scholarly journals Models for Predicting Development Effort of Small-Scale Visualization Projects

2018 ◽  
Vol 27 (3) ◽  
pp. 413-431
Author(s):  
M.A. Jayaram ◽  
T.M. Kiran Kumar ◽  
H.V. Raghavendra

Abstract Software project effort estimation is one of the important aspects of software engineering. Researchers in this area are still striving hard to come out with the best predictive model that has befallen as a greatest challenge. In this work, the effort estimation for small-scale visualization projects all rendered on engineering, general science, and other allied areas developed by 60 postgraduate students in a supervised academic setting is modeled by three approaches, namely, linear regression, quadratic regression, and neural network. Seven unique parameters, namely, number of lines of code (LOC), new and change code (N&C), reuse code (R), cumulative grade point average (CGPA), cyclomatic complexity (CC), algorithmic complexity (AC), and function points (FP), which are considered to be influential in software development effort, are elicited along with actual effort. The three models are compared with respect to their prediction accuracy via the magnitude of error relative to the estimate (MER) for each project and also its mean MER (MMER) in all the projects in both the verification and validation phases. Evaluations of the models have shown MMER of 0.002, 0.006, and 0.009 during verification and 0.006, 0.002, and 0.002 during validation for the multiple linear regression, nonlinear regression, and neural network models, respectively. Thus, the marginal differences in the error estimates have indicated that the three models can be alternatively used for effort computation specific to visualization projects. Results have also suggested that parameters such as LOC, N&C, R, CC, and AC have a direct influence on effort prediction, whereas CGPA has an inverse relationship. FP seems to be neutral as far as visualization projects are concerned.

2022 ◽  
pp. 165-193
Author(s):  
Kamlesh Dutta ◽  
Varun Gupta ◽  
Vachik S. Dave

Prediction of software development is the key task for the effective management of any software industry. The accuracy and reliability of the prediction mechanisms used for the estimation of software development effort is also important. A series of experiments are conducted to gradually progress towards the improved accurate estimation of the software development effort. However, while conducting these experiments, it was found that the size of the training set was not sufficient to train a large and complex artificial neural network (ANN). To overcome the problem of the size of the available training data set, a novel multilayered architecture based on a neural network model is proposed. The accuracy of the proposed multi-layered model is assessed using different criteria, which proves the pre-eminence of the proposed model.


2019 ◽  
Vol 21 (2) ◽  
pp. 88-112
Author(s):  
Kamlesh Dutta ◽  
Varun Gupta ◽  
Vachik S. Dave

Prediction of software development is the key task for the effective management of any software industry. The accuracy and reliability of the prediction mechanisms used for the estimation of software development effort is also important. A series of experiments are conducted to gradually progress towards the improved accurate estimation of the software development effort. However, while conducting these experiments, it was found that the size of the training set was not sufficient to train a large and complex artificial neural network (ANN). To overcome the problem of the size of the available training data set, a novel multilayered architecture based on a neural network model is proposed. The accuracy of the proposed multi-layered model is assessed using different criteria, which proves the pre-eminence of the proposed model.


2021 ◽  
Vol 11 (3) ◽  
pp. 908
Author(s):  
Jie Zeng ◽  
Panagiotis G. Asteris ◽  
Anna P. Mamou ◽  
Ahmed Salih Mohammed ◽  
Emmanuil A. Golias ◽  
...  

Buried pipes are extensively used for oil transportation from offshore platforms. Under unfavorable loading combinations, the pipe’s uplift resistance may be exceeded, which may result in excessive deformations and significant disruptions. This paper presents findings from a series of small-scale tests performed on pipes buried in geogrid-reinforced sands, with the measured peak uplift resistance being used to calibrate advanced numerical models employing neural networks. Multilayer perceptron (MLP) and Radial Basis Function (RBF) primary structure types have been used to train two neural network models, which were then further developed using bagging and boosting ensemble techniques. Correlation coefficients in excess of 0.954 between the measured and predicted peak uplift resistance have been achieved. The results show that the design of pipelines can be significantly improved using the proposed novel, reliable and robust soft computing models.


Author(s):  
Fatih Yücalar ◽  
Deniz Kilinc ◽  
Emin Borandag ◽  
Akin Ozcift

Estimating the development effort of a software project in the early stages of the software life cycle is a significant task. Accurate estimates help project managers to overcome the problems regarding budget and time overruns. This paper proposes a new multiple linear regression analysis based effort estimation method, which has brought a different perspective to the software effort estimation methods and increased the success of software effort estimation processes. The proposed method is compared with standard Use Case Point (UCP) method, which is a well-known method in this area, and simple linear regression based effort estimation method developed by Nassif et al. In order to evaluate and compare the proposed method, the data of 10 software projects developed by four well-established software companies in Turkey were collected and datasets were created. When effort estimations obtained from datasets and actual efforts spent to complete the projects are compared with each other, it has been observed that the proposed method has higher effort estimation accuracy compared to the other methods.


Mathematics ◽  
2021 ◽  
Vol 9 (4) ◽  
pp. 356 ◽  
Author(s):  
Svajone Bekesiene ◽  
Ieva Meidute-Kavaliauskiene ◽  
Vaida Vasiliauskiene

This study considers the usage of multilinear regression and artificial neural network modelling to forecast ozone concentrations with regard to weather-related indicators (wind speed, wind direction, relative humidity and temperature). Initial data were obtained by measuring the meteorological parameters using the PC Radio Weather Station. Ozone concentrations near high-voltage lines were measured using RS1003 and at a 220 m distance using ML9811. Neural network models such as the multilayer perceptron and radial basis function neural networks were constructed. The prognostic capacities of the designed models were assessed by comparing the result data by way of the square of the coefficient of multiple correlations (R2) and mean square error (MSE) values. The number of hidden neurons was optimised by decreasing an error function that recorded the number of units in the hidden layers to the precision of the expanded networks. The neural software IBM SPSS 26v was used for artificial neural network (ANN) modelling. The study demonstrated that the linear regression modelling approach was lacking in its capacity to predict the investigated ozone concentrations by used parameters, whereas the use of an ANN offered more precise outcomes. The conducted tests’ results established the strength of the designed artificial neural network models with irrelevant differences between detected and forecasted data.