Comparison of scenarios for the integrated management of construction and demolition waste by life cycle assessment: A case study in Brazil

2016 ◽  
Vol 34 (10) ◽  
pp. 1026-1035 ◽  
Author(s):  
Carmenlucia Santos Giordano Penteado ◽  
Laís Peixoto Rosado
2021 ◽  
Vol 13 (17) ◽  
pp. 9625
Author(s):  
Ambroise Lachat ◽  
Konstantinos Mantalovas ◽  
Tiffany Desbois ◽  
Oumaya Yazoghli-Marzouk ◽  
Anne-Sophie Colas ◽  
...  

The demolition of buildings, apart from being energy intensive and disruptive, inevitably produces construction and demolition waste (C&Dw). Unfortunately, even today, the majority of this waste ends up underexploited and not considered as valuable resources to be re-circulated into a closed/open loop process under the umbrella of circular economy (CE). Considering the amount of virgin aggregates needed in civil engineering applications, C&Dw can act as sustainable catalyst towards the preservation of natural resources and the shift towards a CE. This study completes current research by presenting a life cycle inventory compilation and life cycle assessment case study of two buildings in France. The quantification of the end-of-life environmental impacts of the two buildings and subsequently the environmental impacts of recycled aggregates production from C&Dw was realized using the framework of life cycle assessment (LCA). The results indicate that the transport of waste, its treatment, and especially asbestos’ treatment are the most impactful phases. For example, in the case study of the first building, transport and treatment of waste reached 35% of the total impact for global warming. Careful, proactive, and strategic treatment, geolocation, and transport planning is recommended for the involved stakeholders and decision makers in order to ensure minimal sustainability implications during the implementation of CE approaches for C&Dw.


Materials ◽  
2021 ◽  
Vol 14 (18) ◽  
pp. 5452
Author(s):  
Adriana B. Dias ◽  
João N. Pacheco ◽  
José D. Silvestre ◽  
Isabel M. Martins ◽  
Jorge de Brito

The incorporation of recycled aggregates in concrete not only reduces the extraction of natural resources, but also decreases landfill disposal of construction and demolition waste. Hence, environmental impacts and costs are reduced, promoting the use of recycled aggregates and circular economy. However, the impacts of transport depend on the distance between facilities and longer distances may result in recycled aggregates being more costly and having larger environmental impact than natural aggregates. This paper discusses this topic, presents a review on the use of life cycle assessment methodology on natural and recycled aggregates for concrete, and applies this methodology in a real context pertaining the procurement of coarse aggregates to ready-mix concrete plants. A case study of two Portuguese regions, Coimbra and Lisbon, is presented. For each region, a quarry, a construction and demolition waste plant, and a ready-mix concrete plant are chosen and a comparative life cycle assessment is made. Different scenarios for the supply of natural and recycled aggregates are studied and the scenarios for recycled aggregates procurement include different hypotheses for the installation (construction and demolition waste plant or quarry) processing the construction and demolition waste into recycled aggregates. For this case study and both regions, it was found that the supply of recycled aggregates produced at the construction and demolition waste plant has lower environmental impact and cost than all other scenarios, including the provision of natural aggregates, except when it is assumed that the quarry is licensed and equipped for receiving unsorted construction and demolition waste and processing it into recycled aggregates. The paper shows that transport distance is a determining factor in the comparison of the impacts of the procurement of natural and recycled aggregates. Moreover, in the Portuguese context, the environmental impacts of the procurement of recycled aggregates may be smaller than those of natural aggregates, but cost may be larger for recycled aggregates, preventing that the most sustainable option is chosen.


2018 ◽  
Vol 8 (1) ◽  
pp. 8
Author(s):  
Nadia Qamar ◽  
Ayesha Alam Khurram

In Pakistan, construction and demolition waste(CDW) is generated in voluminous amount each year. CDW iswidely ill-handled and ultimately fed to landfills causing harm tothe already alarming environmental conditions. In order tosearch for the solution of this drastic matter, a study was done,which is explained in this paper. This paper presents the studydone at a demolition site near Karachi, in Sindh while thedemolition works were being carried out. At the site there wereold barracks which were being demolished. Before the demolitionworks were commenced, the site was surveyed and structuralcomponents of the barracks were counted and their dimensionswere measured. When the demolition was over, the demolishedwaste was calculated which comprised of concrete and masonryrubble, steel round bars, steel doors, steel windows, steel ceiling,steel girders, steel main gate, and plastic water tank. This studyinterpreted that construction and demolition (C&D) works wereprogressing considering the works’ deadline and the clients’requirements but the ecosystem’s ecology and the environmentalhealth were not taken into account. Recommendations are madeto handle CDW properly throughout its lifecycle. Theserecommendations aim to provide technological and logicalsolutions to grip CDW. The recommendations include wastereduction and reusing waste, life cycle assessment and costing,environmental and economic impact, material flow analysis, andadvanced computerized-tools.


2018 ◽  
Vol 1 (1) ◽  
pp. 8
Author(s):  
Nadia Qamar ◽  
Ayesha Alam Khurram

In Pakistan, construction and demolition waste(CDW) is generated in voluminous amount each year. CDW iswidely ill-handled and ultimately fed to landfills causing harm tothe already alarming environmental conditions. In order tosearch for the solution of this drastic matter, a study was done,which is explained in this paper. This paper presents the studydone at a demolition site near Karachi, in Sindh while thedemolition works were being carried out. At the site there wereold barracks which were being demolished. Before the demolitionworks were commenced, the site was surveyed and structuralcomponents of the barracks were counted and their dimensionswere measured. When the demolition was over, the demolishedwaste was calculated which comprised of concrete and masonryrubble, steel round bars, steel doors, steel windows, steel ceiling,steel girders, steel main gate, and plastic water tank. This studyinterpreted that construction and demolition (C&D) works wereprogressing considering the works’ deadline and the clients’requirements but the ecosystem’s ecology and the environmentalhealth were not taken into account. Recommendations are madeto handle CDW properly throughout its lifecycle. Theserecommendations aim to provide technological and logicalsolutions to grip CDW. The recommendations include wastereduction and reusing waste, life cycle assessment and costing,environmental and economic impact, material flow analysis, andadvanced computerized-tools.


Sign in / Sign up

Export Citation Format

Share Document