A Study on the Construction Organization Scheme of the Provincial Boundary Toll Station in Fokai Expressway

2020 ◽  
Vol 09 (07) ◽  
pp. 674-680
Author(s):  
志婉 杨

The author analyzes the reasons that objectively reduce the importance and quality of the organizational and technological solutions of work production plans and the content of their main documents. Based on a generalization of practical experience, one of the real ways of increasing the level of work production plans is proposed as a result of the development of "The Unified Rules for Work Production on the Site" as part of the construction organization project, in the form of fundamental requirements, followed by the inclusion of this document in the work production plan as an input document. The structure and content of the Unified Rules are described with the disclosure of the main documents - calendar plans of work, construction master plans, technological schemes of works. The first section of the document contains requirements for the content of tasks for the development of the project of work execution, the order of its approval, and requirements for the quality of solutions. The second section presents principal solutions, methods of work execution and their technological schemes. The organizational and technological solutions adopted in the proposed document are specified and detailed by the General Contractor Construction Organization with due regard for the resource capabilities and the actual conditions of construction or reconstruction.


In the article, the author considers the problems of complex algorithmization and systematization of approaches to optimizing the work plans of construction organizations (calendar plans) using various modern tools, including, for example, evolutionary algorithms for "conscious" enumeration of options for solving a target function from an array of possible constraints for a given nomenclature. Various typical schemes for modeling the processes of distribution of labor resources between objects of the production program are given, taking into account the array of source data. This data includes the possibility of using the material and technical supply base (delivery, storage, packaging) as a temporary container for placing the labor resource in case of released capacity, quantitative and qualification composition of the initial labor resource, the properties of the construction organization as a counterparty in the contract system with the customer of construction and installation works etc. A conceptual algorithm is formed that is the basis of the software package for operational harmonization of the production program ( work plans) in accordance with the loading of production units, the released capacities of labor resources and other conditions stipulated by the model. The application of the proposed algorithm is most convenient for a set of objects, which determines the relevance of its implementation in optimization models when planning production programs of building organizations that contain several objects distributed over a time scale.


Author(s):  
V.V. Verna

The article provides a rationale for methodological approaches to assessing the effectiveness of outsourcing in organizations of the construction industry using the example of outsourcing schemes to perform personnel functions. The conditional example shows the impact of the use of outsourcing on reducing the costs of a construction organization. The main prerequisites for the use of outsourcing in the activities of enterprises in the construction industry are identified, methodological approaches to assessing the cost-effectiveness of personnel outsourcing in the construction industry enterprises are substantiated.


Sign in / Sign up

Export Citation Format

Share Document