scholarly journals Influential Factors Affecting Materials Management in Construction Projects

2017 ◽  
Vol 8 (4) ◽  
pp. 82-90
Author(s):  
Zairra Mat Jusoh ◽  
Narimah Kasim

Abstract Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1) site condition; (2) planning and handling on site; (3) management; (4) materials; (5) supplier and manufacturer default; (6) transportation; (7) contractual; and (8) governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


Author(s):  
Abdul Qadir Memon ◽  
◽  
Aftab Hameed Memon ◽  
Mohsin Ali Soomro ◽  
◽  
...  

This paper assessed the occurrence and severity level of various factors causing time and cost overrun in construction projects of Pakistan. Investigation was carried out through questionnaire form prepared based on 55 common factors identified from literature. Survey was done amongst the representatives of the contractors involved in handling construction activities in Pakistan. A total of 46 responses gathered against 100 distributed forms were analysed statistically. The results obtained from the analyses based on Average Index values revealed that delay in obtaining permits from the governmental agencies, financial difficulties are common issue faced in construction works of Pakistan. The study also revealed that high cost of machinery & its maintenance, inadequate planning & scheduling and slow information flow between parties have significant effect on time overrun cost while critical factors affecting cost overrun are high cost of machinery & its maintenance, unsuitable construction methods and lack of experience of contractors in affecting project cost. The findings of this study will be helpful for the practitioner in planning for achieving timely completion of the projects and also within the estimated cost.


Construction is one of the most important employment sectors in India with very minimal research being done to identify the delay factors and causes that affect the construction Industry. The opinions of the construction professional required for the research was obtained by conduction interviews. A set of questions were circulated between the professionals working on the site to acquire the causes and effects of delays faced by them. To resolve the issues various studies and researches have been done by various researchers. The data analyzed in the research was done by using Relative Important Index (RII) which helpsto categories and rank the causes of delays according to the importance of the causes with respect to its contribution towards time delays, arbitration, litigation, cost overrun and total abandonment. Spearmen’s rank correlation coefficient was used compare the effect of delays between contractors, owners and consultants. In this paper, the research is aimed towards finding the effects of various causes on the various parties on construction sites of coastal parts of Mumbai and methods of minimization of the same.


2021 ◽  
Vol 6 (2) ◽  
pp. 074-089
Author(s):  
Emer Tucay Quezon ◽  
Arthur G. Ibanez

In highway construction projects, labor-oriented work is an integral part of the management process, requiring analysis of factors affecting labor productivity during Covid-19 pandemic. This research identified 53 influential factors affecting construction labor productivity at selected cities and towns in Cagayan Valley Region, Philippines. Due to the pandemic, the construction industries incurred substantial profit losses. More so, the construction workers are too much affected because of the Enhance Community Quarantine (ECQ) imposed by the local government. Results indicated there was laxity on the Covid-19 protocols. No health worker in the project site ranked the highest in the health & safety factor group with an RII of 0.97 and ranked 1st among 53 factors on the different groups. Besides, no safety engineer was assigned to the projects and ranked 2nd with an RII of 0.93. Among the 7 groups of factors, the health and safety group ranked 1st with 0.81, followed by the schedule compression group with an RII of 0.78. Hence, these two groups of factors have a strong relationship, as evidenced by number of workers reduced. It was learned that the contractors’ strategy was to increase the number of working days to cope with their schedules. Hypothesis testing supported that there are various significant factors influencing labor productivity loss during the Covid-19 pandemic, as suggested by more than 50% of the respondents.


2019 ◽  
Vol 19 (1) ◽  
Author(s):  
Hilary Omatule Onubia ◽  
Nor'Aini Yusof ◽  
Ahmad Sanusi Hassan

The characteristics of a project that makes it hard to understand, predict, and manage its general behavior despite the availability of required information relating to the project dynamics is referred to as project complexity. A good knowledge of project complexity at the construction phase of a project, as well as a well thought out plan to manage complexity will determine how proficiently construction projects are planned, managed, and executed in an environmentally friendly manner. The level of complexity of construction projects to a large extent determines the performance or otherwise of the projects with regards to achieving specific environmental standards. At construction sites, the effects of adopting green site practices on environmental performance is largely dependent on the level of complexity inherent in the project’s construction processes. This study investigates the moderating effects of project complexity on the relationship between various green construction site practices and environmental performance of construction projects. A survey was conducted on class A contractors in Nigeria and 168 usable responses were received. The data were analyzed using the partial least squares structural equation modelling technique. The results show that project complexity moderates the relationship between waste management and environmental performance, and the relationship between materials management and environmental performance. But project complexity does not moderate the relationship between energy management and environmental performance. The study provides important theoretical and practical information for construction managers in understanding the dynamics involved in managing of projects with different degrees of complexity, while adopting certain green site practices with the aim of delivering projects with high degree of environmental performance.


2016 ◽  
Vol 32 (1) ◽  
pp. 04015032 ◽  
Author(s):  
Jesper Kranker Larsen ◽  
Geoffrey Qiping Shen ◽  
Søren Munch Lindhard ◽  
Thomas Ditlev Brunoe

2013 ◽  
Vol 330 ◽  
pp. 862-866
Author(s):  
Seyyed Shahab Hosseinian ◽  
Zahra Jabbarani Torghabeh ◽  
Aziruddin Ressang

dentifying the root causes of construction accidents has indicated that not only contractors but designers and architectures are capable of influencing construction workers safety. The aim of this study is to investigate and prioritize factors affecting construction hazards in the design phase. To achieve the aim of this study, a questionnaire survey was distributed among respondents randomly selected from construction sites within Malaysia. Relative Importance Index method was used to prioritize factors in order of level of effect on construction hazards. The results indicated that Lack of designers safety knowledge, Lack of designers knowledge about construction processes and Late involvement of constructors in the design process have the highest level of effect while Lack of safety organizations which evaluates the safety level of design and Few application of components' prefabrication have the lowest level of effect on hazards in the design phase of construction projects.


