Science and the industrial planning process in the western Canadian boreal forest: a case study

2008 ◽  
Vol 7 (Supplement 1) ◽  
pp. 1-12 ◽  
Author(s):  
Jonathan S. Russell ◽  
Daniel W. Smith ◽  
Gordon Putz ◽  
Ellie E. Prepas
2006 ◽  
Vol 36 (9) ◽  
pp. 2341-2350 ◽  
Author(s):  
Sylvain Jutras ◽  
Hannu Hökkä ◽  
Jean Bégin ◽  
André P Plamondon

In boreal forest, drainage can be successfully used to lower the water-table level of postharvest forested peatland stands suffering from watering-up. The later vegetation revival and growth is suspected to gradually create a water-table drawdown described in this study as biological drainage. Its effect on the annual stump diameter increment of planted eastern larch (Larix laricina (Du Roi) K. Koch) and naturally regenerated black spruce (Picea mariana (Mill.) BSP) was studied on a postharvested and drained forested peatland located in eastern part of the Canadian boreal forest. A factor describing the neighbourhood occupancy of every subject tree was used to illustrate biological drainage in a retrospective growth analysis. Results showed the dual effect of the neighbourhood occupancy factor: competing situations close to the ditch and growth-favouring situations farther from it. In the latter case, the studied trees demonstrated better growth with moderately increasing neighbourhood occupancy. This was interpreted as evidence of the beneficial effect of biological drainage on tree growth. The presence of speckled alder (Alnus incana subsp.rugosa (Du Roi) J. Clausen) in the neighbourhood of selected trees corresponded to improved growth for both studied species.


2017 ◽  
Vol 1 (1) ◽  
pp. 1-16
Author(s):  
John Harner ◽  
Lee Cerveny ◽  
Rebecca Gronewold

Natural resource managers need up-to-date information about how people interact with public lands and the meanings these places hold for use in planning and decision-making. This case study explains the use of public participatory Geographic Information System (GIS) to generate and analyze spatial patterns of the uses and values people hold for the Browns Canyon National Monument in Colorado. Participants drew on maps and answered questions at both live community meetings and online sessions to develop a series of maps showing detailed responses to different types of resource uses and landscape values. Results can be disaggregated by interaction types, different meaningful values, respondent characteristics, seasonality, or frequency of visit. The study was a test for the Bureau of Land Management and US Forest Service, who jointly manage the monument as they prepare their land management plan. If the information generated is as helpful throughout the entire planning process as initial responses seem, this protocol could become a component of the Bureau’s planning tool kit.


Author(s):  
Seiichi Kagaya ◽  
Tetsuya Wada

AbstractIn recent years, it has become popular for some of countries and regions to adapt the system of governance to varied and complex issues concerned with regional development and the environment. Watershed management is possibly the best example of this. It involves flood control, water use management and river environment simultaneously. Therefore, comprehensive watershed-based management should be aimed at balancing those aims. The objectives of this study are to introduce the notion of environmental governance into the planning process, to establish a method for assessing the alternatives and to develop a procedure for determining the most appropriate plan for environmental governance. The planning process here is based on strategic environment assessment (SEA). To verify the hypothetical approach, the middle river basin in the Tokachi River, Japan was selected as a case study. In practice, after workshop discussions, it was found to have the appropriate degree of consensus based on the balance of flood control and environmental protection in the watershed.


2020 ◽  
Vol 7 (1) ◽  
Author(s):  
Anna Maria Colavitti ◽  
Sergio Serra

Abstract In Europe, the debate on the recovery of the historic centres has been developed, over the years, around the balance between conservation and transformation needs in order to meet the new demands of the contemporary world. In the field of urban planning, the strictly conservative and binding approach has gradually been supported by flexible and consensual mechanisms that act as a stimulus to private initiative in the redevelopment and regeneration of the historic urban landscape. The consolidated Italian experience in the policies for the protection and enhancement of historical settlements is being significantly innovated after the entry into force of the Urbani Code, which extends the character of landscape heritage to the historic urban fabric, transferring to the regional authorities the task of establishing the specific regulations for its use and transformation. The Region of Sardinia has achieved an important role in the implementation of policies for the recovery and redevelopment of the historic centres identified by the Regional Landscape Plan (RLP). The common and consolidated practice is still characterized by the use of traditional regulative instruments, in particular the detailed plan, which provide rules for the requalification of the compromised urban fabrics through a set of rules and guidelines to be applied to the replacement of recent buildings and the renovation of urban patterns that for density, ratios between solids and voids, heights, alignments and elevations are incompatible with the values of the context. The constraint and binding approach is effective in the conservation strategies but often inadequate to implement actions of integrated redevelopment of urban fabric altered by new buildings in contrast with the historic urban landscape features, also due to the global crisis situation and the shortage of public funding. The paper proposes the use of the non-financial compensation tool, based on the granting of bonus development rights to realising on site or in alternative locations, in order to encourage urban regeneration projects that also involve the replacement of buildings incompatible with historical urban landscape morphological patterns. The integration of a methodology for assessing the financial feasibility of the demolition and reconstruction of the incompatible structures in the planning process, as tested in the case study of Villasor municipality, has allowed the elaboration of a model to support the use of a compensation mechanism for the redevelopment of historical settlement values. In this perspective, the paper aims to investigate the opportunities provided by market-oriented and flexible approaches to support and promote private urban regeneration projects. In particular, it illustrates the experimental results of a methodology for the analysis of the urban fabric that takes into account the factors influencing the feasibility of the intervention of demolition and reconstruction of the incompatible buildings. Finally a model for the assessment of any bonus in terms of additional building capacity is suggested, to be granted to private operators as an incentive to ensure the cost-effectiveness of the project.


2021 ◽  
Vol 13 (3) ◽  
pp. 1514
Author(s):  
Rebecca Peters ◽  
Jürgen Berlekamp ◽  
Ana Lucía ◽  
Vittoria Stefani ◽  
Klement Tockner ◽  
...  

Mitigating climate change, while human population and economy are growing globally, requires a bold shift to renewable energy sources. Among renewables, hydropower is currently the most economic and efficient technique. However, due to a lack of impact assessments at the catchment scale in the planning process, the construction of hydropower plants (HPP) may have unexpected ecological, socioeconomic, and political ramifications in the short and in the long term. The Vjosa River, draining parts of Northern Greece and Albania, is one of the few predominantly free-flowing rivers left in Europe; at the same time its catchment is identified an important resource for future hydropower development. While current hydropower plants are located along tributaries, planned HPP would highly impact the free-flowing main stem. Taking the Vjosa catchment as a case study, the aim of this study was to develop a transferable impact assessment that ranks potential hydropower sites according to their projected impacts on a catchment scale. Therefore, we integrated established ecological, social, and economic indicators for all HPP planned in the river catchment, while considering their capacity, and developed a ranking method based on impact categories. For the Vjosa catchment, ten hydropower sites were ranked as very harmful to the environment as well as to society. A sensitivity analysis revealed that this ranking is dependent upon the selection of indicators. Small HPP showed higher cumulative impacts than large HPP, when normalized to capacity. This study empowers decision-makers to compare both the ranked impacts and the generated energy of planned dam projects at the catchment scale.


Sign in / Sign up

Export Citation Format

Share Document