BAHAMAS AIRBORNE MAGNETOMETER SURVEY
This paper presents some of the background prior to the actual survey, the functioning of the “Technical Committee” and its relationship to the contractors. A brief outline is also presented covering the various technical phases of the operation together with some of the inherent hazards of the area and how they were handled. A summary of recommended changes in equipment and procedure arising from the experience of this survey is given.
2020 ◽
Vol 140
(1)
◽
pp. 21-22
Keyword(s):
2016 ◽
Vol 136
(1)
◽
pp. 16-17
Keyword(s):
2021 ◽
Vol 18
(5)
◽
pp. 2278
2020 ◽
Vol 64
(1)
◽
pp. 400-404