Environmental Aspects Of The Use And Disposal Of Non Aqueous Drilling Fluids Associated With Offshore Oil & Gas Operations

Author(s):  
H.R. Melton ◽  
J.P. Smith ◽  
H.L. Mairs ◽  
R.F. Bernier ◽  
E. Garland ◽  
...  
2010 ◽  
Vol 30 (3) ◽  
pp. 143-148
Author(s):  
Yong ZHANG ◽  
Guolin XIAO ◽  
Yongjun HE ◽  
Jiashu GUO

Author(s):  
David McLaurin ◽  
Alan Aston ◽  
John Brand

Abstract It has been observed that, although submarine power cables have a critical role to wind power arrays and power export to shore, they are often overlooked at early stages of projects and oversimplified during late stages. This leads to lack of attention given during cable design and planning, as well as pressured schedules during manufacturing, testing and installation. The significant number of incidents attributed to offshore submarine cables during construction has increased overall project risk, lowered system average power availability and increased insurance costs. Lack of proper routing can also result in an inability to maintain asset integrity for the project design life. Despite the attention that submarine power cables have received over the past few years, the number and cost of incidents does not appear to be decreasing. A comparison can be made between offshore HVAC and HVDC cables used for wind power and offshore umbilicals and MV cables used in the oil and gas sector. These umbilicals are often similar in weight, size and bending stiffness, and have similar design, manufacturing, routing and installation challenges, but with a fraction of the incidents observed with offshore wind array and export cables. An additional caveat is that the offshore oil and gas sector has achieved a reliable track record while installing and maintaining these umbilicals and cables in fully dynamic conditions (ultra-deep water) as well static conditions. One primary difference between how the oil and gas sector executes these systems are design, planning and specification from an early stage of the project. Significant attention is given at an early stage to quality control, including offshore routing and umbilical testing specifically to avoid incidents resulting in umbilical damage due to the tension and crushing forces during installation as well as ambient seawater and seabed interaction. Management of these risks are documented, and optimal mitigation strategies are implemented early in the design phase. This paper will discuss the types of incidents which have been observed during construction and installation of submarine HVAC/HVDC cables in the wind power sector and how they could have been prevented by normal practices of the offshore oil/gas sector from early design and planning all the way to installation and commissioning.


2022 ◽  
Vol 139 ◽  
pp. 362-380
Author(s):  
James Njuguna ◽  
Shohel Siddique ◽  
Lorraine Bakah Kwroffie ◽  
Siwat Piromrat ◽  
Kofi Addae-Afoakwa ◽  
...  

2015 ◽  
Author(s):  
Karina F. Souza ◽  
Olivier Benyessaad

Nowadays there is a greater demand in the Oil & Gas Industry for production efficiency and sustainability while it is necessary to ensure the process safety and quality. As a guideline, this paper will start describing the existent hazards in a typical offshore unit, focusing mainly the personnel safety. Then it will detail the differences among the studies which can be performed in order to identify and assess such hazards and consequently to perform a complete Risk Assessment, which is the key step for a successful Risk Management. Additionally, it will be demonstrated the reasons why a Risk Management is necessary to ensure safety in an Oil & Gas installation in the most optimized manner.


PLoS ONE ◽  
2016 ◽  
Vol 11 (4) ◽  
pp. e0153320 ◽  
Author(s):  
Victoria Louise Georgia Todd ◽  
Jane Clare Warley ◽  
Ian Boyer Todd

2010 ◽  
Vol 439-440 ◽  
pp. 1624-1627
Author(s):  
Wen Pei Zheng ◽  
Jian Chun Fan ◽  
Lai Bin Zhang ◽  
Dong Wen

Oil well tubing is used in oil extraction in offshore oil well. Under the force of tubular columns, erosion and pressure of drilling fluids, the oil well tubing usually fails in long-term service, which always leads to accidents and stagnation of production. So it’s especially necessary to detect faults in tubing. Intense-magnetic memory testing equipment for reusable offshore oil well tubing is developed for this consideration. The equipment is composed of feeding machines, baiting machines, transport machines and a detection machine. Measurement and control system decides the running sequence logic of these components and obtains fault signals of tubing. The avoidance of transport machines for oil well tubing coupling makes the transport of tubing stable. The synchronization control of transport and detection of tubing decides the accurate location of faults. The automatic switch of both detection units and measurement of fault signals makes it convenient to detect oil well tubing of multiple sizes.