scholarly journals Surface Subsidence Prediction Method for Coal Mines with Ultrathick and Hard Stratum

2019 ◽  
Vol 2019 ◽  
pp. 1-15 ◽  
Author(s):  
Hongkai Han ◽  
Jialin Xu ◽  
Xiaozhen Wang ◽  
Jianlin Xie ◽  
Yantuan Xing

Overburden conditions consisting of ultrathick and hard stratum (UTHS) are widespread in China and other countries, but existing surface subsidence prediction methods ignore the strong impact of UTHS on surface subsidence. They are thus not applicable for surface subsidence prediction for coal mining with the presence of UTHS. We conducted actual measurements of surface and UTHS subsidence in the Tingnan Coal Mine. The results showed that under the UTHS mining condition, the required gob dimension is much larger than the empirical value when the surface reaches sufficient mining and that the actual measured maximum value of surface subsidence is much smaller than the empirical value. The UTHS subsidence is approximately equal to the surface subsidence. The movement of UTHS has a strong impact on surface subsidence and has a controlling function for it. It was proposed that surface subsidence could be approximately predicted by calculating the UTHS subsidence. The UTHS movement characteristics were studied using Winkler’s theory of beams on an elastic foundation, the subsidence prediction equation of the main sections in the strike and dip directions was obtained under different mining dimensions, and the subsidence prediction equation of any arbitrary cross section parallel to the two main sections was established. Then, the surface subsidence prediction method for coal mining with the presence of UTHS was developed, and the influences of UTHS thickness, strength, and layer position on the surface subsidence were discussed. The Tingnan Coal Mine was taken as an example, and the subsidence curves of the strike and dip main sections were calculated using different mining dimensions. Subsequently, the surface subsidence after the mining of working faces 204, 205, 206, and 207, respectively, was predicted, and the prediction method was verified by comparing the results with the measured surface subsidence results of working faces 204, 205, and 206.

2019 ◽  
Vol 11 (7) ◽  
pp. 2118 ◽  
Author(s):  
Qiang Zhang ◽  
Jixiong Zhang ◽  
Zhongya Wu ◽  
Yang Chen

China is the world’s largest coal producer country. However, large-scale coal mining has led to severe environmental pollution issues such as surface subsidence and gangue piling up. The gangue discharging amount has ranked the first in the world and coal mine enterprises are facing enormous discharging reduction pressure. This paper summarizes the research progress of the solid backfilling mining technology and then illustrates the realistic demands and significance of implementing underground coal-waste separation. It also focuses on the technical principles, systems and key equipment of the common underground coal-waste separation methods, such as the selective crushing method, the dense medium shallow groove method, the vibro-assisted jigging method and full-size water separation method and ray identification method. In addition, the selection steps of underground coal-waste separation method, the design process of large section separation chamber and the design principle of separation and backfilling system are proposed, finally, the mining-separating-backfilling + X for coal mining is put forward. By combining the technology of mining-separating-backfilling with other technologies, such as gob-side entry retaining with non-pillar mining, gas extraction, solid waste treatment, water protection mining, mining under buildings, railways and water bodies, the integrated mining methods, mining-separating-backfilling + setting pillars, gas drainage, treatment, protection and prevention methods are formed. It also introduced the ‘mining-separating-backfilling + gas extraction’ technology’s whole idea, system arrangement, separation equipment and practical engineering application effects based on the specific engineering case of pingmei no. 12 coal mine. The results indicate that the integration of underground coal-waste separation and solid backfilling technology could achieve gangue discharging reduction, underground washing and surface subsidence control. It is effective at realizing green mining.


2021 ◽  
Vol 2021 ◽  
pp. 1-14
Author(s):  
Zhiyong Fu ◽  
Lujie Zhou ◽  
Kai Yu ◽  
Wanzhen Li ◽  
Hu Chen

In order to predict the surface subsidence scientifically in solid filling mining, it is necessary to establish a complete subsidence prediction model and parameter system according to the evolution law of overburden structure and strata movement characteristics. Mine pressure monitoring and borehole peeping show that the overburden in solid filling mining is mainly a bending zone with relatively complete layered structure, and the overburden only develops a certain height of fault zone near the roof, without collapse. The results show that the surface subsidence pattern of solid filling mining can still be described by probability integral model, and the parameter system of the surface subsidence prediction model based on “equivalent mining height” is further discussed. Finally, the prediction model of surface subsidence established in this paper is applied to an engineering example, and good results are achieved.


