Discussion of “Field study of pile – prefabricated vertical drain (PVD) interaction in soft clay”

2021 ◽  
pp. 1-1 ◽  
Author(s):  
Gholamreza Mesri
2015 ◽  
Vol 773-774 ◽  
pp. 1502-1507
Author(s):  
Saiful Azhar Ahmad Tajudin ◽  
Mohd Fairus Yusof ◽  
I. Bakar ◽  
Aminaton Marto ◽  
Muhammad Nizam Zakaria ◽  
...  

Construction, buildings and infrastructure founded on soft clays are often affected by settlement problem. Therefore, Prefabricated Vertical Drain (PVD) is one of the best solutions to accelerate soil consolidation by shortening the drainage path. In this study, numerical investigation was carried out to pursue a better understanding of the consolidation behavior of soft clay improved with PVD. The consolidation process accelerated by PVD with surcharge of 50 kPa was analysed using the ABAQUS software by adopting an elastic model. The aim of this study is to compare the settlement and the required time to fully consolidate the soft soil at different drain spacings (1.0 m, 1.5 m and 2.0 m) for two different thickness of the clay layer. The results shows that the time required to completely consolidate the soft soil for 12 m and 20 m thickness of clay layer with different spacings are in the range of 3 months to 66 months. The settlement rate and excess pore water pressure dissipation are increased when the spacing of the drain closer.


2016 ◽  
Vol 10 (1) ◽  
pp. 41-50
Author(s):  
Wimpie Agoeng Noegroho Aspara ◽  
Eka Nur Fitriani

AbstractIf a structure for reasons of technical, economic, social, or startegic is to be built on a soft ground, then there are usually two problems to be solved, namely the low geotechnical bearing capacity and large soil deformation with sometimes differential settlement. Pre-compression is a foundation soil compression process with the provision of temporary loading (preloading) before actually constructing a building. Pre-fabricated vertical drain is a synthetic drainage system installed vertically inside soft soil layers. Soil condition at the project activity is a relatively very soft clay soil with relatively high coefficient of consolidation resulting in very long period of consolidation process. Therefore, it is needed advance soil improvement by prealoding of pre-fabricated vertical drain. Spacings of installed PVD vary, those are 50 cm, 100 cm, 150 cm, and 200 cm with a pattern of triangles and rectangles. Based on the analytical calculation, it is resulted that optimum PVD distance to achieve 90% consolidation is 150 cm with a triangular pattern. The time of consolidation was achieved within four months. AbstrakKetika suatu struktur karena alasan-alasan teknis, ekonomi, sosial, atau strategis terpaksa didirikan di atas tanah lunak, maka biasanya ada dua masalah geoteknik yang harus dipecahkan yaitu daya dukung yang rendah dan penurunan serta beda penurunan yang besar. Prakompresi adalah suatu proses pemampatan tanah pondasi dengan jalan pemberian pembebanan sementara (prabeban/preloading) sebelum konstruksi yang sesungguhnya didirikan. Prefabricated vertical drain (PVD) adalah sistem drainase buatan yang dipasang vertikal di dalam lapisan tanah lunak. Kondisi tanah di lokasi kegiatan relatif sangat lunak dengan koefisien konsolidasi relatif sangat tinggi mengakibatkan proses konsolidasi berjalan relatif sangat lama. Untuk itu diperlukan perbaikan tanah terlebih dahulu dengan prealoading menggunakan PVD. Jarak spasi antar PVD yang dipasang bervaiasi yaitu 50 cm, 100 cm, 150 cm, dan 200 cm dengan pola konfigurasi segitiga dan segiempat. Berdasarkan hasil perhitungan secara analitis didapatkan jarak optimum PVD untuk mencapai konsolidasi 90% adalah 150 cm dengan pola segitiga dengan proses konsolidasi dicapai selama waktu penurunan 4 bulan.


2021 ◽  
pp. 1-42
Author(s):  
Y. Zhou ◽  
H. Yang ◽  
P. Wang ◽  
X. T. Yang ◽  
F. Xu

The horizontal strain in the vacuum preloading/dewatering of dredged slurry is significant to the apparent clogging effect and estimation of surface settlement around a drain; however, it has seldom been investigated in previous studies. In this study, a vacuum consolidation model test assisted with the particle image velocimetry (PIV) technology was conducted. The displacement vector field was obtained through PIV analysis and image processing; it was used to visually observe the deformation features around a drain. Based on the displacement field, the vertical/horizontal strains at varied radial distances were calculated to explain the “soil pile” and apparent clogging effect. From the strain distribution with radial distances, a significant lateral compression zone near the drain and an extension zone at farther areas were confirmed. Furthermore, a simple explicit model was established to evaluate the horizontal strain within a prefabricated vertical drain unit cell considering a horizontal attenuated vacuum and compression/extension zone. Finally, this method was applied to predict the horizontal displacement in the model test. The results showed that the proposed method can estimate the lateral displacement of soft clay slurry fairly well.


