scholarly journals Mooring Lines Reliability Analysis Case Study: Fso Abherka,

2021 ◽  
Vol 32 (1) ◽  
pp. 41
Author(s):  
Garry Raditya Putra ◽  
Daniel Mohammad Rosyid ◽  
Rudi Walujo Prastianto
Author(s):  
Jun-Xian Fu ◽  
Shukri Souri ◽  
James S. Harris

Abstract Temperature and humidity dependent reliability analysis was performed based on a case study involving an indicator printed-circuit board with surface-mounted multiple-die red, green and blue light-emitting diode chips. Reported intermittent failures were investigated and the root cause was attributed to a non-optimized reflow process that resulted in micro-cracks and delaminations within the molding resin of the chips.


Author(s):  
Oladimeji Joseph Ayamolowo ◽  
Chukwunonso Anthony Mmonyi ◽  
Samson Olasunkanmi Adigun ◽  
Olabisi Abdullahi Onifade ◽  
Kehinde Adetunji Adeniji ◽  
...  

2018 ◽  
Vol 58 (1) ◽  
pp. 72
Author(s):  
Sashi Gajula ◽  
Bertrand Peuchot

Decommissioning a producing asset within a low oil-price market scenario with a possibility of resuming production at a later stage is becoming a frequent task. The main objective of the offshore campaign is to release the floating production storage and off-loading unit (FPSO) at the earliest time by disconnecting all production risers, umbilical and mooring chains, and ensuring integrity of the subsea assets for future use. The entire project for the disconnection of this FPSO was managed in four phases. The first two phases were related to shutdown of production and FPSO clean-up. The FPSO readiness for disconnection was required before the final two phases: disconnection of risers and mooring lines. Detailed engineering was carried out in consultation with various stakeholders involved in the project: the regulator, the company, the FPSO owner and the installation contractor. Through feasibility studies, the best option was selected, which included innovative solutions to reduce overall offshore duration and project costs. The project was successfully completed by meeting the key objective of early departure of the FPSO without lost time injury or any significant environmental incidents.


2022 ◽  
Vol 166 ◽  
pp. 108812
Author(s):  
Vinay Kumar ◽  
Kailash Chandra Mishra ◽  
Pooja Singh ◽  
Aditya Narayan Hati ◽  
Mohan Rao Mamdikar ◽  
...  

2019 ◽  
Vol 16 (4) ◽  
pp. 762-771 ◽  
Author(s):  
Amol Mankar ◽  
Sima Rastayesh ◽  
John Dalsgaard Sørensen

Sign in / Sign up

Export Citation Format

Share Document