2018 ◽  
Vol 162 ◽  
pp. 02032 ◽  
Author(s):  
Tareq Khaleel ◽  
Yasser Nassar

Productivity is a very important element in the estimation process in construction management. The objective of this research is to identify and analyze the factors which affect labor productivity in construction projects. In this research, 42 effective factors were collected from site survey, interview with engineers and experts, and previous research in the Arab world. These factors are grouped into Nine categories “Workforce, Leadership, Motivation, Supervisors, Safety, Project, Time, Material, and External”. A survey questionnaire of 70 respondents was distributed among different experts. A statistical analysis was done using SPSS and EXCEL packages. The Relative Importance Index was used to find out the most significant factors affecting the labor productivity in construction sites. The results accomplished from the survey revealed that the major factors negatively affect the labor productivity (ranked from the worst factor with Relative Importance Index values, respectively) namely, Availability Material (88.571%), Climate status “Weather” (88%), Religious occasions (86.29%), Number of working groups (86%), Ganger experience (85.714%), Workforce surveillance (84.857%), Ganger Age (84%), working at height (82%), Drawings and specifications alteration during execution (81.69%), and Sequence of floor (80.571%). Based upon these findings, this can help the construction professionals to improve the productivity and project performance in Iraq.


2010 ◽  
Vol 16 (4) ◽  
pp. 540-551 ◽  
Author(s):  
Adnan Enshassi ◽  
Faisal Arain ◽  
Sadi Al-Raee

The maximum project performance would be achieved if the work invariably flows smoothly within time limits and anticipated budget. Variation orders result in time delay, cost overrun, quality defects, and other negative impacts. This is common in construction projects in Gaza Strip. The main objective of this study was to analyze the causes of variation orders in construction projects in Gaza Strip. The causes of variation orders in construction process in Gaza Strip were investigated through questionnaire survey of 36 classified construction companies, 25 consultants and 15 owners. 64 causes of variation orders were identified from literature review. The study results identified the top ten most important factors that include lack of materials and equipment spare parts due to closure, change in design by consultant, lack of consultant's knowledge of available materials, errors and omission in design, conflicts between contract documents, owner's financial problems, lack of coordination among project parties, using inadequate specification for local markets by international consultant, internal politics, and change is specification by owners. In general, the study shows an agreement among owners, consultants and contractors regarding the ranking of the 64 factors causing variation orders. The results al‐so reveal that factors related to consultant are the most important causes of variation orders followed by the factors related to owner. An understanding of the causes of variation orders would be helpful for building professionals in assessing variation orders. Furthermore, the study would also assist professionals in taking proactive measures for reducing variation orders in construction projects. The findings from this study would also be valuable for all construction professionals in general. Santrauka Projektas bus efektyviausias, jei darbai vyks nuolatos ir sklandžiai, neviršijant terminu ir numatyto biudžeto. Del pake‐itimu nurodymu projektas užtrunka, viršijamos sanaudos, atsiranda kokybes trūkumu ir patiriamas kitoks neigiamas poveikis. Tai būdinga Gazos ruože vykstantiems statybu projektams. Pagrindinis šio tyrimo tikslas – išanalizuoti, kokios priežastys Gazos ruožo statybu projektuose lemia pakeitimu nurodymus. Priežastys, lemiančios pakeitimu nurodymus Gazos ruožo statybu procese, buvo tiriamos atlikus 36 tam tikros kategorijos statybos imoniu, 25 konsultantu ir 15 savininku apklausa. Apžvelgus literatūra nustatytos 64 pakeitimu nurodymus lemiančios priežastys. Atlikus tyrima, buvo nustatyti dešimt svarbiausiu veiksniu, iskaitant medžiagu ir atsarginiu irangos daliu trūkuma del uždarymo, projekto konsultanto pakeitimus, nepakankamas konsultanto žinias apie galimas medžiagas, projekto klaidas ir trūkumus, vienas kitam prieštaraujančius sutarties dokumentus, finansines savininko problemas, veiksmu koordinavimo trūkuma tarp projekto dalyviu, tarptautinio konsultanto naudojamas vietiniu rinku neatitinkančias specifikacijas, vidaus politika ir savininku pakeitimus specifikacijoje. Apskritai tyrimas rodo, kad savininkai, konsultantai ir rangovai sutaria del to, kaip pagal svarba išsidesto 64 veiksniai, lemiantys pakeitimu nurodymus. Be to, rezultatai rodo, kad su konsultantu susije veiksniai yra svarbiausios pakeitimu nurodymu priežastys, o antroje vietoje – su savininku susije veiksniai. Statybu specialistams suprantant, kokios priežastys lemia pakeitimu nurodymus, tokius nurodymus jiems vertinti būtu lengviau. Be to, tyrimas padetu specialistams imtis aktyviu priemoniu, kad statybu projektuose pakeitimu nurodymu būtu mažiau. Šio tyrimo išvados taip pat būtu naudingos visiems statybu specialistams apskritai.