respect to known challenges, vetted with respect to scientific adequacy of models and inputs, flexible enough to permit analysis of a variety of in-service situations and adaptable such as to accommodate evolving and improving knowledge. A multi-year project has begun that will first focus on the development of a viable method and approach to address the effects of PWSCC as well as define the requirements necessary for a modular-based assessment tool. A prototype xLPR model and pilot study case is first being conducted leveraging existing fracture mechanics models and software coupled to both a commercial and open source code framework to determine the framework and architecture requirements appropriate for building a modular-based code with this complexity. The pilot study phase is focusing on PWSCC in pressurizer surge nozzles. Later development phases will broaden the scope of xLPR to all primary piping systems in pressurized and boiling water reactors (PWR and BWR), using an incremental approach that incorporates the design requirements and lessons learned from previous iterations. This paper specifically examines the prototype xLPR model and includes the methods and approach used to couple existing models and software as modules within a probabilistic software framework. Since the pilot study is currently still ongoing, this paper provides a discussion of the current status and plans to move forward after the pilot study is complete.


Author(s):  
Robert E. Kurth ◽  
Cédric J. Sallaberry ◽  
Frederick W. Brust ◽  
Elizabeth A. Kurth ◽  
Michael L. Benson ◽  
...  

NRC Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to assess compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. US NRC staff, working cooperatively with the Electric Power Research Institute through a memorandum of understanding, conducted a multi-year project that focused on the development of a viable method and approach to address the effects of PWSCC in primary piping systems approved for LBB. This project, called eXtremely Low Probability of Rupture (xLPR) [1], defined the requirements necessary for a modular-based probabilistic fracture mechanics assessment tool to directly assess compliance with the regulations. Using the lessons learned from the pilot study, the production version of this code, designated as Version 2.0, focused on those primary piping systems previously approved for LBB. In this version the appropriate fracture mechanics-based models are employed to model the physical cracking behavior and a variety of computational options are provided to characterize, categorize and propagate problem uncertainties. One of the most influential uncertainty on risk in the xLPR code is the one associated with weld residual stresses (WRS). WRS plays a key role in both crack initiation and crack growth. PWSCC is mainly driven by tensile stresses, whose major contributors are the tensile weld residual stresses that develop during fabrication of the piping system. Handling the uncertainty involved with WRS within a probabilistic framework is quite challenging. A companion paper presents the selected approach to represent uncertainty within the framework of the xLPR code while respecting a set of requirements in term of smoothness of profile, efficiency of (potential) importance sampling and (for axial WRS) equilibrium. This paper illustrate with examples the implementation of the described methods into xLPR v2.0.


Author(s):  
Patrick G. Heasler ◽  
Scott E. Sanborn ◽  
Steven R. Doctor ◽  
Michael T. Anderson

The U.S. Nuclear Regulatory Commission (NRC) in cooperation with the nuclear industry is constructing an improved probabilistic fracture model for piping systems that in the past have not been susceptible to known degradation processes that could lead to pipe rupture. Recent operating experience with primary water stress corrosion cracking (PWSCC) has challenged this prior position of leak-before-break and which has now become known as “extremely Low Probability of Rupture” (xLPR). This paper focuses on the xLPR model’s treatment of uncertainty for in-service inspection. In the xLPR model, uncertainty is classified as either aleatory or epistemic, and both types of uncertainty are described with probability distributions. Earlier PFM models included aleatory, but ignored epistemic, uncertainty, or attempted to deal with epistemic uncertainty by use of conservative bounds. Thus, inclusion of both types of uncertainty in xLPR should produce more realistic results than the earlier models. This work shows that by including epistemic uncertainty in the xLPR ISI module, there can be a significant effect on rupture probability; however, this depends upon the specific scenarios being studied. Some simple scenarios are presented to illustrate those where there is no effect and those having a significant effect on the probability of rupture.


Author(s):  
D. Rudland ◽  
C. Harrington

NRC Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to assess compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. Along with a series of existing qualitative steps to assure safety in LBB-approved lines experiencing PWSCC, NRC staff, working cooperatively with the Electric Power Research Institute through a memorandum of understanding, is developing a new, modular based, comprehensive piping system assessment methodology to directly assess compliance with the regulations. This project, called eXtremely Low Probability of Rupture (xLPR), will model the effects and uncertainties of relevant active degradation mechanisms and the associated mitigation activities. The resulting analytical tool will be comprehensive with respect to known and significant materials challenges (PWSCC, etc.), vetted with respect to the technical bases of models and inputs, flexible enough to permit analysis of a variety of in-service situations and adaptable such as to accommodate evolving and improving knowledge. A multi-year project has begun that has been focused on the development of a viable method and approach to address the effects of PWSCC as well as define the requirements necessary for such a modular-based assessment tool. As reported in a previous paper, the first version of this code was developed as part of a pilot study, which leveraged existing fracture mechanics based models and software coupled to both a commercial and open source code framework to determine the framework and architecture requirements appropriate for building a modular-based code with this complexity. The pilot study focused on PWSCC in pressurizer surge nozzles, and was meant to demonstrate the feasibility of this code and approach and not to determine the absolute values of the probability of rupture. This paper examines the plans for the xLPR Version 2.0 model which will broaden the scope of xLPR to all LBB-approved primary piping in pressurized water reactors (PWR), using an incremental approach that incorporates the design requirements and lessons learned from previous iterations. After a review of the Version 1.0 final results, this paper will document the plans for Version 2.0 including the revised management structure, the technical scope, and the progress in the code development effort to date.