Energies ◽  
2021 ◽  
Vol 14 (3) ◽  
pp. 562
Author(s):  
Marek Jendryś ◽  
Andrzej Hadam ◽  
Mateusz Ćwiękała

The following article analyzes the effectiveness of directional hydraulic fracturing (DHF) as a method of rock burst prevention, used in black coal mining with a longwall system. In order to define changes in seismic activity due to DHF at the “Rydułtowy” Black Coal Mine (Upper Silesia, Poland), observations were made regarding the seismic activity of the rock mass during coal mining with a longwall system using roof layers collapse. The seismic activity was recorded in the area of the longwall itself, where, on a part of the runway, the rock mass was expanded before the face of the wall by interrupting the continuity of the rock layers using DHF. The following article presents measurements in the form of the number and the shock energy in the area of the observed longwall, which took place before and after the use of DHF. The second part of the article unveils the results of numerical modeling using the discrete element method, allowing to track the formation of goafs for the variant that does not take DHF into consideration, as well as with modeled fractures tracing DHF carried out in accordance with the technology used at “Rydułtowy” coal mine.


2011 ◽  
Vol 39 (3) ◽  
pp. 219-225 ◽  
Author(s):  
Guo Donggan ◽  
Bai Zhongke ◽  
Shangguan Tieliang ◽  
Shao Hongbo ◽  
Qiu Wen

2014 ◽  
Vol 543-547 ◽  
pp. 3967-3973
Author(s):  
Bao Shan Han

There are abundant CBM (Coalbed Methane) in China. These CBM has caused a remarkable problem to the coal-mining in China. In order to improve the structure of Chinese energy and eliminate the risk of coal mine gas, the relevant industries and sections have implemented many explorations in CBM enriched areas. With great achievements, there are many important problems in the actions of CBM exploitation. The disadvantageous interaction of the surface CBM well and the later coal mining has been ignored at all. There are many disadvantages and defects. To solve these problems and eliminate or weaken the disadvantageous, the scientific and reasonable design of surface CBM well location is an important step. With the thinking of surface condition, coal mining plan, the arrangement of coal mine laneway, the direction and scale of the in-situ stress, and thinking more about the negative influence to and of surface CBM well, according to the theories of mining dynamics, mining engineering, mining geomechanics, and the CBM engineering, the design theory of the surface CBM well net can be studied. Finally, the arrangement principle of CBM product well in coal field is presented. The existing or future coal pillar will be a critical location for the surface CBM well location.


1980 ◽  
Vol 74 (3) ◽  
pp. 745-756 ◽  
Author(s):  
Michael S. Lewis-Beck ◽  
John R. Alford

With the 1970 passage of the Occupational Safety and Health Act (OSHA), federal regulation reached the American workplace. Given the newness of the legislation, any firm conclusion on its effectiveness seems premature. However, there is ample evidence on federal safety regulation of a specific workplace: the coal mine. The federal government has been directly involved in coal mining safety for over 35 years, operating under three major pieces of legislation, enacted in 1941, 1952, and 1969. Opposing opinions regarding the effect of this legislation can be grouped into three categories: radical, reactionary, and reformer. A multiple interrupted time-series analysis indicates that, in fact, the 1941 and 1969 regulations significantly reduced the fatality rate in coal mining. Certain conditions seem related to the effectiveness of this safety legislation: birth order, provisions, enforcement, target population, and goals. The first two conditions would appear to work for the success of the OSHA, the latter three conditions to work against it.


2013 ◽  
Vol 448-453 ◽  
pp. 823-829
Author(s):  
Hao Wang

By conducting field investigation and tests, such as groundwater pumping test and rock mechanics test, and building numerical models to simulate damage of coal mining to aquifers, it was proved that coal mining in some coal mine area caused impacts to groundwater environment, including impact on water cycle, the structure of aquifers, and groundwater flow field, as a result of which some water supply sources in coal mine area become unavailable. In addition, a couple of solutions are presented to mitigate the impacts.


Sign in / Sign up

Export Citation Format

Share Document