scholarly journals Hydrodynamic forces on the valves of the transfer system of the third set of locks of the Panama Canal

Author(s):  
Claudio Fattor ◽  
Daniel Bacchiega ◽  
Santiago Arrigoni
2018 ◽  
Vol 30 (2) ◽  
pp. 241-251 ◽  
Author(s):  
Luis Carral ◽  
Javier Tarrio-Saavedra ◽  
Laura Castro-Santos ◽  
Isabel Lamas-Galdo ◽  
Rodolfo Sabonge

The Panama Canal (PC) expansion will have an impact on trading patterns and the manner in which goods are transported around the world. Once the third set of locks at the Canal began their operation, it was clear that the way in which vessels transited the canal and their maximum dimensions were going to change. As such, the expanded Canal will undoubtedly mean that a new kind of vessel will come into existence. In terms of dimensions, these Neopanamax ships will be adapted to how the locks operate. However, this effect will not be the same across the full range of traffic. After the first transit on 26 June 2016, it was possible to obtain access to transit data for Neopanamax ships. A thorough statistical study of these new datasets would involve analysing how these new locks impact the vessel size and seaborne transport.


2021 ◽  
Vol 284 ◽  
pp. 106036
Author(s):  
Mercedes Suárez ◽  
Emilia García-Romero ◽  
Ascensión Baz ◽  
Rafael Pérez

Author(s):  
Carlos Parra ◽  
Adolfo Crespo Márquez ◽  
Vicente González-Prida ◽  
Fredy A. Kristjanpoller ◽  
Pablo Viveros ◽  
...  

The purpose of this chapter, is to provide a Maintenance and Reliability Management Model for the project: Design and Construction of the Third Set of Locks in the Panama Canal, with the approach of the process of asset management optimization. A practical vision of the maintenance and reliability management process and framework is presented with the idea of: Structuring the maintenance management process by grouping management activities within a series of so-called management building blocks; Structuring the framework grouping techniques that can be used to support decisions to be taken within each of these building block. This chapter presents not only a process but also the framework and techniques to manage and improve maintenance and reliability effectiveness and efficiency. This report will be used to assist different plant teams to elaborate the optimal strategies for maintenance and inspection for the assets, specified for the project: Third Set of Locks in the Panama Canal.


2021 ◽  
Vol 6 (1) ◽  
Author(s):  
Kahuina Miller ◽  
Tetsuro Hyodo

AbstractThe expanded Panama Canal opened on June 26, 2016. This expansion is the third set of locks that enabled the canal to double its capacity through the addition of new traffic lanes, which allowed neo-Panamax and some post-Panamax vessels to transit across the canal. The widening of the canal has increased maritime traffic within Latin America and the Caribbean (LAC). Major ports in the regions have made huge investments in port expansion and infrastructural development to accommodate neo-Panamax vessels. In this study, we investigated the impact of the Panama Canal expansion (PCE) on the Latin America and the Caribbean (LAC) ports by using the Difference in Difference (DID) method. This impact was evaluated for 100 major and regular ports within the three sub-regions of LAC, namely Caribbean, Central, and South America, before and after the treatment effect, that is, the PCE. The findings from the model revealed that the average container port throughput (TEUs) for the treated ports (DTrp) was more than that of the controlled ports (CONTp) with transshipment hub, Central America, and South America having 20%, 12%, and 34% growth, respectively, since the PCE (the treatment) except for the Caribbean ports (DTrp), which experienced losses of 8% within the LAC region from 2010 to 2019.


2017 ◽  
Vol 2 (3) ◽  
pp. 247-260 ◽  
Author(s):  
Mariner Wang

Purpose The purpose of this study is to find out the future development of the Panama Canal after opening of the new waterway (third set of locks project), in terms of the change of cargo throughput, further deployment of fleets by the shipping companies and competition for the canal. Design/methodology/approach The research of this paper is based on an empiric study by collecting the relevant data from annual report of the Panama Canal Authority, publications related to the same field. Graphs pertaining to toll revenue also are made based on statistical data provided by the Panama Canal Authority. Findings The findings show that the opening of the new waterway of the Panama Canal generates more toll revenue for Panama government by allowing mega-vessels to transit, expediting further economic development of the country largely from behind. At the same time, shipping operators also can enjoy earning more revenue by deploying New Panamax vessels transiting the Canal. Originality/value Ingenuity in tabling the users of the Panama Canal by incorporating the logo marks of the shipping companies/implication is drawn through empirical analysis to provide the shipping companies and ports authorities concerned with more understanding toward the very significance of the new waterway expansion of the Panama Canal.