Author(s):  
D. Rudland ◽  
C. Harrington ◽  
R. Dingreville

NRC Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to assess compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. US NRC staff, working cooperatively with the Electric Power Research Institute through a memorandum of understanding, conducted a multi-year project that focused on the development of a viable method and approach to address the effects of PWSCC in primary piping systems approved for LBB. This project, called eXtremely Low Probability of Rupture (xLPR), defined the requirements necessary for a modular-based probabilistic fracture mechanics assessment tool to directly assess compliance with the regulations. As reported in previous technical papers, the first version of the xLPR code was developed as part of a pilot study, which leveraged existing fracture mechanics based models and software coupled to both a commercial and open source code framework to determine the framework and architecture requirements appropriate for building a modular-based code with this complexity. Using the lessons learned from the pilot study, the production version of this code, designated as Version 2.0, focuses on those primary piping systems previously approved for LBB. In this version, the appropriate fracture mechanics-based models are employed to model the physical cracking behavior and a variety of computational options are provided to characterize, categorize and propagate problem uncertainties. This paper examines the xLPR Version 2.0 model by presenting a brief overview of the xLPR scope, the code structure, computational framework and fracture mechanics-based models. As a demonstration of the xLPR Version 2.0 capabilities, an example is presented that focuses on PWSCC in large-bore piping systems. This example exercises some functionalities of the xLPR code to demonstrate its application to assess compliance with 10CFR50 Appendix A, GDC-4. This paper concludes with a brief discussion on the path forward and plans for the control and maintenance of the xLPR code.


Author(s):  
Robert E. Kurth ◽  
Cédric J. Sallaberry ◽  
Frederick W. Brust ◽  
Elizabeth A. Kurth ◽  
Michael L. Benson ◽  
...  

NRC Standard Review Plan (SRP) 3.6.3 describes Leak-Before-Break (LBB) assessment procedures that can be used to assess compliance with the 10CFR50 Appendix A, GDC-4 requirement that primary system pressure piping exhibit an extremely low probability of rupture. SRP 3.6.3 does not allow for assessment of piping systems with active degradation mechanisms, such as Primary Water Stress Corrosion Cracking (PWSCC) which is currently occurring in systems that have been granted LBB approvals. US NRC staff, working cooperatively with the Electric Power Research Institute through a memorandum of understanding, conducted a multi-year project that focused on the development of a viable method and approach to address the effects of PWSCC in primary piping systems approved for LBB. This project, called eXtremely Low Probability of Rupture (xLPR), defined the requirements necessary for a modular-based probabilistic fracture mechanics assessment tool to directly assess compliance with the regulations [1]. Using the lessons learned from the pilot study [2] the production version of this code, designated as Version 2.0, focused on those primary piping systems previously approved for LBB [3]. In this version the appropriate fracture mechanics-based models are employed to model the physical cracking behavior and a variety of computational options are provided to characterize, categorize and propagate problem uncertainties. One of the most influential sources of uncertainty on risk in the xLPR code is the one associated with weld residual stresses (WRS). WRS plays a key role in both crack initiation and crack growth. PWSCC is mainly driven by tensile stresses, whose major contributors are the tensile weld residual stresses that develop during fabrication of the piping system. Handling the uncertainty involved with WRS within a probabilistic framework is quite challenging. This paper presents the selected approach to represent uncertainty within the framework of the xLPR code while respecting a set of requirements in term of smoothness of profile, efficiency of (potential) importance sampling and (for axial WRS) equilibrium. The current WRS sampling scheme employs correlation in order to smooth the shape of the WRS fields through the thickness of a dissimilar metal weld. This method presents an enrichment of the Cholesky decomposition on the correlation matrix, in order to satisfy the other two requirements.


Author(s):  
Eric M. Focht ◽  
Guy DeBoo

The U.S. Nuclear Regulatory Commission (NRC) and the Electric Power Research Institute (EPRI) entered into a cooperative agreement to develop a modular computer code for determining the probability of rupture of reactor coolant pressure boundary piping. The goal of xLPR project (Extremely Low Probability of Rupture), as it is known, is to develop a flexible modular code that satisfies the assessment methodology in the NRC Standard Review Plan (SRP) 3.6.3 leak-before-break analysis. The NRC SRP 3.6.3 provides guidance on satisfying Title 10 of the Code of Federal Regulations Part 50 (10 CFR Part 50) Appendix A, General Design Criteria 4 that requires primary system pressure piping to exhibit an extremely low probability of rupture. The initial phase of the xLPR project is the Pilot Study where the base structure of the code will be developed and tested on a known case. The Pilot Study version of the xLPR code consists of an alpha version where proxy modules and inputs are used and a beta version where the state-of-the art modules and inputs are used. This paper will discuss the input parameters used for the alpha xLPR code.