Selection of the appropriate composition desalination units can be done with a variety of method approaches, one of the method is the Analytic Hierarchy Process. In determining the desalination unit with AHP method to consider is setting a goal, an alternative criteria and pairwise comparison. Research for the determination of the exact composition of the desalination unit in order to achieve sustainable drinking water suppy in coastal areas and small islands has been conducted. The results of the study are as follows, the energy demand of 50.83%, operator costs of 26.64%, maintenance costs of 14.13% and chemical requirement 8.4%. For an alternative composition desalination unit of RO 10 m3 / day is the best alternative composition with value of 59.61%, the composition of the next alternative is RO 20 m3/ day of 30.40% and the last alternative of the desalination unit composition is RO 120 m3/ day of 09.99%.Key words : Desalination, Mukti Stage Flash Composition, AHP