2013 ◽  
Vol 7 (2) ◽  
pp. 177
Author(s):  
Muhammad Amin Fahmi

The improvement project was carried out within 30 work days with the project price of IDR 551.439.500,-. In the project management a project planning is in need a carry out the project on time at precise cost and quality. The data needed in this arrangement of project planning were contract documents, list of work force cost, equipment and materials used. Work scheduling and cost arrangement for the project was done with benefit of Microsoft Project Program. The writer discusses the determination of project site layout, traffic management, implementation method, project time schedule, project cost planning, project quality management planning as well as K3 program planning. From the calculating result, the writer summed that the total cost was Rp. 270.950.000.-. When this sum compared to the previous project cost planning was Rp. 551.439.500,- we can difference as much as Rp. 280.489.500.-. In order to assure the working quality, material testing was conducted in laboratory so that the material mounted matched the technical qualifications as well as the use if correct implementation method. To avoid work accident, every worker must use the Self Protection Device and work carefully by the correct working procedures. Keywords:  Vertical Drain, Soft Clay, Project Planning


2020 ◽  
Vol 3 (4) ◽  
pp. 1137
Author(s):  
Christian Eka Putra ◽  
Chaidir Anwar Makarim

The existence of soft soil is one of the problems in the field of construction. Soft soil is soil that has high water content and low carrying capacity. In the case of this toll road, soil investigation at the site shows that the subgrade in the toll road planning is soft clay soil to a depth of 32 meters so that soil improvement is needed. High landfill built on soft subgrade without reinforcement will experience landslides. So it is necessary to strengthen the landfill and repair the subgrade to prevent road slides. The soil improvement methods in use are vacuum preloading and Prefabricated Vertical Drain with the vacuum functioning as an additional load. In addition to accelerating the consolidation process, the vacuum can also reduce the height of the embankment needed to achieve the desired planned road elevation. Strengthening with geotextile is also carried out on the landfill with a height of 5.94 meters so that there is no landslide on the fill. Using soil improvement methods such as vacuum preloading and prefabricated vertical drain will increase the bearing capacity of the soil so that differences in bearing capacity occur before and after repair. AbstrakKeberadaan tanah lunak menjadi salah satu masalah dalam bidang konstruksi. Tanah lunak adalah tanah yang memiliki kadar air yang tinggi dan daya dukung yang rendah. Pada kasus jalan tol ini, penyelidikan tanah di lokasi menunjukan bahwa tanah dasar pada perencanaan jalan tol merupakan tanah lempung lunak hingga kedalaman 32 meter sehingga dibutuhkan perbaikan tanah dasar. Timbunan tinggi yang dibangun di atas tanah dasar lunak tanpa perkuatan akan mengalami kelongsoran. Sehingga diperlukan perkuatan timbunan dan perbaikan tanah dasar untuk mencegah kelongsoran jalan. Metode perbaikan tanah yang digunakan adalah vacuum preloading dan Prefabricated Vertical Drain dengan vacuum berfungsi sebagai beban tambahan. Selain mempercepat proses penurunan, vacuum juga dapat mengurangi tinggi timbunan yang dibutuhkan untuk mencapai elevasi jalan rencana yang diinginkan. Perkuatan dengan geotextile juga dilakukan pada timbunan dengan tinggi yang mencapai 5.94 meter supaya tidak terjadi kelongsoran pada timbunan tersebut. Dengan menggunakan metode perbaikan tanah berupa vacuum preloading dan prefabricated vertical drain akan meningkatkan daya dukung tanah sehingga akan diketahui perbedaan daya dukung yang terjadi sebelum dan sesudah diperbaiki.


2020 ◽  
Vol 2020 ◽  
pp. 1-9
Author(s):  
Yunliang Cui ◽  
Jianbo Tu ◽  
Xinquan Wang ◽  
Hongguo Diao ◽  
Qianru Ge

The design method of electroosmosis-vacuum preloading for soft foundation treatment is not systematic and complete, thereby restricting the application of the technology in engineering. A design method for the electroosmosis-vacuum preloading treatment of sand-interlayered soft foundation is therefore presented. A compressible electrical prefabricated vertical drain is developed, and a vacuum sealing and draining system is designed for the application of the electroosmosis-vacuum preloading in sand-interlayered soft foundation. Calculation formulas of site resistance considering the interlayer and interface resistivity of the electrode are established to design the power supply and electrical circuit. A simple numerical simulation method is proposed to predict the ground settlement treated by electroosmosis-vacuum preloading. A field test of electroosmosis-vacuum preloading is designed using the suggested method, and comparison tests between the electroosmosis-vacuum preloading and the vacuum preloading are performed to verify the proposed technique. The test results show that the proposed design method is reasonable for the design of electroosmosis-vacuum preloading in engineering.